Space

November 19, 2012

Instrument delivered for NASA’s upcoming Mars mission

A remote sensing instrument that will peer into the ultraviolet to offer clues to how Mars might have lost its atmosphere has arrived at Lockheed Martin for integration into NASA’s Mars Atmosphere and Volatile EvolutioN (MAVEN) spacecraft.

“The Remote Sensing package team built a system that meets all technical requirements and delivered it on schedule and on budget,” said David Mitchell, MAVEN project manager from NASA Goddard Space Flight Center in Greenbelt, Md. “I look forward to the instrument’s next level of integration onto the spacecraft and ultimately the science it will provide.”

The Remote Sensing package consists of an Imaging UltraViolet Spectrograph and its control electronics box, the Remote Sensing Data Processing Unit. The Remote Sensing package was conceived, designed and built by the University of Colorado’s Laboratory for Atmospheric and Space Physics at Boulder, under contract to NASA Goddard.

The Imaging UltraViolet Spectrograph collects the light and spreads it out into spectra and records the spectra using imaging detectors. IUVS is the eyes of the instrument. The Remote Sensing Data Processing Unit is the main electronics box that controls IUVS, and communicates with the spacecraft. RSDPU receives and executes the commands sent to tell IUVS when and where to look. RSDPU is the brain of the instrument.

“The IUVS performs ‘remote sensing’, meaning we can study the planet and its atmosphere at a distance through the light it emits,” said Nick Schneider, IUVS lead scientist from CU/LASP. “Ultraviolet light is especially diagnostic of the state of the atmosphere, so our instrument provides the global context of the whole atmosphere for the local measurements made by the rest of the payload.”

The Remote Sensing package will be turned on for its initial checkout 21 days after launch. Later in the cruise phase of the mission from Earth to Mars, the package will be powered on twice more for state-of-health checks and in-flight calibration.

“With the delivery of this package, we are shifting from assembling the basic spacecraft to focusing on getting the science instruments onto the spacecraft,” said Bruce Jakosky, MAVEN principal investigator from CU/LASP. “This is a major step toward getting us to launch and then getting the science return from the mission.”

Launching late next year, MAVEN will be the first mission devoted to understanding the martian upper atmosphere. The goal of MAVEN is to determine the history of the loss of atmospheric gases to space through time, providing answers about Mars climate evolution. By measuring the current rate of escape to space and gathering enough information about the relevant processes, scientists will be able to infer how the planet’s atmosphere evolved in time.

The MAVEN spacecraft will carry two other instrument suites. The Particles and Fields Package, built by the University of California at Berkeley Space Science Laboratory with support from University of Colorado at Boulder’s Laboratory for Atmospheric and Space Physics and NASA Goddard, contains six instruments that will characterize the solar wind and the ionosphere of the planet. The Neutral Gas and Ion Mass Spectrometer, provided by NASA Goddard, will measure the composition and isotopes of neutral ions.

“Three of the big milestones in an instrument builder’s life are the day you get selected to fly on a mission, the day you deliver the instrument to the spacecraft to get ready for launch, and the day that it gets where it’s going and data starts flowing back from space,” said Mark Lankton, Remote Sensing package program manager from CU/LASP. “The Remote Sensing team is really happy to have gotten to the second milestone, and we can hardly wait to reach the third.”

MAVEN’s principal investigator is based at CU/LASP. The university will provide science operations, build instruments, and lead Education/Public Outreach. NASA Goddard manages the project and is building two of the science instruments for the mission. Lockheed Martin of Littleton, Colo., is building the spacecraft and is responsible for mission operations. The University of California at Berkeley Space Sciences Laboratory is building science instruments for the mission. NASA’s Jet Propulsion Laboratory, Pasadena, Calif., provides navigation support, the Deep Space Network, and the Electra telecommunications relay hardware and operations.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 25, 2014

News: VA reform bills stalled by partisan bickering - Plans for a comprehensive Veterans Affairs Department reform bill that appeared all but finished a month ago devolved into partisan bickering and funding fights July 24, casting doubt on the future of a deal.   Business: Airbus, Boeing, Lockheed announce bids on Danish fighter competition; Saab withdraws -...
 
 

News Briefs July 25, 2014

Marines investigate corporal who vanished in Iraq U.S. Marine Corp officers are launching a formal investigation into whether a Lebanese-American Marine deserted his unit in Iraq or later after returning to the United States. A spokesman for the 2nd Marine Expeditionary Force at Camp Lejeune said July 24 that Cpl. Wassef Ali Hassoun is being...
 
 
Air Force photograph by A1C Erin OíShea

U.S. Forces display military might at Farnborough

Air Force photograph by A1C Erin O’Shea Capt. Tom Meyers discusses the F-15E Strike Eagle’s capabilities with spectators July 17, 2014, at the Farnborough International Airshow in England. Public access was granted ...
 

 
raptors4

Raptors, Falcons fuel up in desert skies

Three U.S. Air Force F-22 Raptors assigned to the 325th Fighter Wing, Tyndall Air Force Base, Fla., fly alongside a KC-135 Stratotanker assigned to the 93rd Air Refueling Squadron, Fairchild AFB, Wash., during Red Flag 14-3, Ju...
 
 
lm-kmax

Lockheed Martin’s unmanned cargo helicopter team returns from deployment

After lifting more than 4.5 million pounds of cargo and conducting thousands of delivery missions for the U.S. Marine Corps, the Lockheed Martin and Kaman Aerospace Corporation K-MAX cargo unmanned aircraft system has returned ...
 
 
Air Force photograph by A1C Thomas Spangler

Sun sets on Red Flag 14-3

Air Force photograph by A1C Thomas Spangler The sun sets behind a row of F-16 Fighting Falcons during Red Flag 14-3, July 16, 2014, at Nellis Air Force Base, Nev. Red Flag provides a series of intense air-to-air combat scenario...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>