Defense

October 24, 2012

Army will do its job with less, secretary says

Tags:
C. Todd Lopez
Army News Service

With budget cuts already in place, and more cuts possible next year – the Army can expect there to be fewer resources around to accomplish a mission that will likely not shrink, said Secretary of the Army John M. McHugh, Oct. 22, 2012, during the 2012 Association of the United States Army Annual Meeting and Exposition in Washington, D.C.

With budget cuts already in place, and more cuts possible next year – the Army can expect fewer resources to accomplish a mission that will likely not shrink, said Secretary of the Army John M. McHugh.

Speaking before the opening session of the 2012 Association of the United States Army Annual Meeting and Exposition in Washington, D.C., McHugh said the nation’s economy, and how it affects the Army budget, is something that worries him. After more than 11 years of war, he said, “the Army is going to do its job with less.”

Budget cuts and force reductions were a long time coming, he said, and the Army has been aware of them for some time.
“We’ve seen this day coming for some time,” he said. “We’ve been given the opportunity and the time to get it right, to plan, to prioritize and adjust force structure, equipment and training; we are doing it.”

A critical component of the Army’s future is integration of Reserve forces. Since 2001, McHugh said, the Army has learned the importance of an operational reserve component in meeting mission requirements.

Continued training and readiness of the Reserve components is “paramount to the Army’s overall readiness and stability, and our nation’s security,” McHugh said. “We are going to make sure we do that, and we do it right.”

Part of the Army’s effort in that direction includes a McHugh-signed directive that establishes a “total force policy” for the Army. That directive says the Army will man, train, and equip active and reserve components “in an integrated operational force,” the purpose of which is to provide “predictable, recurring, and sustainable capabilities.”

McHugh said the directive outlines a number of measures to make integration of those forces seamless. Some of those measures include uniform processes and procedures for validating pre-deployment readiness; developing and implementing unified personnel management and pay systems; ensuring that equipping strategies promote procurement programs for a total force; and facilitating opportunities for soldiers to move between active and reserve-component assignments throughout their career.

At a press conference following the opening ceremony of this year’s AUSA conference, Chief of Staff of the Army Gen. Raymond T. Odierno said that as the Army heads into an uncertain future, it starts from a “position of strength,” as a result of veterans and Army leaders that have been in combat for 11 years now. And because the Army is an all-volunteer force, he said, he expects many of those same leaders to stay in the Army “and to pull the Army into the future.”

The Army will adapt readiness and training models to prepare units to better operate “in what we believe will be more and more complex environments that we are going to have to fight,” Odierno said.

To deal with those complex environments of the future, the general said he is now focused on an Army that can deploy at “several speeds,” at “several sizes,” and that can respond to “several contingencies.”

“The Army provides a depth and capability that no other service provides – tooth to tail – (from) combat, all the way down to every kind of logistics and combat service support that you can provide,” he said. “We’re the only service that does that completely, tooth to tail.”

McHugh said the Army’s “key to the future is our full-spectrum capability, and the capacity to go anywhere and do any mission.” The ability to do that, he said – the Army’s adaptability – means that it can serve as a hedge for the uncertainty of the future.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 30, 2014

News: Software to power F-35 running as much as 14 months late¬†- Software needed to operate Lockheed Martin’s F-35 jet, the Pentagon’s costliest weapons system, may be as much as 14 months late for required flight testing, according to a Pentagon review.   Business: Lockheed will turn on JLTV production line In August; 6-D truck...
 
 

News Briefs July 30, 2014

U.S. military deaths in Afghanistan at 2,197 As of July 29, 2014, at least 2,197 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,819 military service members have died in Afghanistan as a result...
 
 
Lockheed Martin photograph by Tom Reynolds

F-35B successfully completes wet runway, crosswind testing

Lockheed Martin photograph by Tom Reynolds F-35B aircraft BF-4, piloted by Lockheed Martin Test Pilot Dan Levin, starts down the runway as part of wet runway and crosswind testing at Edwards AFB, Calif. In an important program ...
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ‚...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 
NASA photograph by Carla Thomas

Katherine Lott awarded NASA Armstrong employee scholarship

NASA photograph by Carla Thomas Katherine Lott, the recipient of the 2014 NASA Armstrong Employee Exchange Council Joseph R. Vensel Memorial Scholarship, is congratulated by NASA Armstrong center director David McBride. Flankin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>