Space

October 3, 2012

NASA awards space launch system advanced booster contracts

NASA has awarded three contracts totaling $137.3 million to improve the affordability, reliability and performance of an advanced booster for the Space Launch System.

The awardees will develop engineering demonstrations and risk reduction concepts for a future version of the SLS, a heavy-lift rocket that will provide an entirely new capability for human exploration beyond low Earth orbit.

The initial 77-ton (70-metric-ton) SLS configuration will use two 5-segment solid rocket boosters similar to the boosters that helped power the space shuttle to orbit. The evolved 143-ton (130-metric-ton) SLS vehicle will require an advanced booster with more thrust than any existing U.S. liquid- or solid-fueled boosters. These new initiatives will demonstrate and examine advanced booster concepts and hardware demonstrations during a 30-month period.

The companies selected for SLS Advanced Booster contracts are:

 

  • ATK Launch Systems Inc. of Brigham City, Utah, which will demonstrate innovations for a solid-fueled booster. The contract addresses the key risks associated with low-cost solid propellant boosters, particularly in the areas of composite case design and development, propellant development and characterization, nozzle design and affordability enhancement, and avionics and controls development.
  • Dynetics Inc. of Huntsville, Ala., which will demonstrate the use of modern manufacturing techniques to produce and test several primary components of the F-1 rocket engine originally developed for the Apollo Program, including an integrated powerpack, the primary rotating machinery of the engine. Additionally, the contract will demonstrate innovative fabrication techniques for metallic cryogenic tanks.
  • Northrop Grumman Corporation Aerospace Systems of Redondo Beach, Calif., which will demonstrate innovative design and manufacturing techniques for composite propellant tanks with low fixed costs and affordable production rates. Independent time and motion studies will compare demonstration affordability data to SLS advanced booster development, production and operations.

 

Additional contracts may be awarded following successful negotiation of other proposals previously received for this NASA Research Announcement, subject to funding availability.

Designed to be flexible for launching payloads and spacecraft, including NASA’s Orion spacecraft that will take humans beyond low Earth orbit, SLS will enable the agency to meet the Obama Administration’s goal of sending humans to an asteroid by 2025 and to Mars in the 2030s.

The first flight test of NASA’s SLS, an uncrewed mission to lunar orbit, which will feature a configuration for a 77-ton lift capacity, is scheduled for 2017. As SLS evolves, a two-stage launch vehicle configuration will provide a lift capability of 143 tons and include the improved, more powerful advanced booster.

These new contracts are funded under an NRA risk mitigation effort and acquisition. There will be a future competition for design, development, testing and evaluation for the SLS advanced booster.

This future competition is planned for 2015 and will be acquired through a separate solicitation. The 2015 competition will not be limited to awardees announced in this NRA. Successful offerors to this NRA are not guaranteed an award for any future advanced booster acquisition.

As NASA endeavors to send humans to a range of new destinations, agency initiatives are helping develop a U.S. commercial space transportation industry with the goal of achieving safe, reliable and cost-effective transportation to and from the International Space Station and low Earth orbit. Ongoing advances made by NASA’s commercial space partners are paving the way for regular contract flights of cargo to the space station and marking progress toward a launch of astronauts from U.S. soil in the next five years.

NASA’s Marshall Space Flight Center in Huntsville, Ala. manages the SLS Program for the agency. SLS will launch from NASA’s Kennedy Space Center in Florida.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 30, 2014

News: Software to power F-35 running as much as 14 months late - Software needed to operate Lockheed Martin’s F-35 jet, the Pentagon’s costliest weapons system, may be as much as 14 months late for required flight testing, according to a Pentagon review.   Business: Lockheed will turn on JLTV production line In August; 6-D truck...
 
 

News Briefs July 30, 2014

U.S. military deaths in Afghanistan at 2,197 As of July 29, 2014, at least 2,197 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,819 military service members have died in Afghanistan as a result...
 
 
Lockheed Martin photograph by Tom Reynolds

F-35B successfully completes wet runway, crosswind testing

Lockheed Martin photograph by Tom Reynolds F-35B aircraft BF-4, piloted by Lockheed Martin Test Pilot Dan Levin, starts down the runway as part of wet runway and crosswind testing at Edwards AFB, Calif. In an important program ...
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 
NASA photograph by Carla Thomas

Katherine Lott awarded NASA Armstrong employee scholarship

NASA photograph by Carla Thomas Katherine Lott, the recipient of the 2014 NASA Armstrong Employee Exchange Council Joseph R. Vensel Memorial Scholarship, is congratulated by NASA Armstrong center director David McBride. Flankin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>