Space

November 26, 2012

Boeing partner Orbital completes MEXSAT Bicentenario satellite

Boeing and partner Orbital Sciences Corporation a step closer to helping the government of Mexico provide advanced communications services throughout the country and surrounding maritime area with the completion of the MEXSAT Bicentenario communications satellite.

Orbital designed, manufactured and tested MEXSAT Bicentenario before shipping the completed spacecraft to Kourou, French Guiana, where it is scheduled to be launched aboard an Ariane 5 rocket Dec. 19.

Under a contract with Boeing, Orbital completed the work on MEXSAT Bicentenario as part of a three-satellite order for the Federal Government of Mexico. As prime contractor for MEXSAT, Boeing is providing two larger satellites in the series that are scheduled for launch in 2013 and 2014. The Secretaria de Comunicaciones y Transportes of Mexico will take over day-to-day operations of the satellites as they are launched and undergo on-orbit testing, verification and positioning.

“MEXSAT Bicentenario is based on OrbitalĂ­s flight-proven GEOStar-2 platform, which enabled us to deliver the spacecraft on a short delivery schedule,” said Christopher Richmond, Orbital senior vice president of Communications Satellite Programs. “We are looking forward to a successful launch and a smooth on-orbit checkout sequence.”

Boeing Space & Intelligence Systems is the overall integrator of the MEXSAT communications network, which will comprise three satellites, two ground telemetry and control sites, associated network operations systems, and reference user terminals. The second and third MEXSAT satellites will be Boeing 702HP geomobile satellites that will each supply 14 kilowatts of power and carry a 22-meter L-band reflector for mobile satellite services.




All of this week's top headlines to your email every Friday.


 
 

 
NASA/JPL photograph

NASA’s Dawn spacecraft captures best-ever view of dwarf planet

Zoomed out – PIA19173 Ceres appears sharper than ever at 43 pixels across, a higher resolution than images of Ceres taken by the NASA’s Hubble Space Telescope in 2003 and 2004. NASA’s Dawn spacecraft has retur...
 
 
ATK

ATK completes installation of world’s largest solid rocket motor for ground test

ATK The first qualification motor for NASA’s Space Launch Systems booster is installed in ATK’s test stand in Utah – ready for a March 11 static-fire test. NASA and ATK have completed installing the first Spac...
 
 
ULA photograph

Third Lockheed Martin-built MUOS satellite launched, responding to commands

ULA photograph The U.S. Air Force’s 45th Space Wing successfully launched the third Mobile User Objective System satellite, built by Lockheed Martin, for the U.S. Navy at 8:04 p.m. Jan. 20, 2015, from Launch Complex 41 at...
 

 
ULA photograph

ULA successfully launches Navy’s Mobile User Objective System-3

ULA photograph The U.S. Air Force’s 45th Space Wing successfully launched the third Mobile User Objective System (MUOS) satellite, built by Lockheed Martin, for the U.S. Navy at 8:04 p.m. Jan. 20, 2015, from Launch Comple...
 
 

Aerojet Rocketdyne Propulsion supports launch, flight of third MUOS satellite

Aerojet Rocketdyne played a critical role in successfully placing the third of five planned Mobile User Objective System (MUOS-3) satellites, designed and built by Lockheed Martin, into orbit for the U.S. Navy. The mission was launched from Cape Canaveral Air Force Station in Florida aboard a United Launch Alliance Atlas V rocket, with five Aerojet...
 
 
LM-MUOS-satellite

U.S. Navy poised to Launch Lockheed Martin-built MUOS-3 satellite

The U.S. Navy and Lockheed Martin are ready to launch the third Mobile User Objective System satellite, MUOS-3, from Cape Canaveral Air Force Station, Fla., Jan. 20 aboard a United Launch Alliance Atlas V rocket. The launch win...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>