Business

September 25, 2012

U.S. Army, Navy demonstrate JLENS’ ability to defeat anti-ship cruise missile

A recent U.S. Army and Navy test proved the Raytheon JLENS can integrate with defensive systems currently in the U.S. Navy’s inventory to provide, for the first time, overland cruise missile defense from the sea.

During the test, a JLENS’ fire-control radar acquired and tracked a surrogate anti-ship cruise missile target. The track information was passed to sailors via the Raytheon-made Cooperative Engagement Capability sensor-netting system. The sailors then fired a Raytheon-made Standard Missile-6 at the target. Initial SM-6 guidance used targeting information provided by the JLENS via CEC to the Aegis Weapon System until the SM-6′s onboard radar was able to acquire and track the target.

“JLENS has demonstrated its ability to integrate with other components of Naval Integrated Fire Control-Counter Air, significantly expanding the force’s cruise missile defense umbrella,” said Dean Barten, the U.S. Army’s JLENS product manager. “Commanders can detect threats shortly after they are launched with JLENS’ 360-degree, long-range surveillance capability, while the JLENS integrated fire-control radar enables commanders to more effectively employ weapons like the Standard Missile 6.”

“JLENS is a proven asset that, when deployed, will protect U.S. and coalition lives,” said Dave Gulla, vice president of Global Integrated Sensors in Raytheon’s Integrated Defense Systems business. “JLENS’ long-range surveillance capability extends the battlespace and gives commanders more time to identify and respond to incoming threats, instead of the handful of seconds they have today.”

About JLENS

JLENS is an elevated, persistent over-the-horizon sensor system. It uses a powerful integrated radar system to detect, track and target a variety of threats. This capability better enables commanders to defend against threats, including hostile cruise missiles, low-flying manned and unmanned aircraft, and moving surface vehicles such as boats, SCUD launchers, automobiles, trucks and tanks. JLENS also provides ascent phase detection of tactical ballistic missiles and large-caliber rockets.

  • A JLENS system, referred to as an orbit, consists of two tethered, 74-meter aerostats connected to mobile mooring stations and communications and processing groups.
  • The aerostats fly as high as 10,000 feet and can remain aloft and operational for up to 30 days.
  • One aerostat carries a surveillance radar, while the other carries a fire control radar.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines October 20, 2014

News: Navy grounds ‘Top Guns’ - The F/A-18s needs spare parts and in too many cases they’re being taken from brand new jets. This is a risk to national security and pilots’ lives.   Business: Boeing seeks revised schedule for U.S. aerial tanker - Boeing is revising its master schedule for developing the new U.S. Air Force...
 
 

News Briefs October 20, 2014

New military medical team to help with Ebola in U.S. Defense Secretary Chuck Hagel has ordered the military to prepare and train a 30-member medical support team that could provide short-term help to civilian health professionals if there are more Ebola cases in the United States. His spokesman, Rear Adm. John Kirby, says the team...
 
 

Dragon ‘fires up’ for flight

The Air Force and NATO are undergoing a cooperative development effort to upgrade the avionics and cockpit displays of AWACS aircraft belonging to the 552nd Air Control Wing at Tinker Air Force Base, Okla., and the NATO E-3 Sentrys from Geilenkirchen, Germany. The Diminishing Manufacturing Sources Replacement of Avionics for Global Operations and Navigation, otherwise...
 

 
Boeing photographs

Boeing-built X-37B successfully completes third flight

Unmanned spacecraft concludes record-setting 674-day mission   Boeing photograph A third mission of the Boeing-built X-37B Orbital Test Vehicle was completed on Oct. 17, 2014, when it landed and was recovered at Vandenberg...
 
 

Boeing concludes commercial crew space act agreement for CST-100/Atlas V

Boeing has successfully completed the final milestone of its Commercial Crew Integrated Capability Space Act Agreement with NASA. The work and testing completed under the agreement resulted in significant maturation of Boeing’s crew transportation system, including the CST-100 spacecraft and Atlas V rocket. NASA in July approved the Critical Design Review Board milestone for Boeing’...
 
 

AF to release small business research solicitations

The Air Force Small Business Innovation Research and Small Business Technology Transfer program office is set to release its fiscal year 2015 list of topics Oct. 22, on the SBIR/STTR website.  Small businesses and research institutions with expertise to address the topics’ technology challenges are encouraged to submit proposals. During 2014, the Defense Department SBIR...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>