Space

November 28, 2012

Researchers test novel power system for space travel


A team of researchers, including engineers from Los Alamos National Laboratory, N.M., has demonstrated a new concept for a reliable nuclear reactor that could be used on space flights.

The research team recently demonstrated the first use of a heat pipe to cool a small nuclear reactor and power a Stirling engine at the Nevada National Security Site’s Device Assembly Facility near Las Vegas. The Demonstration Using Flattop Fissions (DUFF) experiment produced 24 watts of electricity. A team of engineers from Los Alamos, the NASA Glenn Research Center and National Security Technologies LLC conducted the experiment.

Heat pipe technology was invented at Los Alamos in 1963. A heat pipe is a sealed tube with an internal fluid that can efficiently transfer heat produced by a reactor with no moving parts. A Stirling engine is a relatively simple closed-loop engine that converts heat energy into electrical power using a pressurized gas to move a piston. Using the two devices in tandem allowed for creation of a simple, reliable electric power supply that can be adapted for space applications.

Researchers configured DUFF on an existing experiment, known as Flattop, to allow for a water-based heat pipe to extract heat from uranium. Heat from the fission reaction was transferred to a pair of free-piston Stirling engines manufactured by Sunpower Inc., based in Athens Ohio. Engineers from NASA Glenn designed and built the heat pipe and Stirling assembly and operated the engines during the experiment. Los Alamos nuclear engineers operated the Flattop assembly under authorization from the National Nuclear Security Administration (NNSA).

DUFF is the first demonstration of a space nuclear reactor system to produce electricity in the United States since 1965, and the experiment confirms basic nuclear reactor physics and heat transfer for a simple, reliable space power system.

“The nuclear characteristics and thermal power level of the experiment are remarkably similar to our space reactor flight concept,” said Los Alamos engineer David Poston. “The biggest difference between DUFF and a possible flight system is that the Stirling input temperature would need to be hotter to attain the required efficiency and power output needed for space missions.”

“The heat pipe and Stirling engine used in this test are meant to represent one module that could be used in a space system,” said Marc Gibson of NASA Glenn. “A flight system might use several modules to produce approximately one kilowatt of electricity.”

Current space missions typically use power supplies that generate about the same amount of electricity as one or two household light bulbs. The availability of more power could potentially boost the speed with which mission data is transmitted back to Earth, or increase the number of instruments that could be operated at the same time aboard a spacecraft.

“A small, simple, lightweight fission power system could lead to a new and enhanced capability for space science and exploration,” said Los Alamos project lead Patrick McClure. “We hope that this proof of concept will soon move us from the old-frontier of Nevada to the new-frontier of outer space.”

Los Alamos research on the project was made possible through Los Alamos’s Laboratory-Directed Research and Development Program, which is funded by a small percentage of the Laboratory’s overall budget to invest in new or cutting-edge research. NASA Glenn and NSTec also used internal support to fund their contributions to the experiment.

“Perhaps one of the more important aspects of this experiment is that it was taken from concept to completion in 6 months for less than a million dollars,” said Los Alamos engineer David Dixon. “We wanted to show that with a tightly-knit and focused team, it is possible to successfully perform practical reactor testing.”




All of this week's top headlines to your email every Friday.


 
 

 

Headlines March 27, 2015

News General Dynamics withdraws as T-100 prime contractor General Dynamics Information Systems and Technology has withdrawn itself as the prime contractor on the T-100, the offering for the T-X trainer replacement program based on the Alenia Aermacchi M-346 design.   Business SpaceX’s fight with U.S. Air Force called a clash of perceptions Billionaire Elon Musk’s...
 
 

News Briefs March 27, 2015

Contractor extradited from Iraq pleads guilty in bribes case A man extradited from Iraq in a military contract bribery case has pleaded guilty to three charges in an agreement with federal prosecutors. U.S. District Judge Thomas Rose has scheduled sentencing for July 1 for Metin Atilan. His attorney, Nick Gounaris, says the two sides agreed...
 
 

Ninth Boeing GPS IIF reaches orbit, sends first signals

Boeing Global Positioning System (GPS) IIF satellites are steadily replenishing the orbiting constellation, continuing to improve reliability and accuracy for users around the world. The ninth GPS IIF reached orbit about three hours, 20 minutes after launching today aboard a United Launch Alliance (ULA) Delta IV rocket from Cape Canaveral Air Force Station, Fla., and...
 

 

F-35 Lightning II costs drop, report shows

A recent account of F-35 Lightning II aircraft program costs shows decreases, the Air Force’s F-35 program executive officer told reporters in a media roundtable March 24, 2015. Lt. Gen. Christopher C. Bogdan, citing this year’s selected acquisition report on the aircraft, called the roundtable to clarify cost and performance facts. He also acknowledged the...
 
 
NG-growler2

Northrop Grumman delivers center/aft ‘shipset’ for first international EA-18G Growler

Northrop Grumman photograph Northrop Grumman mechanics perform final quality inspections on the center/aft fuselage shipset produced by the company for the first Australian EA-18G Growler. The subassembly will be delivered to B...
 
 
Navy photograph by Monica McCoy

Navy conducts production acceptance test of Tomahawk missile

Navy photograph by Monica McCoy Members of the Explosive Ordnance Disposal Technology Division team at Naval Surface Warfare Center, Indian Head prepare a Tomahawk missile for a functional ground test at the Large Motor Test Fa...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>