Space

October 3, 2012

NASA awards space launch system advanced booster contracts

NASA has awarded three contracts totaling $137.3 million to improve the affordability, reliability and performance of an advanced booster for the Space Launch System.

The awardees will develop engineering demonstrations and risk reduction concepts for a future version of the SLS, a heavy-lift rocket that will provide an entirely new capability for human exploration beyond low Earth orbit.

The initial 77-ton (70-metric-ton) SLS configuration will use two 5-segment solid rocket boosters similar to the boosters that helped power the space shuttle to orbit. The evolved 143-ton (130-metric-ton) SLS vehicle will require an advanced booster with more thrust than any existing U.S. liquid- or solid-fueled boosters. These new initiatives will demonstrate and examine advanced booster concepts and hardware demonstrations during a 30-month period.

The companies selected for SLS Advanced Booster contracts are:

 

  • ATK Launch Systems Inc. of Brigham City, Utah, which will demonstrate innovations for a solid-fueled booster. The contract addresses the key risks associated with low-cost solid propellant boosters, particularly in the areas of composite case design and development, propellant development and characterization, nozzle design and affordability enhancement, and avionics and controls development.
  • Dynetics Inc. of Huntsville, Ala., which will demonstrate the use of modern manufacturing techniques to produce and test several primary components of the F-1 rocket engine originally developed for the Apollo Program, including an integrated powerpack, the primary rotating machinery of the engine. Additionally, the contract will demonstrate innovative fabrication techniques for metallic cryogenic tanks.
  • Northrop Grumman Corporation Aerospace Systems of Redondo Beach, Calif., which will demonstrate innovative design and manufacturing techniques for composite propellant tanks with low fixed costs and affordable production rates. Independent time and motion studies will compare demonstration affordability data to SLS advanced booster development, production and operations.

 

Additional contracts may be awarded following successful negotiation of other proposals previously received for this NASA Research Announcement, subject to funding availability.

Designed to be flexible for launching payloads and spacecraft, including NASA’s Orion spacecraft that will take humans beyond low Earth orbit, SLS will enable the agency to meet the Obama Administration’s goal of sending humans to an asteroid by 2025 and to Mars in the 2030s.

The first flight test of NASA’s SLS, an uncrewed mission to lunar orbit, which will feature a configuration for a 77-ton lift capacity, is scheduled for 2017. As SLS evolves, a two-stage launch vehicle configuration will provide a lift capability of 143 tons and include the improved, more powerful advanced booster.

These new contracts are funded under an NRA risk mitigation effort and acquisition. There will be a future competition for design, development, testing and evaluation for the SLS advanced booster.

This future competition is planned for 2015 and will be acquired through a separate solicitation. The 2015 competition will not be limited to awardees announced in this NRA. Successful offerors to this NRA are not guaranteed an award for any future advanced booster acquisition.

As NASA endeavors to send humans to a range of new destinations, agency initiatives are helping develop a U.S. commercial space transportation industry with the goal of achieving safe, reliable and cost-effective transportation to and from the International Space Station and low Earth orbit. Ongoing advances made by NASA’s commercial space partners are paving the way for regular contract flights of cargo to the space station and marking progress toward a launch of astronauts from U.S. soil in the next five years.

NASA’s Marshall Space Flight Center in Huntsville, Ala. manages the SLS Program for the agency. SLS will launch from NASA’s Kennedy Space Center in Florida.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 7, 2015

News: F-35 loses dogfight to fighter jet from 1980s – A new report alleges that an F-35A was defeated by the very aircraft it is meant to replace.   Business: South Korea selects Airbus for $1.33 billion tanker contract – European aerospace giant Airbus won a $1.33 billion deal June 30 to supply air refueling...
 
 
U.S. Chamber of Commerce photograph

Boeing, Embraer to collaborate on ecoDemonstrator technology tests

U.S. Chamber of Commerce photograph Frederico Curado, president & CEO of Embraer, and Marc Allen, president of Boeing International, at the Brazil-U.S. Business Summit in Washington, D.C. The event occurred during an offici...
 
 
Untitled-2

Tactical reconnaissance vehicle project eyes hoverbike for defense

The U.S. Army Research Laboratory, or ARL, has been exploring the tactical reconnaissance vehicle, or TRV, concept for nearly nine months and is evaluating the hoverbike technology as a way to get Soldiers away from ground thre...
 

 
Air Force photograph by SSgt. William Banton

Upgraded AWACS platform tested at Northern Edge

Air Force photograph by SSgt. William Banton Maintenance crew members prepare an E-3G Sentry (AWACS) for takeoff during exercise Northern Edge June 25, 2015. Roughly 6,000 airmen, soldiers, sailors, Marines and Coast Guardsmen ...
 
 
LM-Legion

Lockheed Martin’s Legion Pod™ takes to skies

Lockheed Martin photograph by Randy Crites Lockheed Martin’s Legion Pod recently completed its first flight test, successfully tracking multiple airborne targets while flying on an F-16 in Fort Worth, Texas. Legion Pod was in...
 
 
Air Force photograph by SSgt. Marleah Robertson

First Marine graduates Air Force’s F-35 intelligence course

Air Force photograph by SSgt. Marleah Robertson Marine Corps 1st Lt. Samuel Winsted, an F-35B Lightning II intelligence officer, provides a mock intelligence briefing to two instructors during the F-35 Intelligence Formal Train...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>