Space

December 19, 2012

NASA’s Grail lunar impact site named for astronaut Sally Ride

NASA has named the site where twin agency spacecraft impacted the moon Dec. 17 in honor of the late astronaut, Sally K. Ride, who was America’s first woman in space and a member of the probes’ mission team.

Last Friday, Ebb and Flow, the two spacecraft comprising NASA’s Gravity Recovery and Interior Laboratory (GRAIL) mission, were commanded to descend into a lower orbit that would result in an

impact Monday on a mountain near the moon’s north pole. The formation-flying duo hit the lunar surface as planned at 2:28:51 p.m., PST, and 2:29:21 p.m., PST, at a speed of 3,760 mph. The location of the Sally K. Ride Impact Site is on the southern face of an approximately 1.5 mile-tall mountain near a crater named Goldschmidt.

“Sally was all about getting the job done, whether it be in exploring space, inspiring the next generation, or helping make the GRAIL mission the resounding success it is today,” said GRAIL principal investigator Maria Zuber of the Massachusetts Institute of Technology in Cambridge. “As we complete our lunar mission, we are proud we can honor Sally Ride’s contributions by naming this corner of the moon after her.”

The impact marked a successful end to the GRAIL mission, which was NASA’s first planetary mission to carry cameras fully dedicated to education and public outreach. Ride, who died in July after a 17-month battle with pancreatic cancer, led GRAIL’s MoonKAM (Moon Knowledge Acquired by Middle School Students) Program through her company, Sally Ride Science, in San Diego.

Along with its primary science instrument, each spacecraft carried a MoonKAM camera that took more than 115,000 total images of the lunar surface. Imaging targets were proposed by middle school students from across the country and the resulting images returned for them to study. The names of the spacecraft were selected by Ride and the mission team from student submissions in a nationwide contest.

“Sally Ride worked tirelessly throughout her life to remind all of us, especially girls, to keep questioning and learning,” said Sen. Barbara Mikulski of Maryland. “Today her passion for making students

part of NASA’s science is honored by naming the impact site for her.”

Fifty minutes prior to impact, the spacecraft fired their engines until the propellant was depleted. The maneuver was designed to determine precisely the amount of fuel remaining in the tanks. This will help NASA engineers validate computer models to improve predictions of fuel needs for future missions.

“Ebb fired its engines for 4 minutes, 3 seconds and Flow fired its for 5 minutes, 7 seconds,” said GRAIL project manager David Lehman of NASA’s Jet Propulsion Laboratory (JPL) in Pasadena, Calif. “It was one final important set of data from a mission that was filled with great science and engineering data.”

The mission team deduced that much of the material aboard each spacecraft was broken up in the energy released during the impacts. Most of what remained probably is buried in shallow craters. The craters’ size may be determined when NASA’s Lunar Reconnaissance Orbiter returns images of the area in several weeks.

Launched in September 2011, Ebb and Flow had been orbiting the moon since Jan. 1, 2012. The probes intentionally were sent into the lunar surface because they did not have sufficient altitude or fuel to

continue science operations. Their successful prime and extended science missions generated the highest resolution gravity field map of any celestial body. The map will provide a better understanding of how Earth and other rocky planets in the solar system formed and evolved.

“We will miss our lunar twins, but the scientists tell me it will take years to analyze all the great data they got, and that is why we came to the moon in the first place,” Lehman said. “So long, Ebb and Flow, and we thank you.”

JPL manages the GRAIL mission for NASA’s Science Mission Directorate in Washington. GRAIL is part of the Discovery Program managed at NASA’s Marshall Space Flight Center in Huntsville, Ala. Lockheed Martin Space Systems in Denver built the spacecraft.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 31, 2015

News: Carter: Military leaders could arm more troops at home – Following the recent fatal shooting of four Marines and a sailor in Tennessee, Defense Secretary Ash Carter is ordering the military services to consider new policies that would enhance security for troops at home, including potentially arming more personnel.   Business: DOD weighs supplier base,...
 
 

News Briefs July 31, 2015

U.S. delivering eight newer F-16 warplanes to Egypt The United States Embassy in Cairo says the U.S. is delivering eight newer F-16 warplanes to Egypt as part of an ongoing military support package. It says in a July 30 statement that the aircraft, of the current Block 52 production variant, will be flown in from...
 
 
Lockheed Martin photograph

Lockheed Martin successfully tests design changes for Orion spacecraft’s fairing separation system

Lockheed Martin photograph A protective panel for Orion’s service module is jettisoned during testing at Lockheed Martin’s Sunnyvale, California facility. This test series evaluated design changes to the spacecraft’s fair...
 

 

Australian company to provide parts for initial production of Triton UAS

Northrop Grumman has awarded the first Australian supplier contract for the U.S. Navy’s MQ-4C Triton unmanned aircraft system initial production lot to Ferra Engineering. Brisbane-based Ferra Engineering will manufacture mechanical sub-assemblies for the first four Triton air vehicles including structural components. “At Northrop Grumman it’s very important to not only develop...
 
 
Boeing photograph

CH-46 ‘Phrog’ makes its last hop

Boeing photograph The CH-46 Sea Knight helicopter commonly known as the “Phrog,” is set to retire and to be flown one last time by Reserve Marine Medium Helicopter Squadron (HMM) 774 on Aug. 1. The CH-46 Sea Knight is a med...
 
 

Insitu awarded LRIP Lot IV RQ-21A Blackjack Systems contract

Under the terms of its latest contract, Insitu will build six RQ-21A Blackjack systems for the U.S. Navy and Marine Corps. The $78-million Small Tactical Unmanned Aircraft Systems Lot IV Low Rate Initial Production contract is the latest event in the program’s progression toward the Initial Operational Test and Evaluation phase.   “This award will...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>