Space

December 19, 2012

NASA’s Grail lunar impact site named for astronaut Sally Ride

NASA has named the site where twin agency spacecraft impacted the moon Dec. 17 in honor of the late astronaut, Sally K. Ride, who was America’s first woman in space and a member of the probes’ mission team.

Last Friday, Ebb and Flow, the two spacecraft comprising NASA’s Gravity Recovery and Interior Laboratory (GRAIL) mission, were commanded to descend into a lower orbit that would result in an

impact Monday on a mountain near the moon’s north pole. The formation-flying duo hit the lunar surface as planned at 2:28:51 p.m., PST, and 2:29:21 p.m., PST, at a speed of 3,760 mph. The location of the Sally K. Ride Impact Site is on the southern face of an approximately 1.5 mile-tall mountain near a crater named Goldschmidt.

“Sally was all about getting the job done, whether it be in exploring space, inspiring the next generation, or helping make the GRAIL mission the resounding success it is today,” said GRAIL principal investigator Maria Zuber of the Massachusetts Institute of Technology in Cambridge. “As we complete our lunar mission, we are proud we can honor Sally Ride’s contributions by naming this corner of the moon after her.”

The impact marked a successful end to the GRAIL mission, which was NASA’s first planetary mission to carry cameras fully dedicated to education and public outreach. Ride, who died in July after a 17-month battle with pancreatic cancer, led GRAIL’s MoonKAM (Moon Knowledge Acquired by Middle School Students) Program through her company, Sally Ride Science, in San Diego.

Along with its primary science instrument, each spacecraft carried a MoonKAM camera that took more than 115,000 total images of the lunar surface. Imaging targets were proposed by middle school students from across the country and the resulting images returned for them to study. The names of the spacecraft were selected by Ride and the mission team from student submissions in a nationwide contest.

“Sally Ride worked tirelessly throughout her life to remind all of us, especially girls, to keep questioning and learning,” said Sen. Barbara Mikulski of Maryland. “Today her passion for making students

part of NASA’s science is honored by naming the impact site for her.”

Fifty minutes prior to impact, the spacecraft fired their engines until the propellant was depleted. The maneuver was designed to determine precisely the amount of fuel remaining in the tanks. This will help NASA engineers validate computer models to improve predictions of fuel needs for future missions.

“Ebb fired its engines for 4 minutes, 3 seconds and Flow fired its for 5 minutes, 7 seconds,” said GRAIL project manager David Lehman of NASA’s Jet Propulsion Laboratory (JPL) in Pasadena, Calif. “It was one final important set of data from a mission that was filled with great science and engineering data.”

The mission team deduced that much of the material aboard each spacecraft was broken up in the energy released during the impacts. Most of what remained probably is buried in shallow craters. The craters’ size may be determined when NASA’s Lunar Reconnaissance Orbiter returns images of the area in several weeks.

Launched in September 2011, Ebb and Flow had been orbiting the moon since Jan. 1, 2012. The probes intentionally were sent into the lunar surface because they did not have sufficient altitude or fuel to

continue science operations. Their successful prime and extended science missions generated the highest resolution gravity field map of any celestial body. The map will provide a better understanding of how Earth and other rocky planets in the solar system formed and evolved.

“We will miss our lunar twins, but the scientists tell me it will take years to analyze all the great data they got, and that is why we came to the moon in the first place,” Lehman said. “So long, Ebb and Flow, and we thank you.”

JPL manages the GRAIL mission for NASA’s Science Mission Directorate in Washington. GRAIL is part of the Discovery Program managed at NASA’s Marshall Space Flight Center in Huntsville, Ala. Lockheed Martin Space Systems in Denver built the spacecraft.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines November 17, 2014

News: Fight over A-10 re-opens Hill, Air Force divide - After a relatively quiet summer, the battle for the future of the A-10 Warthog exploded in the last two weeks, reopening deep fissures between Congress and the Air Force that seem to show the two sides at a total stalemate. Chances for sequester relief fade as...
 
 

News Briefs Nov, 17, 2014

Second stealthy destroyer starting to take shape The second of three stealthy destroyers under construction in Maine is starting to take shape. The Navy says it has completed the hoisting of the 1,000-ton composite deckhouse onto the 610-foot hull of the future USS Michael Monsoor. It took four cranes to complete the job Nov. 14....
 
 
NASA photograph by Jim Yungel

NASA DC-8 continues west Antarctic ice study

NASA photograph by Jim Yungel The Thurston Island calving front off of western Antarctica as seen from the window of NASA’s DC-8 flying observatory Nov. 5, 2014. NASA’s DC-8 flying laboratory has two weeks of suppor...
 

 
NASA photograph by Emmett Given

NASA opens registration for 2015 Exploration Rover Challenge

NASA photograph by Emmett Given Pedaling across a simulated alien landscape of rock, craters and shifting sand is one of the nearly 90 teams of high school, college and university students from across the United States and arou...
 
 
Lockheed Martin photograph

Lockheed Martin begins final assembly of NASA’s next Mars lander

Lockheed Martin photograph Technicians in a Lockheed Martin clean room prepare NASA’s InSight Mars lander for propulsion proof and leak testing on Oct. 31, 2014. Following the test, the lander was moved to another clean room ...
 
 
Air Force photograph by Isaac Cruz

‘Batman’ fix to sustain C-5s for decades, saving millions

Robins Air Force Base, Ga., has hit another milestone by being the first to complete a new major structural repair on a C-5M which will bring in millions of dollars in revenue and sustain the Air Force’s fleet for decades...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>