Tech

December 17, 2012

Deployable radio frequency data backbone to match fiber optic capacity


Fiber optic cables provide the core backbone for military and civilian networks, enabling Internet, phone, video and other data to move at super-high speeds with virtually no degradation over long distances.

In deployed environments, where a fiber optic backbone doesnít exist, other communications modes are used resulting in reduced data-rate capacity for the warfighter.

DARPAís 100 Gb/s RF Backbone (100G) intends to develop a fiber-optic-equivalent communications backbone that can be deployed worldwide. The goal is to create a 100 Gb/s data link that achieves a range greater than 200 kilometers between airborne assets and a range greater than 100 kilometers between an airborne asset (at 60,000 feet) and the ground. The 100G program goal is to meet the weight and power metrics of the Common Data Link (CDL) deployed by Forces today for high-capacity data streaming from platforms.

A major challenge to providing 100 Gb/s from an airborne asset to the ground is cloud cover. Free-space optical links wonít propagate through the cloud layer, which means RF is the only option. The system will be designed to provide all-weather capability enabling tactically relevant data throughput and link ranges through clouds, fog or rain. Technical advances in modulation of millimeter-wave frequencies open the door to achieving 100Gís goals.

ìProviding fiber-optic-equivalent capacity on a radio frequency carrier will require spectrally efficient use of available RF spectrum,î said Dick Ridgway, DARPA program manager. ì100G plans to demonstrate how high-order modulation and spatial multiplexing can be synergistically combined to achieve 100 Gigabits per second with the size, weight and power needed for a deployable system. We believe that to achieve the programís goals requires the convergence of telecommunications system providers and the defense communications tech base.

DARPA will host a proposersí day Jan. 9, 2013, in Arlington, Va. For details, visit: http://go.usa.gov/gVnB.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 18, 2014

News: U.S. mission in Iraq could expand, Pentagon official says - The mission for U.S. troops in Iraq to help Kurdish and Iraqi security forces in their fight against Islamic militants remains limited for now, but may expand after Iraqi leaders form a new government, a Pentagon spokesman said Aug. 19.   Business: Fuel deals top...
 
 

News Briefs August 20, 2014

Trials complete on fourth Coast Guard cutter Ingalls Shipbuilding in Pascagoula, Miss., has completed acceptance sea trials for the company’s fourth U.S. Coast Guard national security cutter, Hamilton. Jim French, Ingalls’ NSC program manager, tells The Mississippi Press) the Hamilton is scheduled to be delivered next month and commissioned on Dec. 6 in Charleston, South...
 
 
Army photograph by Sgt. Thomas Duval

Air Force, Army Aviation come together to complete vital mission in Egypt

Army photograph by Sgt. Thomas Duval Soldiers and airmen load a UH-60 Black Hawk into an Air Force C17 Globemaster III Aug. 19, 2104, at an old Israeli airstrip in the Sinai Peninsula of Egypt. The airstrip is now used by the M...
 

 
Air Force photograph by TSgt. Terri Praden

Joint effort validates ability to move Stryker vehicles via air

Air Force photograph by TSgt. Terri Praden An Army Stryker combat vehicle is guided into a C-17 Globemaster III during a 25th Infantry Division training exercise Aug. 13, 2014, at Joint Base Pearl Harbor-Hickam, Hawaii. The Str...
 
 
NASA image

Ozone-depleting compound persists, NASA research shows

NASA image Satellites observed the largest ozone hole over Antarctica in 2006. Purple and blue represent areas of low ozone concentrations in the atmosphere; yellow and red are areas of higher concentrations. NASA research show...
 
 

F-16V completes major capability milestone

The newest configuration of the F-16 Fighting Falcon, the F-16V, has reached a major capability milestone with the integration of a new Active Electronically Scanned Array radar. Completing this milestone on schedule demonstrates our ability to meet program commitments, said Roderick McLean, vice president and general manager of the F-16/F-22 Integrated Fighter Group at Lockheed...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>