Defense

January 25, 2013

418th FLTS prepares to test India’s first C-17 at Edwards

Tags:
Jet Fabara
412th TW Public Affairs

The first C-17 heavy-lift aircraft built for the Indian Air Force touches down on Runway 22L. The 418th Flight Test Squadron will begin aircraft inspection and routine flight testing for the next two months.

With Boeing’s completion of the Indian Air Force’s first C-17 heavy-lift aircraft in early January 2013, the 418th Flight Test Squadron became the first squadron to fly India’s newest acquisition in order to begin testing it at Edwards.

The 418th FLTS flew the C-17, known as IN1, during a ferry flight from the Boeing factory in Long Beach, Calif., to Edwards Jan. 22.

“We are very excited because this is the first foreign military sale C-17 tested by the 418th FLTS at Edwards. The Indian government requested an independent evaluation to show they are getting the best; most currently fielded C-17 available and the C-17 Integrated Test Team at the 418th Flight Test Squadron will do just that,” said Shelly Huie, 412th TW C-17 ITT project manager.

During the aircraft’s duration at Edwards, the test team will consist of discipline engineers, flight test engineers, test pilots, load masters, logistics professionals, program managers, and maintainers from within the Global Reach Combined Test Force.

The Indian Air Force C-17 parked at the 418th Flight Test Squadron.

“Most of the team for this test has been working together for years on various programs, so the teamwork is already well-developed – which is another great benefit the customer will receive by testing the aircraft here at Edwards,” said Maj. Cory Naddy, 418th FLTS C-17 assistant director operations.
“Specifically, for the India program, this team has been working over the last few months to hammer out the specific requirements of each test point.”
In the next few weeks, the 418th FLTS side of the GRCTF will set about reviewing and approving flight and ground test cards.

“During this time, our maintainers, including Boeing support, will be working to modify the aircraft with instrumentation required to gather the data we need to complete the test. Following that modification, the aircraft will start ground and flight test. In this phase of the program, our C-17 flight test engineers, test pilots, loadmasters and discipline engineers will be working closely together to execute the approved test plan,” Naddy said.

“Interestingly, there will be portions of the flight test phase that will require us to pull in other crewmembers and support from other aircraft to execute certain test points. All of these test points will require squadron leadership supervision and involvement. So, to put it simply, dedicated and in-depth teamwork from the entire GRCTF team will be necessary to get the India program to a satisfactory completion on the timeline projected,” added Naddy.

According to Huie, IN1 is expected to be here for about two months to undergo aircraft inspection and routine flight testing.

“The testing has the potential to extend into mid-April, if needed; but the team expects most testing to be completed by mid-March,” said Naddy. “Since this is the first foreign military sale C-17 tested by the 418th FLTS, it has introduced some new dynamics to our testing here and we hope that we will get to see other FMS programs roll through the GRCTF in the future.”

The GRCTF at Edwards is the premiere test force for heavy aircraft, including KC-46, KC-10, and KC-135 tankers, C-17 and C-130 tactical airlift and C-5 strategic airlift. GRCTF personnel have been testing C-17 aircraft, components, and modifications for deployment to the operational mobility force since 1991.

Boeing plans to make 10 C-17s for the Indian Air Force.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 18, 2014

News: U.S. mission in Iraq could expand, Pentagon official says - The mission for U.S. troops in Iraq to help Kurdish and Iraqi security forces in their fight against Islamic militants remains limited for now, but may expand after Iraqi leaders form a new government, a Pentagon spokesman said Aug. 19.   Business: Fuel deals top...
 
 

News Briefs August 20, 2014

Trials complete on fourth Coast Guard cutter Ingalls Shipbuilding in Pascagoula, Miss., has completed acceptance sea trials for the company’s fourth U.S. Coast Guard national security cutter, Hamilton. Jim French, Ingalls’ NSC program manager, tells The Mississippi Press) the Hamilton is scheduled to be delivered next month and commissioned on Dec. 6 in Charleston, South...
 
 
Army photograph by Sgt. Thomas Duval

Air Force, Army Aviation come together to complete vital mission in Egypt

Army photograph by Sgt. Thomas Duval Soldiers and airmen load a UH-60 Black Hawk into an Air Force C17 Globemaster III Aug. 19, 2104, at an old Israeli airstrip in the Sinai Peninsula of Egypt. The airstrip is now used by the M...
 

 
Air Force photograph by TSgt. Terri Praden

Joint effort validates ability to move Stryker vehicles via air

Air Force photograph by TSgt. Terri Praden An Army Stryker combat vehicle is guided into a C-17 Globemaster III during a 25th Infantry Division training exercise Aug. 13, 2014, at Joint Base Pearl Harbor-Hickam, Hawaii. The Str...
 
 
NASA image

Ozone-depleting compound persists, NASA research shows

NASA image Satellites observed the largest ozone hole over Antarctica in 2006. Purple and blue represent areas of low ozone concentrations in the atmosphere; yellow and red are areas of higher concentrations. NASA research show...
 
 

F-16V completes major capability milestone

The newest configuration of the F-16 Fighting Falcon, the F-16V, has reached a major capability milestone with the integration of a new Active Electronically Scanned Array radar. Completing this milestone on schedule demonstrates our ability to meet program commitments, said Roderick McLean, vice president and general manager of the F-16/F-22 Integrated Fighter Group at Lockheed...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>