Business

October 3, 2012

Army awards General Dynamics $395 million to begin engineering development for Abrams modernization

The U.S. Army TACOM Contracting Command has awarded General Dynamics Land Systems, a business unit of General Dynamics, an eight-year, $395 million contract for research, development and testing in preparation for the Abrams main battle tank Engineering Change Proposal 1 (ECP1) production.

The contract has an initial value of $80 million over 12 months. There is no tank production work associated with this award.

The Abrams ECP1 program is an engineering-development effort focused on integrating a group of system improvements into a single upgrade program for the M1A2SEPv2 baseline tank. The objective of this research-and-development effort is to prepare the Abrams tank to accept additional Army-directed requirements in the future without impacting current vehicle performance. The Army plans to begin low rate initial production of tanks with ECP1 upgrades in 2017.

“This award shows the Army’s long-term commitment to improving the Abrams tank’s capabilities for the warf ighter, while ensuring that platforms are able to integrate planned and future upgrades,” said Donald Kotchman, vice president for Heavy Brigade Combat Teams at General Dynamics Land Systems. “This effort will maintain Abrams’ position as the leading main battle tank in the world.”

Since its initial fielding in 1980, enhancements to the Abrams main battle tank have consumed much of the available space, weight and power capacity on the vehicle. ECP1 will reengineer internal systems to reduce size, weight and power requirements, creating capacity for additional upgrades in the future. The effort will include miniaturization of electronics; evolving to a Line Replaceable Module (LRM)-based electronics architecture; and increasing electrical capacity through improved power generation, distribution and management.

In addition, when implemented, ECP1 upgrades will improve Abrams’ survivability by enhancing armor and adding the capability to employ current and advanced counter-IED equipment.

Work will be performed by existing employees in Sterling Heights, Mich. The contract will be completed by 2020. The Abrams main battle tank is planned to be an active component of the Army’s fleet through 2050.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 6, 2015

News Long wait to come to America for Iraqis, Afghans who served U.S. troops Long wait times and a shortage of available visas for a huge backlog of applications remain major issues for the U.S. government’s Special Immigrant Visa program intended to ease entry to the United States for Iraqis and Afghans who served as...
 
 

News Briefs July 6, 2015

Russian MiG fighter crashes in southern Russia, pilot lives The Russian Defense Ministry says a Russian air force fighter jet has crashed in the south but its pilot ejected safely. The MiG-29 fighter jet went down July 3 near the village of Kushchevskaya in the Krasnodar region, 620 miles south of Moscow. The ministry said...
 
 
Army photograph by Doug LaFon

Army researcher’s interest in robotics leads to innovative device

Army photograph by Doug LaFon Dan Baechle, left, from the U.S. Army Research Laboratory Multifunctional Materials research team, has created a laboratory prototype of a device he designed to sense and damp out arm tremors for A...
 

 
Air Force photograph by TSgt. Joseph Swafford

Pave Hawk maintainers keep rescue birds flying

Air Force photograph by TSgt. Joseph Swafford Airman Joshua Herron, a 41st Expeditionary Helicopter Maintenance Unit HH-60 Pave Hawk crew chief, completes a 50-hour inspection on a Pave Hawk at Bagram Airfield, Afghanistan, Jun...
 
 
Air Force photograph by SrA. Benjamin Raughton

B-52s demonstrate strategic reach

Air Force photograph by SrA. Benjamin Raughton A B-52H Stratofortress is marshalled to a stop at Barksdale Air Force Base, La., after a 44-hour sortie July 2, 2015. Aircrew members and two B-52s from Barksdale AFB’s 96th ...
 
 

Soldier missing from Korean War accounted for

The Department of Defense POW/MIA Accounting Agency announced July 1 that the remains of a serviceman, missing from the Korean War, have been identified and will be returned to his family for burial with full military honors. Army Sgt. Joseph M. Snock Jr. of Apollo, Pennsylvania, was buried July 6, in Arlington National Cemetery. In...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>