Space

January 25, 2013

NASA’s TDRS Flight 6, Built by Northrop Grumman, marks 20 years on orbit

The space shuttle Endeavour (STS 54) deploys TDRS Flight 6 on Jan. 13, 1993. The Northrop Grumman-built satellite marked 20 years of successful on-orbit performance Jan. 13, 2013 – 10 years longer than its design life.

REDONDO BEACH, Calif. – The sixth Tracking and Data Relay Satellite (TDRS), built for NASA by Northrop Grumman Corporation (NYSE:NOC), marked 20 years of successful on-orbit performance Jan. 13, surpassing its design life by a decade.

Placed into orbit by the space shuttle Endeavour (STS-54) in 1993, TDRS Flight 6 has provided a multitude of communications services to a wide variety of missions, such as transmitting stunning images from the Hubble Space Telescope to Earth, and delivering pictures, television, voice and data from the International Space Station.

Northrop Grumman’s Aerospace Systems sector built the first generation of seven TDRS spacecraft at its Space Park facilities in Redondo Beach. TDRS-6 is currently in geosynchronous orbit in a location over the Atlantic Ocean above Brazil, according to NASA.

“TDRS satellites have set a new standard for long life and reliability, enhancing Earth-to-space communications for nearly three decades,” said Jeff Grant, sector vice president and general manager, Northrop Grumman Space Systems. “Their on-orbit performance has moved science and technology forward to support the nation.”

Flight 6 joins other company-built TDRS spacecraft that have performed far beyond their 10-year design life. Flight 1 was operational for nearly 27 years before being decommissioned in 2010, while Flight 4 was retired in 2011 after 22 years of service. Flights 3 and 5 are still performing on orbit after 24 and 21 years on orbit, respectively.

NG-satellite2

The TDRS system was established by NASA to rely less heavily on international ground stations and create long-duration and highly available communication coverage, with the prime design goal of providing continuous, around the clock communications services to the space agency’s most critical low Earth-orbiting missions, and improving the amount of data that could be received.

NASA’s Goddard Space Flight Center in Greenbelt, Md., is responsible for planning, developing and implementing the worldwide near-Earth space communications networks, including the management of the operations and development of the TDRS and the rest of the space network.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 18, 2014

News: U.S. mission in Iraq could expand, Pentagon official says - The mission for U.S. troops in Iraq to help Kurdish and Iraqi security forces in their fight against Islamic militants remains limited for now, but may expand after Iraqi leaders form a new government, a Pentagon spokesman said Aug. 19.   Business: Fuel deals top...
 
 

News Briefs August 20, 2014

Trials complete on fourth Coast Guard cutter Ingalls Shipbuilding in Pascagoula, Miss., has completed acceptance sea trials for the company’s fourth U.S. Coast Guard national security cutter, Hamilton. Jim French, Ingalls’ NSC program manager, tells The Mississippi Press) the Hamilton is scheduled to be delivered next month and commissioned on Dec. 6 in Charleston, South...
 
 
Army photograph by Sgt. Thomas Duval

Air Force, Army Aviation come together to complete vital mission in Egypt

Army photograph by Sgt. Thomas Duval Soldiers and airmen load a UH-60 Black Hawk into an Air Force C17 Globemaster III Aug. 19, 2104, at an old Israeli airstrip in the Sinai Peninsula of Egypt. The airstrip is now used by the M...
 

 
Air Force photograph by TSgt. Terri Praden

Joint effort validates ability to move Stryker vehicles via air

Air Force photograph by TSgt. Terri Praden An Army Stryker combat vehicle is guided into a C-17 Globemaster III during a 25th Infantry Division training exercise Aug. 13, 2014, at Joint Base Pearl Harbor-Hickam, Hawaii. The Str...
 
 
NASA image

Ozone-depleting compound persists, NASA research shows

NASA image Satellites observed the largest ozone hole over Antarctica in 2006. Purple and blue represent areas of low ozone concentrations in the atmosphere; yellow and red are areas of higher concentrations. NASA research show...
 
 

F-16V completes major capability milestone

The newest configuration of the F-16 Fighting Falcon, the F-16V, has reached a major capability milestone with the integration of a new Active Electronically Scanned Array radar. Completing this milestone on schedule demonstrates our ability to meet program commitments, said Roderick McLean, vice president and general manager of the F-16/F-22 Integrated Fighter Group at Lockheed...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>