Defense

December 3, 2012

F-35C Lightning II hits weapons testing milestone CF-2 completes initial pit drop testing

Tags:
Victor Chen
NAS Patuxent River, Md.


The F-35 integrated test force aboard Naval Air Station Patuxent River completed a weapons ejection milestone for the Lightning II carrier variant on Nov. 28.

CF-2, the second F-35C test aircraft, ejected a 2,000-pound inert GBU-31 Joint Direct Attack Munition and a 500-pound GBU-12 Paveway II Laser Guided Bomb from an internal weapons bay into a foam-covered concrete pit, completing the series of first-ever ground weapons ejections for the F-35C.

“The integrated government and industry team here, particularly the weapons team, have had a terrific 2012,” said Capt. Erik Etz, director of test and evaluation for F-35 naval variants. “We have a lot more of the envelope to expand on the [F-35C], but we have a lot of momentum, and we’re well equipped for the in-flight weapons separation work ahead of us.”

In addition to the GBU-31 and GBU-12, the CF-2 team successfully ejected the AIM-120 Advanced Medium-Range Air-to-Air Missile. Overall, the team completed eleven weapon releases, split between the left and right weapon bays, earlier than planned.

Weapons pit drop testing collects data to measure stresses on the airframe and any neighboring munitions, ensures proper function of weapon and suspension equipment, and validates the separation models for the munitions’ ejection characteristics, including trajectories and velocities.

Combined with airborne test missions carrying inert weapons to evaluate environmental and handling conditions, pit drop testing is precursor to airborne separations.

In 2012, the F-35 test team aboard NAS Patuxent River completed the first airborne weapons separation for any of the three variants and at Edwards Air Force Base, Calif., the F-35A test team completed successful testing with a GBU-31 JDAM and the AIM-120 AMRAAM.

The F-35C carrier variant of the Lightning II is distinct from the F-35A and F-35B variants with its larger wing surfaces and reinforced landing gear; features used to withstand catapult launches and deck landing impacts associated with the demanding aircraft carrier environment. The F-35C is undergoing flight test and evaluation at NAS Patuxent River prior to fleet delivery.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 25, 2014

News: U.S. sends second carrier to Asia amid tensions with China - The Navy is sending a second aircraft carrier strike group to the Asia Pacific region amid new tensions with China over a dangerous aerial encounter between a Chinese interceptor and a Navy P-8 surveillance aircraft. SpaceX rocket explodes during test flight - A SpaceX rocket...
 
 

News Briefs August 25, 2014

China says U.S. plane intercept was professional China’s Defense Ministry has rejected U.S. accusations that a Chinese fighter jet conducted a dangerous intercept of a U.S. Navy surveillance aircraft off the coast of China in international airspace. The ministry issued a statement Aug. 23 attributed to spokesman Yang Yujun calling the U.S. accusations groundless. It...
 
 

Ukraine plans $3 billion boost to defense spending

KIEV, Ukraine – Ukraine’s president announced plans Aug. 24 to boost his country’s defense spending by an estimated 50 percent as government forces seek to overpower pro-Russian separatists in the east. President Petro Poroshenko pledged to spend an extra 40 billion hryvnia ($3 billion) by 2017 during a speech marking Ukraine’s independence from the Soviet...
 

 

NASA awards research facilities, engineering support services contract

NASA has awarded a contract for research facilities and engineering support services to InuTeq, LLC of Greenbelt, Maryland, in support of the Mission Information and Test Systems Directorate at NASA’s Armstrong Flight Research Center, Edwards, Calif. This cost-plus-award-fee contract covers a one-year base period beginning Nov. 1, 2014 and four one-year options, and is valued...
 
 

Navy Awards General Dynamics contract for LCS planning yard services

The U.S. Navy awarded General Dynamics Bath Iron Works a $100 million contract to provide planning yard services for the Littoral Combat Ship program. General Dynamics Bath Iron Works is a business unit of General Dynamics. Bath Iron Works, as the LCS Planning Yard, will provide maintenance and modernization support for all Navy LCS 1...
 
 
boeing-boc

Boeing, BOC Aviation announce order for 82 airplanes

  Boeing announced Aug. 25 an order by BOC Aviation for 50 737 MAX 8s, 30 Next-Generation 737-800s and two 777-300ERs (Extended Range). The order, valued at $8.8 billion at list prices, is the largest in BOC Aviation’...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>