Business

October 31, 2012

Wyle wins $3 million Army helicopter support contract

EL SEGUNDO, Calif. – Wyle has been awarded a $3 million, three-year contract to provide qualification testing for the U.S. Army UH-60 Blackhawk helicopter, subsystems and components.

The testing will also apply to commercial variants of the Blackhawk used by the FBI, fire fighting agencies and other organizations.

These tests are designed to improve the reliability of installed modifications to the UH-60 helicopter, reduce total ownership costs and to decrease unplanned maintenance events.

The UH-60 program office has several modification programs with specific types of electronics and other systems that will be utilized, which are not present in the U.S. Army version of the helicopter.

Any new component that is considered for this helicopter must be tested to ensure compatibility and interoperability with existing equipment, and to ensure that the component can reliably perform in the environment that the UH-60 Helicopter will experience in the field.

This assurance is gained by performing detailed and specific sets of testing per either established military standards or standards that have been tailored to reflect the unique profiles of the UH-60.

Wyle will develop profiles for environmental, electromagnetic compliance, and power quality tests, generate specific test procedures, fabricate or modify test fixtures and monitoring devices to conduct rigorous tests which will be documented in test reports containing all data collected and reduced. The work is being completed by Wyle’s Test and Engineering East facility for the Utility Helicopter Program Office at Redstone Arsenal, both located in Huntsville, Ala.

Among the many component tests that Wyle will conduct are the following: Altitude, high and low temperature, rain, fungus, salt fog, crash hazard shock, acceleration, vibration, highly-accelerated life testing and numerous others.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 30, 2014

News: Software to power F-35 running as much as 14 months late¬†- Software needed to operate Lockheed Martin’s F-35 jet, the Pentagon’s costliest weapons system, may be as much as 14 months late for required flight testing, according to a Pentagon review.   Business: Lockheed will turn on JLTV production line In August; 6-D truck...
 
 

News Briefs July 30, 2014

U.S. military deaths in Afghanistan at 2,197 As of July 29, 2014, at least 2,197 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,819 military service members have died in Afghanistan as a result...
 
 
Lockheed Martin photograph by Tom Reynolds

F-35B successfully completes wet runway, crosswind testing

Lockheed Martin photograph by Tom Reynolds F-35B aircraft BF-4, piloted by Lockheed Martin Test Pilot Dan Levin, starts down the runway as part of wet runway and crosswind testing at Edwards AFB, Calif. In an important program ...
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ‚...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 
NASA photograph by Carla Thomas

Katherine Lott awarded NASA Armstrong employee scholarship

NASA photograph by Carla Thomas Katherine Lott, the recipient of the 2014 NASA Armstrong Employee Exchange Council Joseph R. Vensel Memorial Scholarship, is congratulated by NASA Armstrong center director David McBride. Flankin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>