In the news...

September 17, 2012

Weather postpones Endeavour ferry flight

NASA’s planned ferry flight of space shuttle Endeavour atop the 747 Shuttle Carrier Aircraft has been postponed until Sept. 18 due to an unfavorable weather forecast for Sept. 17.

To ensure a safe flight for Endeavour and the SCA, NASA managers, in consultation with the California Science Center, decided Sunday to delay the flight because of inclement weather predicted along the flight path between Houston and NASA’s Kennedy Space Center, where the flight will originate.

On Oct. 11, 2011, NASA transferred title and ownership of Endeavour to the California Science Center in Los Angeles. Despite the one-day delayed departure from Kennedy, NASA still plans to transport Endeavour to Los Angeles International Airport by Sept. 20.

In cooperation with the Federal Aviation Administration, the SCA is scheduled to conduct low-level flyovers at about 1,500 feet above locations along the planned flight path. The exact timing and path of the ferry flight will depend on weather conditions and operational constraints. Some planned flyovers or stopovers could be delayed or cancelled. If the ferry flight is postponed again, an additional advisory will be issued.

At sunrise on Sept. 18, the SCA and Endeavour will depart Kennedy’s Shuttle Landing Facility and perform a flyover of various areas of the Space Coast, including Kennedy, the Kennedy Space Center Visitor Complex, Cape Canaveral Air Force Station and Patrick Air Force Base.

The aircraft will fly west and conduct low flyovers of NASA’s Stennis Space Center in Mississippi and the agency’s Michoud Assembly Facility in New Orleans. As it arrives over the Texas Gulf Coast area, the SCA will perform low flyovers above various areas of Houston and Clear Lake before landing at Ellington Field near NASA’s Johnson Space Center.

At sunrise on Wednesday, Sept. 19, the aircraft will depart Houston, make a refueling stop at Biggs Army Airfield in El Paso, Texas, and conduct low-level flyovers of White Sands Test Facility near Las Cruces, N.M., and NASA’s Dryden Flight Research Center at Edwards Air Force Base in California, before landing around mid-day at Dryden.

On the morning of Sept. 20, the SCA and Endeavour will take off from Dryden and perform a low-level flyover of northern California, passing near NASA’s Ames Research Center at Moffett Field, Calif., and various landmarks in multiple cities, including Sacramento and San Francisco. The aircraft also will conduct a flyover of many Los Angeles sites before landing about 11 a.m. PDT at LAX.

Social media users are encouraged to share their Endeavour sightings using the hashtags #spottheshuttle and #OV105, Endeavour’s orbiter vehicle designation.

After arrival at LAX, Endeavour will be removed from the SCA and spend a few weeks at a United Airlines hangar undergoing preparations for transport and display.

Endeavour then will travel through Inglewood and Los Angeles city streets on a 12-mile journey from the airport to the science center, arriving in the evening on Oct. 13.

Beginning Oct. 30, the shuttle will be on display in the science center’s Samuel Oschin Space Shuttle Endeavour Display Pavilion, embarking on its new mission to commemorate past achievements in space and educate and inspire future generations of explorers.

Endeavour completed 25 missions, spent 299 days in orbit, and orbited Earth 4,671 times while traveling 122,883,151 miles.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 1, 2014

News: Military downsizing leaves U.S. too weak to counter global threats, panel finds - An independent panel appointed by the Pentagon and Congress said July 31 that President Obama’s strategy for sizing the armed services is too weak for today’s global threats. Defense industry funds flow to contenders for key House chairmanships - Four of the top...
 
 

News Briefs August 1, 2014

China allows foreign reporters at news conference Foreign reporters are being allowed to attend China’s Defense Ministry briefings for the first time, marking a small milestone in the increasingly confident Chinese military’s efforts to project a more transparent image. Restrictions still apply and there is no sign of an improvement in the generally paltry amount...
 
 
Army photograph by John Andrew Hamilton

Rapid Equipping Force, PEO Soldier test targeting device at White Sands Missile Range

Army photograph by John Andrew Hamilton SFC Justin Rotti, a combat developer from the Training and Doctrine Command Fire Cell, Fires Center of Excellence, uses a developmental hand held precision targeting device during a test ...
 

 

NASA awards modification for geophysics, geodynamics, space geodesy support contract

NASA has awarded a modification to Stinger Ghaffarian Technologies Inc. of Greenbelt, Md. to continuing working the the Geophysics, Geodynamics and Space Geodesy Support Services contract. The maximum ordering value of the GGSG contract will increase to $76.8 million. The previous amount was $49.5 million. The increase in the maximum ordering value of the contract...
 
 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>