Space

September 28, 2012

NASA Orion splashdown tests ensure safe landings for astronauts


The 18,000-pound test article that mimics the size and weight of NASA’s Orion spacecraft crew module recently completed a final series of water impact tests in the Hydro Impact Basin at the agency’s Langley Research Center in Hampton, Va.

The campaign of swing and vertical drops simulated various water landing scenarios to account for different velocities, parachute deployments, entry angles, wave heights and wind conditions the spacecraft may encounter when landing in the Pacific Ocean. The next round of water impact testing is scheduled to begin in late 2013 using a full-sized model that was built to validate the flight vehicle’s production processes and tools.

Orion will carry astronauts farther into space than ever before and be the most advanced spacecraft ever designed. It will fly its first flight test, designated Exploration Flight Test 1, in 2014. The spacecraft will travel more than 3,600 miles into space – 15 times farther from Earth than the International Space Station – and reach speeds of more than 20,000 mph before returning to Earth. This unmanned flight test will launch from Cape Canaveral Air Force Station in Florida. Several Orion systems, including the heat shield and parachutes at speeds generated during a return from deep space, will be tested.

In 2017, Orion will be launched by NASA’s Space Launch System, a heavy-lift rocket that will provide an entirely new capability for human exploration beyond low Earth orbit. Designed to be flexible for launching spacecraft for crew and cargo missions, SLS will enable new missions of exploration and expand human presence in the solar system.

Langley’s Hydro Impact Basin is 115 feet long, 90 feet wide and 20 feet deep, and is located at the historic Landing and Impact Research Facility where Apollo astronauts trained for moonwalks.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 24, 2015

News: More than $1 billion in U.S. emergency reconstruction aid goes missing in Afghanistan - A total of $1.3 billion that the Pentagon shipped to its force commanders in Afghanistan between 2004 and 2014 for the most critical reconstruction projects can’t be accounted for by the Defense Department, 60 percent of all such spending under an...
 
 

News Briefs April 24, 2015

German defense minister: widely used rifle has no future A widely used assault rifle has “no future” with the German military in its current form, Germany’s defense minister said April 22, escalating a dispute over the weapon’s alleged shortcomings. Ursula von der Leyen said last month that a study showed the G36 rifle has a...
 
 
Army photograph

Composites key to tougher, lighter armaments

Army photograph XM-360 test firing at Aberdeen Proving Ground, Md., in 2007, is shown. The Army is on the cusp of revolutionizing materials that go into armament construction, making for stronger, lighter and more durable weapo...
 

 

Northrop Grumman signs long-term agreement with Raytheon

Northrop Grumman has entered a long-term agreement with Raytheon to supply its LN-200 Inertial Measurement Unit for Raytheon optical targeting systems. The long-term agreement with Raytheon’s Space and Airborne Systems business extends through 2018. The LN-200 provides camera stabilization on optical targeting systems that conduct long-range surveillance and target acquisition for various...
 
 

NTTR supports first F-35B integration into USMC’s weapons school exercise

The Nevada Test and Training Range was part of history April 21, when four U.S. Marine Corps-assigned F-35B Lightning IIs participated in its first Marine Corps’ Final Exercise of the Weapons and Tactics Instructor course on the NTTR’s ranges. The Final Exercise, or FINEX, is the capstone event to the U.S. Marine Corps Marine Aviation...
 
 
AAR-Textron

AAR awarded new contract from Bell Helicopter Textron to support T64 engines

AAR announced April 22 that Bell Helicopter Textron Inc. awarded its Defense Systems & Logistics business unit a contract providing warehouse and logistics services in support of upgrading T64 engines for the Bell V-280 Val...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>