Business

November 5, 2012

Boeing delivers fifth production P-8A Poseidon aircraft to U.S. Navy

Boeing photograph
Boeing on Nov. 2 delivered the fifth production P-8A Poseidon aircraft to the U.S. Navy. The P-8A is one of 24 low-rate initial production maritime patrol aircraft that Boeing is building for the Navy as part of contracts awarded in 2011 and 2012.

Boeing on Nov. 2 delivered the fifth production P-8A Poseidon aircraft to the U.S. Navy.

The P-8A is one of 24 low-rate initial production maritime patrol aircraft that Boeing is building for the Navy as part of contracts awarded in 2011 and 2012.

“This is our final P-8A delivery of the year; we’ll ramp up to 12 deliveries, including P-8I aircraft for India, in 2013,” said Chuck Dabundo, Boeing vice president and P-8 program manager. “Our in-line production approach, which draws on processes developed on the company’s commercial and military programs, has been key to our ability to increase production rates while reducing costs.”

“As we transition to the P-8A and prepare for Initial Operational Capability in 2013, the U.S. Navy is successfully flying the first production planes at Naval Air Station Jacksonville, Fla.,” said Capt. Aaron Rondeau, U.S. Navy P-8A Integrated Product Team lead.

The next three Poseidon aircraft are undergoing mission systems installation and checkout in Seattle, and two more are in final assembly in Renton, Wash. Boeing will deliver its sixth production P-8A to the Navy in early 2013.

The Navy plans to purchase 117 of the Boeing 737-based P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet.

As part of the LRIP contracts, Boeing is also providing aircrew and maintenance training for the Navy, in addition to logistics support, spares, support equipment and tools.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 24, 2015

News: More than $1 billion in U.S. emergency reconstruction aid goes missing in Afghanistan - A total of $1.3 billion that the Pentagon shipped to its force commanders in Afghanistan between 2004 and 2014 for the most critical reconstruction projects can’t be accounted for by the Defense Department, 60 percent of all such spending under an...
 
 

News Briefs April 24, 2015

German defense minister: widely used rifle has no future A widely used assault rifle has “no future” with the German military in its current form, Germany’s defense minister said April 22, escalating a dispute over the weapon’s alleged shortcomings. Ursula von der Leyen said last month that a study showed the G36 rifle has a...
 
 
Army photograph

Composites key to tougher, lighter armaments

Army photograph XM-360 test firing at Aberdeen Proving Ground, Md., in 2007, is shown. The Army is on the cusp of revolutionizing materials that go into armament construction, making for stronger, lighter and more durable weapo...
 

 

Northrop Grumman signs long-term agreement with Raytheon

Northrop Grumman has entered a long-term agreement with Raytheon to supply its LN-200 Inertial Measurement Unit for Raytheon optical targeting systems. The long-term agreement with Raytheon’s Space and Airborne Systems business extends through 2018. The LN-200 provides camera stabilization on optical targeting systems that conduct long-range surveillance and target acquisition for various...
 
 

NTTR supports first F-35B integration into USMC’s weapons school exercise

The Nevada Test and Training Range was part of history April 21, when four U.S. Marine Corps-assigned F-35B Lightning IIs participated in its first Marine Corps’ Final Exercise of the Weapons and Tactics Instructor course on the NTTR’s ranges. The Final Exercise, or FINEX, is the capstone event to the U.S. Marine Corps Marine Aviation...
 
 
AAR-Textron

AAR awarded new contract from Bell Helicopter Textron to support T64 engines

AAR announced April 22 that Bell Helicopter Textron Inc. awarded its Defense Systems & Logistics business unit a contract providing warehouse and logistics services in support of upgrading T64 engines for the Bell V-280 Val...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>