Space

December 14, 2012

Beating heart of J-2X engine finishes year of successful NASA tests


J-2X Powerpack Completes Testing

NASA Dec. 13 took another step toward human exploration of new destinations in the solar system. At the agency’s Stennis Space Center in Mississippi, engineers conducted the final test-firing of the J-2X powerpack assembly, an important component of America’s next heavy-lift rocket.

The J-2X engine is the first human-rated liquid oxygen and liquid hydrogen engine developed in the United States in decades. Designed and built by NASA and industry partner Pratt & Whitney Rocketdyne of Canoga Park, Calif., the engine will power the upper stage of NASA’s 143-ton (130-metric-ton) Space Launch System rocket. The powerpack is a system of components on top of the engine that feeds propellants to the bell nozzle of the engine to produce thrust.

“The determination and focus by teams at NASA’s Marshall Space Flight Center and Stennis on designing and perfecting the J-2X engine helps show the great strides of progress made on the overall program,” said SLS Program Manager Todd May. “We are inspired to stay the course and pursue our goal of exploring deep space and traveling farther than ever before.”

The powerpack was worked out separately from the engine to more thoroughly test its limits. It also can be operated under a wider range of conditions. The tests provide a trove of data to compare with analytical predictions of the performance of several parts in the turbopump and flexible ducts.

“These tests at Stennis are similar to doctor-ordered treadmill tests for a person’s heart,” said Tom Byrd, J-2X engine lead in the SLS Liquid Engines Office at Marshall in Huntsville, Ala. “The engineers who designed and analyze the turbopumps inside the powerpack are like our doctors, using sensors installed in the assembly to monitor the run over a wide range of stressful conditions. We ran the assembly tests this year for far longer than the engine will run during a mission to space, and acquired a lot of valuable information that will help us improve the development of the J-2X engine.”

The powerpack assembly burned millions of pounds of propellants during a series of 13 tests totaling more than an hour and a half in 2012. The testing team set several records for hot-firing duration at Stennis test stands during the summer. NASA engineers will remove the assembly from the test stand to focus on tests of the fully integrated engine. Installation on a test stand at Stennis will begin in 2013.

The SLS will launch NASA’s Orion spacecraft and other payloads from the agency’s Kennedy Space Center in Florida, providing an entirely new capability for human exploration beyond low Earth orbit. The program is managed at Marshall.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines September 15, 2014

News: Navy identifies pilot presumed dead in crash - A Navy fighter pilot presumed dead after two fighter jets crashed in the far western Pacific Ocean has been identified.   Business: Boeing eyes 737-700 solution for new JSTARS - Boeing is officially planning a variant of its 737-700 commercial jetliner as a competitor for the Air Force’s...
 
 

News Briefs September 15, 2014

Australia contributing planes for anti-IS campaign Australia is preparing to contribute 600 troops and up to 10 military aircraft to the increasingly aggressive campaign against the Islamic State extremists in Syria and Iraq, Prime Minister Tony Abbott said Sept. 14. Abbott said Australia was responding to a formal request from the United States for specific...
 
 
Courtesy graphic

Lockheed Martin conducts flight tests of aircraft laser turret for DARPA

AFRL photograph The Aero-adaptive Aero-optic Beam Control turret that Lockheed Martin is developing for the Defense Advanced Research Projects Agency and the Air Force Research Laboratory has completed initial flight testing. T...
 

 

Lockheed Martin advances live, virtual, constructive training in flight test

https://www.youtube.com/watch?feature=player_embedded&v=jvXmOW8L3mU Lockheed Martin successfully tested a new solution for integrated live, virtual and constructive training during a flight demonstration at the company’s Aeronautics facility in Fort Worth, Texas. During the flight test, a pilot flying in a live F-16 engaged in a synthetic training exercise with a pilot flying as wing...
 
 
Image courtesy of NASA/JPL-Caltech/Univ. of Arizona

NASA’s Mars Curiosity rover arrives at Martian mountain

NASA’s Mars Curiosity rover has reached the Red Planet’s Mount Sharp, a Mount-Rainier-size mountain at the center of the vast Gale Crater and the rover mission’s long-term prime destination. “Curiosity n...
 
 

Raytheon begins full rate production on TALON Laser Guided Rockets

Under a $117 million contract awarded to Raytheon, Raytheon Missile Systems has begun production of the TALON Laser Guided Rocket. In 2013, the Armed Forces General Headquarters of the United Arab Emirates awarded Tawazun a contract to procure the TALON Laser Guided Rocket. “Full rate production of the TALON LGR is a significant milestone for...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>