Business

December 21, 2012

Raytheon’s U.S. Navy satellite terminals reach full rate production milestone

Raytheon’s Navy Multiband Terminal, which will be installed on more than 300 U.S. Navy ships, subs and shore stations, has successfully completed a Full Rate Production review by the Navy.

The review included a report that determined NMT was both operationally suitable and operationally effective, and further recommended the continued fleet introduction of NMT as a replacement for legacy military satellite communications systems.

Raytheon has already delivered 75 terminals under contract, with an estimated total of 350 over the life of the 15-year program.

NMT provides secure, protected communications links with orbiting military satellites. The terminals will give the United States and three international partners – Canada, the Netherlands and the United Kingdom – up to five times the bandwidth with lower size, weight and power than the systems they will replace.

“Our Navy terminals can withstand the harshest of environments at sea while maintaining constant contact with the satellite,” said Scott Whatmough, vice president of Integrated Communication Systems in Raytheon’s Network Centric Systems business. “That means warfighters can accomplish their missions knowing they have secure, reliable, protected communications.”

NMT is one of three Advanced Extremely High Frequency terminals from Raytheon that have passed production acquisition milestone decisions and successfully tested with the on-orbit AEHF satellite. All three terminals have supported, and are fully compatible with, the military’s two on-orbit AEHF satellites, as well as with the legacy Milstar satellites.

Raytheon’s fielded terminals are ready to provide the military with fully interoperable communications as soon as the AEHF satellites complete testing and are operational. The terminals will provide long-awaited increased bandwidth using the satellite’s Extended Data Rate waveform, one of the military’s most complex, low probability-detect, anti-jam waveforms.

Raytheon is the only defense contractor with AEHF terminals for three branches of the military.

 




All of this week's top headlines to your email every Friday.


 
 

 
NG-people2

Northrop Grumman names VP, mission assurance for Electronic Systems sector

Northrop Grumman has appointed Sonal B. Deshpande vice president of mission assurance for the company’s Linthicum-based Electronic Systems sector. In this position, Deshpande is responsible for mission assurance across th...
 
 
sikorsky-raider

Sikorsky S-97 Raider helicopter achieves successful first flight

Sikorsky Aircraft Corp., a United Technologies Corp. subsidiary, announced May 22 the successful first flight of the S-97 Raider™ helicopter, a rigid coaxial rotor prototype designed to demonstrate a game-changing combination...
 
 
NG-people

Northrop Grumman appoints VP, program manager ISR division

Northrop Grumman announced it has appointed Steve Lunny, vice president and program manager for the intelligence, surveillance and reconnaissance division within the company’s Information Systems sector. Lunny will report...
 

 

HELLADS laser completes development

General Atomics Aeronautical Systems, Inc. announced May 21 that the High-Energy Liquid Laser completed the U.S. government acceptance test procedure and is now being shipped to the White Sands Missile Range, N.M. At WSMR, the laser will undergo an extensive series of live fire tests against a number of military targets.  GAASI is a leading...
 
 
boeing-transaero

Boeing delivers Transaero’s first Next-Generation 737-800

Boeing May 22 delivered Transaero’s first Next-Generation 737-800. The airplane, sporting a new livery, arrived at Moscow’s Domodedovo Airport. Boeing May 22 delivered Transaero’s first Next-Generation 737-800. The airpla...
 
 
Boeing photograph

Boeing-upgraded French AWACS take flight

Boeing photograph A French AWACS aircraft patrols the skies as part of a routine mission. The French AWACS fleet is in the midst of the Mid-Life Upgrade that modernizes the capabilities on board. Initial operating capability of...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>