Defense

September 6, 2012

Navy signs specification document for the Ohio replacement submarine program

The Navy formalized key ship specifications for both the United States’ Ohio Replacement and United Kingdom’s Successor Programs in a document signed Aug. 31 at the Washington Navy Yard.

Rear Adm. Thomas J. Eccles, chief engineer and deputy commander Naval Systems Engineering Directorate, Naval Sea Systems Command (NAVSEA) and Capt. William J. Brougham, Ohio Replacement program manager signed the Ohio Replacement First Article Quad Pack Ship Specification document, marking a major construction milestone.

“This document marks significant forward progress for both the U.S. and U.K. future strategic submarine deterrent programs,” said Brougham. “It is a direct result of the engineering rigor and professionalism of government and industry partners on both shores of the Atlantic.”

Ship specifications are critical for the design and construction of the common missile compartment, which will be used by both nations’ replacement fleet ballistic missile submarine (SSBN) programs. Specifically, the First Article Quad Pack Ship Specification establishes a common design and technical requirements for the four missile tubes and associated equipment that comprise each quad pack.

“The Ohio Replacement Program will serve as the backbone of our nation’s nuclear deterrence into the 2080s,” said Eccles. “It is vital that we perform the rigorous engineering, research, and design work now so that we can ensure that the platform is able to address and best the threats of future highly complex national security environments.”

The Ohio Replacement SSBN Program is tasked with recapitalizing the nation’s sea-based strategic deterrent in a cost-effective manner. The Navy plans to replace its current fleet of 14 Ohio-class SSBNs with only 12 Ohio Replacement SSBNs. The first Ohio Replacement is scheduled to begin construction in fiscal year 2021, deliver to the Navy in 2027, and conduct its first strategic deterrence patrol in 2031 after undergoing a rigorous testing and evaluation regime.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines February 25, 2015

News: Army to send headquarters group to Kandahar in first sign of revision to Afghan withdrawal plan - In the first official sign that the Pentagon plans to keep a U.S. military presence in southern Afghanistan after this year, the Army is sending the 7th Infantry Division headquarters from Joint Base Lewis-McChord on a year-long deployment...
 
 

News Briefs February 25, 2015

Lithuania restores compulsory military service Lithuania will restore compulsory military service for young men as tensions in Ukraine continue to worry the small Baltic nation, the government said Feb. 24. After a meeting of military leaders and top government officials, President Dalia Grybauskaite said the measure was necessary because of growing aggression in Ukraine. Military...
 
 
Sensor Concepts Inc. photograph

Air Force Research Labís handheld imaging tool expands aircraft inspection capability

Sensor Concepts Inc. photograph An operator demonstrates the portability of the handheld imaging tool. The technology provides maintainers the ability to evaluate aircraft in the field to ensure mission-readiness. When pilots c...
 

 

Boeing, Royal Australian Air Force test extended range weapon

The Boeing Joint Direct Attack Munition Extended Range demonstrated significant range increase while maintaining its expected accuracy during flight testing conducted by Boeing and the Royal Australian Air Force. The testing centered on a new wing kit that, when used in conjunction with the weaponís guidance kit, increases the bomb’s range from approximately 15 miles...
 
 

DRS Technologies to provide comm systems for Royal New Zealand Navy frigates

DRS Technologies Inc., a Finmeccanica Company, announced Feb. 25 that its Canadian subsidiary will be providing tactical integrated communications systems to the New Zealand Ministry of Defense for the Royal New Zealand Navy’s ANZAC-class frigates. This subcontract was awarded to DRS Technologies Canada Ltd. in support of a communications modernization contract from Lockheed Martin Canada...
 
 

Northrop Grumman LITENING achieves two million operating hour milestone

In the life cycle of every military system, some milestones stand out as signature achievements. One million operating hours is one of them – and Northrop Grumman’s fielded AN/AAQ-28(V) LITENING pods have hit that number for the second time. “This is a significant milestone for the LITENING program and our team is proud to be...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>