Business

January 11, 2013

Boeing rolls out first 777 at increased production rate

Boeing has rolled out the first 777 to be built at the increased production rate of 8.3 per month, or 100 airplanes per year. The airplane is a 777 Freighter that will be delivered in February to Korean Air.

Boeing has rolled out the first 777 to be built at the increased production rate of 8.3 per month, or 100 airplanes per year. The airplane is a 777 Freighter that will be delivered in February to Korean Air.

The production increase began in October when the first airplane parts entered the Everett factory. Planning for the increased rate has been in work for almost a year.

“As we built the first airplane at the new rate, we saw some of the best production metrics ever,” said Scott Fancher, vice president and general manager, 777 program and Airplane Development. “Our factory is running smoothly and we’ve reduced the time it takes to build a 777 by one day from 49 to 48 days.”

New manufacturing innovations such as flex-track drilling in the body and wing panels, automated floor drilling and wings painting equipment also contributed.

“Employee involvement teams have been critical to the rate increase,” Fancher said. “Ideas from those teams are saving time while improving quality and safety.”

In the past 31 months, the 777 program has increased rate two times. First from five to an all-time high production rate of seven in 2011, and now going beyond that to an all-time high rate of 8.3 airplanes per month.

1,066 777s have been delivered to date and a total of 1,431 have been ordered from 66 customers around the globe.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 30, 2014

News: Software to power F-35 running as much as 14 months late¬†- Software needed to operate Lockheed Martin’s F-35 jet, the Pentagon’s costliest weapons system, may be as much as 14 months late for required flight testing, according to a Pentagon review.   Business: Lockheed will turn on JLTV production line In August; 6-D truck...
 
 

News Briefs July 30, 2014

U.S. military deaths in Afghanistan at 2,197 As of July 29, 2014, at least 2,197 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,819 military service members have died in Afghanistan as a result...
 
 
Lockheed Martin photograph by Tom Reynolds

F-35B successfully completes wet runway, crosswind testing

Lockheed Martin photograph by Tom Reynolds F-35B aircraft BF-4, piloted by Lockheed Martin Test Pilot Dan Levin, starts down the runway as part of wet runway and crosswind testing at Edwards AFB, Calif. In an important program ...
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ‚...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 
NASA photograph by Carla Thomas

Katherine Lott awarded NASA Armstrong employee scholarship

NASA photograph by Carla Thomas Katherine Lott, the recipient of the 2014 NASA Armstrong Employee Exchange Council Joseph R. Vensel Memorial Scholarship, is congratulated by NASA Armstrong center director David McBride. Flankin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>