Business

January 16, 2013

Typhoon Meteor first firing trial a success

The Meteor Beyond Visual Range Air-to-Air Missile has been successfully launched from a Eurofighter Typhoon as part of the Future Enhancements Flight Test Programme.

The missile was eject launched from a rear fuselage missile station, which on Eurofighter Typhoon is semi-conformal for aircraft drag and radar signature reduction. The missile motor was fired, providing data that will allow the missile launch envelope to be expanded. This builds on an earlier series of flight trials, carried out by ourselves on behalf of the Eurofighter programme, where unpowered missiles were used to demonstrate safe separation on the missile.

This current package of work begins the full integration of the Meteor missile with all Eurofighter Typhoon systems. The flight trials were conducted with integrated support from QinetiQ and MBDA.

After taking part in the Meteor trials, our Typhoon Test Pilot Steve Long said: “By completing these initial Meteor flight trials, Typhoon has taken a significant leap forward in operational capability. As a fighter pilot, you ultimately want the best possible combination of aircraft and advanced weapons to ensure mission success and to get you home safely. The range and performance of the Meteor weapon goes a long way to achieving this – with confidence. A potent long range missile, coupled with a highly agile aircraft gives us a very potent and very powerful mix.”

Meteor, a beyond visual range air-to-air missile manufactured by MBDA will provide the Eurofighter Typhoon aircraft with the next generation of cutting edge weapons capability.

Featuring advanced air breathing motor technology for maximum range and the latest electronics to deliver optimum combat performance, it will ensure that Eurofighter Typhoon remains the world’s most advanced multi role aircraft and will further complement its short and medium range air-to-air missile capabilities.

The integration of the Meteor weapon is a game-changer on the battlefield; adding another layer to Eurofighter Typhoon’s swing-role capabilities and ensuring the pilot is able to engage hostile air threats at long range at the same time as identifying and engaging targets on the ground.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 22, 2014

News: GAO: Pentagon violated law with Bergdahl swap - Congressional investigators say the Pentagon violated the law when it swapped five Taliban leaders for Army Sgt. Bowe Bergdahl, who was held prisoner in Afghanistan for five years.   Business: U.S. Air Force issues RFI for new rocket engine - The US Air Force is officially looking into...
 
 

News Briefs August 22, 2014

U.S. military deaths in Afghanistan at 2,200 As of Aug. 20, 2014, at least 2,200 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,821 military service members have died in Afghanistan as a result...
 
 
navair-triton

MQ-4C Tritons to arrive at Pax River this fall

  MQ-4C Triton test air vehicles at Northrop Grumman’s facility in Palmdale, Calif., will fly cross-country to Naval Air Station Patuxent River, Md., this fall. The MQ-4C completed a test flight Aug. 19 with updated ...
 

 
Boeing photograph

Boeing program completes critical design, safety reviews

Boeing photograph Boeing recently completed the Phase Two Spacecraft Safety Review of its Crew Space Transportation-100 spacecraft and the Critical Design Review of its integrated systems, meeting all of the companyís Commerci...
 
 
global-hawk2

Air Combat Command loans Global Hawk to GVCTF

Air Force photograph by Jennifer Romo The 412th Test Wing’s Global Vigilance Combined Test Force received a Global Hawk Block 40 Aug. 6, on loan from Air Combat Command. Tail number 2035, from Grand Forks AFB, N.D., is jo...
 
 

NASA awards program analysis, Control Bridge III Contract

NASA has awarded the Program Analysis and Control III Bridge contract for support services to ASRC Research & Technology Solutions of Beltsville, Md. The cost-plus-fixed-fee, indefinite delivery/indefinite quantity basic contract has a minimum ordering value of $1 million and a maximum ordering value of $37 million, with a performance period beginning Aug. 30 through Feb....
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>