Business

September 6, 2012

AeroVironment receives $16.5 million of funding from U.S. Army for RQ-11B Raven

AeroVironment, Inc. has received $16,472,298 in additional funding to perform on Aug. 10, 2012, from the United States Army under a contract action with a total projected value of $65,889,191.

The company announced the initial $15.8 million funding of that contract action on June 1, 2012.

The overall contract action includes RQ-11B Raven systems, new miniature gimbaled payloads and initial spares packages and is funded from the Army’s fiscal 2012 procurement budget. Delivery of systems, spares and payloads is scheduled for completion by June 30, 2013.

Weighing 450 grams, the ruggedized, multi-axis Mantis i23 payload for the Raven system houses an electro-optical and infrared thermal video sensor in addition to a laser illuminator. The single payload replaces two separate sensor payloads on the Raven air vehicle, delivering daytime and nighttime capabilities from a single package.

“The Army is quickly and easily integrating the new miniature gimbaled payload into the Raven systems because of its reliability in providing superior imagery and tracking capability in harsh environments,” said Roy Minson, AeroVironment senior vice president and general manager, Unmanned Aircraft Systems. “We anticipate our new payload, an example of our focus on continuous and cost-effective capability enhancement for the warfighter, will become a standard component of currently fielded and future Raven systems.”

The RQ-11B Raven unmanned aircraft system is a 4.2-pound, backpackable, hand-launched sensor platform that provides day and night, real-time video imagery wirelessly to a portable ground control station for “over the hill” and “around the corner” reconnaissance, surveillance and target acquisition in support of tactical units. U.S. armed forces use Raven systems extensively for missions such as base security, route reconnaissance, mission planning and force protection. Each Raven system typically consists of three aircraft, two ground control stations and spares.

 




All of this week's top headlines to your email every Friday.


 
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. â...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 

General Dynamics to continue work on U.S. Air Force GPS III program

General Dynamics Advanced Information Systems, a business unit of General Dynamics, has been awarded a $25.4 million full-production contract from Lockheed Martin to support the U.S. Air Force Global Positioning System (GPS) III Network Communications Element for space vehicles seven and eight. The Air Force’s next-generation GPS III satellites will improve position, navigation and timing...
 

 

Javelin joint venture demonstrates vehicle-mounted missile launch

The Raytheon and Lockheed Martin Javelin Joint Venture recently fired a Javelin missile from a remote weapon station integrated onto a wheeled vehicle at Redstone Arsenal in Huntsville, Ala. The test demonstrated Javelin’s vehicle-launch capability to an international customer that has expressed interest in purchasing vehicles integrated with Javelin. The Javelin missile launched successfully...
 
 

Royal Australian Air Force scores direct hit with JSOW C

The Royal Australian Air Force has successfully tested a Raytheon Joint Standoff Weapon C against a hardened wall target at the RAAF Woomera Test Range. Launched from an F/A-18F Super Hornet at an operationally representative stand-off range and altitude of 25,000 feet, the JSOW C scored a direct hit. The RAAF test marked the third...
 
 

Boeing to assemble 787-10 Dreamliner in South Carolina

Boeing announced July 30 that final assembly of the 787-10, the newest and longest member of the 787 Dreamliner family of airplanes, will take place exclusively in North Charleston, S.C. Boeing will continue to assemble both 787-8s and 787-9s in Everett, Wash., and North Charleston. Design of the 787-10 is underway in Everett, with final...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>