Business

September 18, 2012

Lockheed Martin awarded $35.98 million contract to solidify long range radar requirement for 3DELRR program

The 3DELRR is intended to serve as the principal long-range, ground-based sensor for detecting, identifying, tracking, and reporting aerial targets for the Air Force.

The U.S. Air Force awarded Lockheed Martin a nearly $36 million contract for the next part of its Three Dimensional Expeditionary Long Range Radar program.

The 3DELRR is intended to serve as the principal long-range, ground-based sensor for detecting, identifying, tracking, and reporting aerial targets for the Air Force.

The system, which will replace the AN/TPS-75 air surveillance radar, will be capable of detecting new, emerging air defense threats and managing challenging battlefield air control scenarios out to extended ranges.

Under the Pre-Engineering and Manufacturing Development (Pre-EMD) Period of the Technology Development Phase, the Air Force is expected to review industry trade studies to help set final radar requirements, conduct preliminary design reviews, and demonstrate radar system-level technology maturity. At the end of this 15-month phase, the Air Force is expected to award an EMD and low-rate production contract.

Lockheed Martin has 178 long-range radars operational around the world and has made significant investments to reduce risk and drive affordability for the 3DELRR program.

“We need to give battlefield commanders the most response time possible to detect and prosecute emerging threats. Only advanced technology long-range radar like 3DELRR can do that,” said Mark Mekker, director of ground-based surveillance radar for Lockheed Martin’s Mission Systems & Sensors business. “Our 3DELRR technology is mature, focused on not just performing now, but evolving and extending system life as required. We can offer that radar to the U.S. Air Force today.”

In December 2010, Lockheed Martin unveiled a functioning full-scale system prototype as proof of the radar’s maturity. At the time, the radar’s design addressed 100 percent of 3DELRR requirements, including critical extended air surveillance reach for early warning from threats, such as aircraft and ballistic missiles. This was the second and final demonstration required under a $25 million, 20-month technology development contract awarded in May 2009.

Work on the 3DELRR program is performed at the company’s Syracuse, N.Y. and Moorestown, N.J. facilities.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines October 24, 2014

News: U.S., South Korea delay transfer of wartime control - The U.S. and South Korea have delayed transferring wartime operational control of allied forces by taking on a “conditions-based approach” and scrapping the previously set deadline of 2015.   Business: Exclusive: Lockheed, Pentagon reach $4 billion deal for more F-35 jets - Lockheed Martin and U.S. defense...
 
 

News Briefs October 24, 2014

French moving troops toward Libyan border A top French military official says the country is moving troops toward the Libyan border within weeks and, along with U.S. intelligence, is monitoring al Qaeda arms shipments to Africa’s Sahel region. A French base will go up within weeks in a desert outpost just a hundred kilometers (60...
 
 
Navy photograph

Navy to commission submarine North Dakota

Navy photograph The PCU North Dakota (SSN 784) during bravo sea trials. The crew performed exceptionally well on both alpha and bravo sea trials. The submarine North Dakota is the 11th ship of the Virginia class, the first U.S....
 

 

Boeing announces SF Airlines order for Boeing converted freighters

Boeing announced Oct. 23 that SF Airlines has placed an order for an undisclosed number of 767-300ER passenger-to-freighter conversions (Boeing Converted Freighters). SF Airlines, a subsidiary of Shenzhen, China-based delivery services company SF Express, will accept its first redelivered 767 in the second half of 2015. “SF Express aims to become China’s most respected and...
 
 
LM-C130

Another Super Herc Little Rock Rollin’

  Lockheed Martin delivered another C-130J Super Hercules to the 61st Airlift Squadron at Little Rock Air Force Base, Ark., Oct. 23. Little Rock AFB’s new C-130J was ferried from the Lockheed Martin Aeronautics facility ...
 
 

United Technologies beats third quarter profit expectations

United Technologies Corp. Oct. 23 reported third-quarter profit of $1.85 billion as sales increased across all its businesses and the aerospace giant reported favorable tax settlements. The Hartford, Conn.,-based company said it had profit of $2.04 per share and earnings, adjusted for non-recurring gains, came to $1.82 per share. The results topped Wall Street expectations,...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>