Space

December 14, 2012

Beating heart of J-2X engine finishes year of successful NASA tests


J-2X Powerpack Completes Testing

NASA Dec. 13 took another step toward human exploration of new destinations in the solar system. At the agency’s Stennis Space Center in Mississippi, engineers conducted the final test-firing of the J-2X powerpack assembly, an important component of America’s next heavy-lift rocket.

The J-2X engine is the first human-rated liquid oxygen and liquid hydrogen engine developed in the United States in decades. Designed and built by NASA and industry partner Pratt & Whitney Rocketdyne of Canoga Park, Calif., the engine will power the upper stage of NASA’s 143-ton (130-metric-ton) Space Launch System rocket. The powerpack is a system of components on top of the engine that feeds propellants to the bell nozzle of the engine to produce thrust.

“The determination and focus by teams at NASA’s Marshall Space Flight Center and Stennis on designing and perfecting the J-2X engine helps show the great strides of progress made on the overall program,” said SLS Program Manager Todd May. “We are inspired to stay the course and pursue our goal of exploring deep space and traveling farther than ever before.”

The powerpack was worked out separately from the engine to more thoroughly test its limits. It also can be operated under a wider range of conditions. The tests provide a trove of data to compare with analytical predictions of the performance of several parts in the turbopump and flexible ducts.

“These tests at Stennis are similar to doctor-ordered treadmill tests for a person’s heart,” said Tom Byrd, J-2X engine lead in the SLS Liquid Engines Office at Marshall in Huntsville, Ala. “The engineers who designed and analyze the turbopumps inside the powerpack are like our doctors, using sensors installed in the assembly to monitor the run over a wide range of stressful conditions. We ran the assembly tests this year for far longer than the engine will run during a mission to space, and acquired a lot of valuable information that will help us improve the development of the J-2X engine.”

The powerpack assembly burned millions of pounds of propellants during a series of 13 tests totaling more than an hour and a half in 2012. The testing team set several records for hot-firing duration at Stennis test stands during the summer. NASA engineers will remove the assembly from the test stand to focus on tests of the fully integrated engine. Installation on a test stand at Stennis will begin in 2013.

The SLS will launch NASA’s Orion spacecraft and other payloads from the agency’s Kennedy Space Center in Florida, providing an entirely new capability for human exploration beyond low Earth orbit. The program is managed at Marshall.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 14, 2014

Business: U.S. Navy looks to leverage submarine work to keep costs down - The U.S. Navy hopes to save money and time by leveraging industry investments as it replaces its Ohio-class nuclear-armed submarines with the Virginia-class attack submarines now built by General Dynamics Corp and Huntington Ingalls Industries Inc.  Study raises red flags on California aerospace...
 
 

News Briefs April 14, 2014

U.S. Navy destroyer Zumwalt christened in Maine The U.S. Navy has christened the first ship of its newest class of destroyers, a 610-foot (186-meter)-long warship with advanced technologies and a stealthy design that will reduce its visibility on enemy radars. The warship bears the name of the late Adm. Elmo ìBudî Zumwalt, who became the...
 
 
Navy photograph by Seamn Edward Guttierrez III

Russian aircraft flies near U.S. Navy ship in Black Sea

Navy photograph by Seamn Edward Guttierrez III Sailors man the rails as the Arleigh Burke-class guided-missile destroyer USS Donald Cook arrives at Naval Station Rota, Spain, Feb. 11, 2014. Donald Cook is the first of four Arle...
 

 

45th Space Wing launches NRO Satellite on board Atlas V

The 45th Space Wing successfully launched a United Launch Alliance Atlas V rocket from Space Launch Complex 41, Vandenberg Air Force Base, Calif., at 1:45 p.m. April 10 carrying a classified national security payload. The payload was designed and built by the National Reconnaissance Office. “I am proud of the persistence and focus of the...
 
 

U.S. Air Force selects Cubic for Moroccan P5 air combat training system

Cubic Defense Systems, a subsidiary of Cubic Corporation announced April 11 it has been awarded a contract valued at more than $5 million from the U.S. Air Force to supply its P5 Combat Training System to the Moroccan Air Force. Morocco will join the United States Air Force, Navy, and Marine Corps, along with a...
 
 
Lockheed Martin photograph

NASA’s Orion Spacecraft powers through first integrated system testing

Lockheed Martin photograph Engineers in the Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, perform avionics testing on the Orion spacecraft being prepared for its first trip to space later this ye...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>