Defense

January 25, 2013

New Army network gets final check-out on way to field

Tags:
Claire Heininger
Fort Dix, N.J.

army-network1
As soldiers prepare to deploy with the Army’s new tactical communications network later this year, Army engineers are stretching the equipment to its limits to ensure it can support complex, on-the-move operations and extend the range of communications to the farthest edges of the battlefield.

The Network Verification event for Capability Set 13, or CS 13, is a technical test that runs the systems through realistic operational threads in order to validate configurations specific to two brigade combat teams, known as BCTs, of the 10th Mountain Division, who are now training on the equipment in advance of their deployment. It is the final check-out for CS 13, coming on top of the Network Integration Evaluations, or NIEs, that shaped the capability set, as well as the safety release and safety confirmation testing that cleared new networked vehicles for use in training and in theater.

“We’re taking an extra step because we realize the magnitude of the integration effort,” said Robert Puhalla, synchronized fielding test lead, Army System of Systems Engineering and Integration Directorate. “This event gives us added confidence in the final combined product, knowing that the platforms coming off the production line operate as a fully integrated system of systems.”

CS 13 is the Army’s first integrated communications package that spans the entire BCT formation, connecting the fixed tactical operations center to the commander on-the-move to the dismounted Soldier. The network is designed to help deployed units cover greater distances, make quicker decisions and share more information across more echelons than is possible in today’s operational force.
army-network2
“That capability is not just with the division commander — that capability is all the way down to the Soldier,” said Col. Mark Elliott, director of the Army G-3/5/7 LandWarNet-Mission Command Directorate. “We are also giving units equipment that has been integrated up front, so they don’t have to worry about it.”
Network Verification, which is being conducted this month at the Fort Dix, N.J., field laboratories and facilities of the U.S. Army Communications-Electronics Research, Development and Engineering Center, or CERDEC, is using more than a dozen mine-resistant, ambush-protected vehicles, known as MRAPs, recently integrated at the Space and Naval Warfare, or SPAWAR, Systems Center Atlantic in Charleston, S.C., to create a representative “slice” of the Capability Set 13 architecture. Through instrumentation and human data collectors seated in the vehicles, the Army Test and Evaluation Command is measuring network traffic and performance – such as timely delivery of messages, orders and unit locations – across various distances and terrain obstructions.

There are also representative brigade, battalion and company command posts equipped with the CS 13 network backbone, radios, software and other systems found at each echelon. The goal is to confirm that the network architecture for the 10th Mountain Division BCTs can support a range of scenarios at each level and across the BCT, said Network Verification test director Joseph Kobsar, deputy director for CERDEC’s Product Director C4ISR Network Modernization. C4ISR stands for Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance.

“We’re leveraging the unique capabilities and infrastructure of our facilities at Joint Base McGuire-Dix-Lakehurst (N.J.) to support this mission, which is to verify that CS 13 does indeed provide a robust and flexible methodology for tailoring communication capabilities to address challenges that commanders often face,” Kobsar said.

These final check-outs come on top of the NIEs, a series of rigorous field exercises leveraging 3,800 Soldiers of the 2nd Brigade, 1st Armored Division, executing missions in the mountains and desert of White Sands Missile Range, N.M. The NIEs validated the makeup of the CS 13 network, and also produced Soldier feedback that was incorporated into CS 13 MRAP vehicle designs built at SPAWAR and delivered to the 10th Mountain Division.

There are multiple unique vehicle configuration types, which correspond to the numerous unique roles within a BCT and take into account the need for different combinations of communications systems, along with size, weight and power constraints.

Given that complexity, the Army is doing its “due diligence” by measuring the final integrated product through specific technical checkouts at Joint Base McGuire-Dix-Lakehurst, Puhalla said.

“There are a number of improvements made since the NIE, as well as network configurations specific to the makeup of the 10th Mountain Division,” said Col. Rob Carpenter, Army director of System of Systems Integration. “Network Verification is part of our continuous assessment and improvement of the tactical network.”




All of this week's top headlines to your email every Friday.


 
 

 

Headlines October 20, 2014

News: Navy grounds ‘Top Guns’ - The F/A-18s needs spare parts and in too many cases they’re being taken from brand new jets. This is a risk to national security and pilots’ lives.   Business: Boeing seeks revised schedule for U.S. aerial tanker - Boeing is revising its master schedule for developing the new U.S. Air Force...
 
 

News Briefs October 20, 2014

New military medical team to help with Ebola in U.S. Defense Secretary Chuck Hagel has ordered the military to prepare and train a 30-member medical support team that could provide short-term help to civilian health professionals if there are more Ebola cases in the United States. His spokesman, Rear Adm. John Kirby, says the team...
 
 

Dragon ‘fires up’ for flight

The Air Force and NATO are undergoing a cooperative development effort to upgrade the avionics and cockpit displays of AWACS aircraft belonging to the 552nd Air Control Wing at Tinker Air Force Base, Okla., and the NATO E-3 Sentrys from Geilenkirchen, Germany. The Diminishing Manufacturing Sources Replacement of Avionics for Global Operations and Navigation, otherwise...
 

 
Boeing photographs

Boeing-built X-37B successfully completes third flight

Unmanned spacecraft concludes record-setting 674-day mission   Boeing photograph A third mission of the Boeing-built X-37B Orbital Test Vehicle was completed on Oct. 17, 2014, when it landed and was recovered at Vandenberg...
 
 

Boeing concludes commercial crew space act agreement for CST-100/Atlas V

Boeing has successfully completed the final milestone of its Commercial Crew Integrated Capability Space Act Agreement with NASA. The work and testing completed under the agreement resulted in significant maturation of Boeing’s crew transportation system, including the CST-100 spacecraft and Atlas V rocket. NASA in July approved the Critical Design Review Board milestone for Boeing’...
 
 

AF to release small business research solicitations

The Air Force Small Business Innovation Research and Small Business Technology Transfer program office is set to release its fiscal year 2015 list of topics Oct. 22, on the SBIR/STTR website.  Small businesses and research institutions with expertise to address the topics’ technology challenges are encouraged to submit proposals. During 2014, the Defense Department SBIR...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>