Business

September 18, 2012

Lockheed Martin awarded $35.98 million contract to solidify long range radar requirement for 3DELRR program

The 3DELRR is intended to serve as the principal long-range, ground-based sensor for detecting, identifying, tracking, and reporting aerial targets for the Air Force.

The U.S. Air Force awarded Lockheed Martin a nearly $36 million contract for the next part of its Three Dimensional Expeditionary Long Range Radar program.

The 3DELRR is intended to serve as the principal long-range, ground-based sensor for detecting, identifying, tracking, and reporting aerial targets for the Air Force.

The system, which will replace the AN/TPS-75 air surveillance radar, will be capable of detecting new, emerging air defense threats and managing challenging battlefield air control scenarios out to extended ranges.

Under the Pre-Engineering and Manufacturing Development (Pre-EMD) Period of the Technology Development Phase, the Air Force is expected to review industry trade studies to help set final radar requirements, conduct preliminary design reviews, and demonstrate radar system-level technology maturity. At the end of this 15-month phase, the Air Force is expected to award an EMD and low-rate production contract.

Lockheed Martin has 178 long-range radars operational around the world and has made significant investments to reduce risk and drive affordability for the 3DELRR program.

“We need to give battlefield commanders the most response time possible to detect and prosecute emerging threats. Only advanced technology long-range radar like 3DELRR can do that,” said Mark Mekker, director of ground-based surveillance radar for Lockheed Martin’s Mission Systems & Sensors business. “Our 3DELRR technology is mature, focused on not just performing now, but evolving and extending system life as required. We can offer that radar to the U.S. Air Force today.”

In December 2010, Lockheed Martin unveiled a functioning full-scale system prototype as proof of the radar’s maturity. At the time, the radar’s design addressed 100 percent of 3DELRR requirements, including critical extended air surveillance reach for early warning from threats, such as aircraft and ballistic missiles. This was the second and final demonstration required under a $25 million, 20-month technology development contract awarded in May 2009.

Work on the 3DELRR program is performed at the company’s Syracuse, N.Y. and Moorestown, N.J. facilities.




All of this week's top headlines to your email every Friday.


 
 

 

Unmanned aircraft partnership reaches major milestone

A team of research students and staff from Warsaw University of Technology have successfully demonstrated the first phase of flight test and integration of unmanned aircraft platforms with an autonomous mission control system. The demonstration marks a significant milestone in a partnership between the university and Lockheed Martin that began earlier this year. This is...
 
 

Raytheon delivers first Block 2 Rolling Airframe Missiles to US Navy

Raytheon delivered the first Block 2 variant of its Rolling Airframe Missile system to the U.S. Navy as part of the company’s 2012 Low Rate Initial Production contract. RAM Block 2 is a significant performance upgrade featuring enhanced kinematics, an evolved radio frequency receiver, and an improved control system. “As today’s threats continue to evolve,...
 
 
Navy photograph

General Dynamics delivers submarine on schedule and, under target cost

Navy photograph The PCU North Dakota (SSN 784) during bravo sea trials. The crew performed exceptionally well on both alpha and bravo sea trials. The submarine North Dakota is the 11th ship of the Virginia class, the first U.S....
 

 
boeing-xiamen

Boeing, Xiamen Airlines celebrate airline’s first 787 Dreamliner Delivery

Boeing and Xiamen Airlines Aug. 29 celebrated the delivery of the airline’s first 787 Dreamliner. “We are excited to receive our first 787 Dreamliner which is also the first widebody airplane of our all-Boeing fleet...
 
 
LM-C5

Double Deuce

A U.S. Air Force crew ferried the 22nd C-5M Super Galaxy from the Lockheed Martin facilities in Marietta, Ga., Aug. 25. Aircraft 86-0011 was ferried by a crew led by Maj. Gen. Dwyer L. Dennis, Director, Global Reach Programs, O...
 
 
Northrop Grumman photograph

First ever RQ-4 Global Hawk hits 100th flight on NASA mission

Northrop Grumman photograph A historical look at the first Global Hawk (AV1) during its maiden flight over Edwards Air Force Base, Calif., on Feb. 28, 1998. AV1 has made history again with its 100th flight in support of NASA en...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>