Business

January 25, 2013

Army orders MUOS upgrade for AN/PRC-155 Manpack radios from General Dynamics

The U.S. Army ordered kits in December to upgrade 100 Handheld, Manpack, Small Form Fit (HMS) AN/PRC-155 two-channel Manpack radios to enable them to communicate with the military’s Mobile User Objective System satellite communications system.

This MUOS channel upgrade, comprising a field-replaceable power amplifier and supporting software, will allow secure voice and data communication with the MUOS system. The order is valued at $5 million; the kits will be delivered in the fall of 2013.

“By upgrading fielded PRC-155 radios, the Army will greatly enhance soldier effectiveness by providing a tenfold increase in SATCOM capacity for secure, over-the-horizon military communications,” said Chris Marzilli, president of General Dynamics C4 Systems. “MUOS access on the two-channel PRC-155 will also allow current Army networks to be bridged and extended far beyond their current reach.”

The two-channel PRC-155 Manpack radio also runs the essential waveforms from the defense department library. They include the Soldier Radio Waveform (SRW) that connects dismounted soldiers to the network, the Wideband Networking Waveform (WNW) that seamlessly transports large amounts of data and the legacy SINCGARS waveform for communication with existing radios. Using the PRC-155′s two-channel capability, soldiers operating on any one of these waveforms on one channel, can interconnect with soldiers using another waveform on the second channel. With the MUOS capability in the PRC-155, a network of soldiers can be interconnected with others in a far distant location.

The MUOS waveform, based on the communications interface found in commercial cellular networks, will deliver high-speed voice and data communications and 10-times greater capacity than the military’s current Ultra High Frequency satellite communications system. With a smartphone-like flow of information, the upgraded PRC-155 radios will allow soldiers to access the MUOS communications system wherever they are deployed, on foot or from land vehicles, ships, submarines and aircraft.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 22, 2014

News: GAO: Pentagon violated law with Bergdahl swap - Congressional investigators say the Pentagon violated the law when it swapped five Taliban leaders for Army Sgt. Bowe Bergdahl, who was held prisoner in Afghanistan for five years.   Business: U.S. Air Force issues RFI for new rocket engine - The US Air Force is officially looking into...
 
 

News Briefs August 22, 2014

U.S. military deaths in Afghanistan at 2,200 As of Aug. 20, 2014, at least 2,200 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,821 military service members have died in Afghanistan as a result...
 
 
navair-triton

MQ-4C Tritons to arrive at Pax River this fall

  MQ-4C Triton test air vehicles at Northrop Grumman’s facility in Palmdale, Calif., will fly cross-country to Naval Air Station Patuxent River, Md., this fall. The MQ-4C completed a test flight Aug. 19 with updated ...
 

 
Boeing photograph

Boeing program completes critical design, safety reviews

Boeing photograph Boeing recently completed the Phase Two Spacecraft Safety Review of its Crew Space Transportation-100 spacecraft and the Critical Design Review of its integrated systems, meeting all of the companyís Commerci...
 
 
global-hawk2

Air Combat Command loans Global Hawk to GVCTF

Air Force photograph by Jennifer Romo The 412th Test Wing’s Global Vigilance Combined Test Force received a Global Hawk Block 40 Aug. 6, on loan from Air Combat Command. Tail number 2035, from Grand Forks AFB, N.D., is jo...
 
 

NASA awards program analysis, Control Bridge III Contract

NASA has awarded the Program Analysis and Control III Bridge contract for support services to ASRC Research & Technology Solutions of Beltsville, Md. The cost-plus-fixed-fee, indefinite delivery/indefinite quantity basic contract has a minimum ordering value of $1 million and a maximum ordering value of $37 million, with a performance period beginning Aug. 30 through Feb....
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>