Defense

January 30, 2013

An Excalibur’s first flight over Kandahar

Tags:
SSgt. Jason Ragucci
Kandahar, Afghanistan

army-round1
army-round2
Gunners of Bravo Battery, 2nd Battalion, 3rd Field Artillery Regiment, shot an Excalibur round out of a M-777 howitzer cannon for the first time at Forward Operating Base Frontenac, Kandahar, Afghanistan, Jan. 20.

The Excalibur is a separate loading, 155MM, extended-range, precision-guided projectile designed for use with other 155MM digitized Howitzers.

The M-777 is designed to be a digitally programmed weapon and is about 9,800 pounds lighter than the more commonly used M-198 Howitzer, and is reportedly more accurate.
army-round3
The Excalibur is intended to be used against personnel and light material such as command posts and air defense radars. It is guided to its target by the use of global positioning system, or GPS. This type of round on average costs more than $80,000 due to major technological advances within the explosive round.

“They don’t get shot very often due to the high cost,” said SSgt. Ralph Dobrovolny, Bravo Battery, 2nd Battalion, 3rd Field Artillery Regiment, platoon sergeant. “The Excalibur is shot because it is most accurate and causes the least amount of collateral damage and casualties that can be caused by field artillery.”
army-round4
The planning of the Excalibur fire mission took nearly a month. Once the Fire Support Officer located the land for impact, he had to get the proper approval. Lt. Col. Paul Weyrauch, commander of 2nd Battalion, 3rd Field Artillery, finally gave permission for the Gunners of B Battery, to fire the expensive round for the first time at Forward Operating Base Frontenac’s firing point.

The first Excalibur round fired in Afghanistan was with Charlie Battery, 3rd Battalion, 321st Field Artillery Regiment, in Kunar Province, Feb. 25, 2008.

SSgt. Arshun Daniels, 1st Platoon, B Battery, 2nd Battalion, 3rd Field Artillery, chief of section, prepared his section by conducting “dry” fire missions before the actual live-fire exercise.
army-round5
“I make sure the rounds are right, the powders are right, the fuzes are right and that everybody is doing the right thing, so that my chief can focus more on his job,” said Spec. Michael Arnold, 1st Platoon, B Battery, 2nd Battalion, 3rd Field Artillery, ammunition team chief.

The GPS-guided Excalibur round was given the proper grid coordinate to seek out and destroy a target using the Enhanced Portable Inductive Artillery Fuse Setter by placing the system on the tip of the round and sending a digital message containing the coordinate for the round to find.

The Excalibur was fired using the M-777A2 155mm howitzer. The firing of the Excalibur round was a high-angle successful mission. The gunners at Forward Operating Base Frontenac are planning to shoot their next Excalibur fire mission soon.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 31, 2015

News: Carter: Military leaders could arm more troops at home – Following the recent fatal shooting of four Marines and a sailor in Tennessee, Defense Secretary Ash Carter is ordering the military services to consider new policies that would enhance security for troops at home, including potentially arming more personnel.   Business: DOD weighs supplier base,...
 
 

News Briefs July 31, 2015

U.S. delivering eight newer F-16 warplanes to Egypt The United States Embassy in Cairo says the U.S. is delivering eight newer F-16 warplanes to Egypt as part of an ongoing military support package. It says in a July 30 statement that the aircraft, of the current Block 52 production variant, will be flown in from...
 
 
Lockheed Martin photograph

Lockheed Martin successfully tests design changes for Orion spacecraft’s fairing separation system

Lockheed Martin photograph A protective panel for Orion’s service module is jettisoned during testing at Lockheed Martin’s Sunnyvale, California facility. This test series evaluated design changes to the spacecraft’s fair...
 

 

Australian company to provide parts for initial production of Triton UAS

Northrop Grumman has awarded the first Australian supplier contract for the U.S. Navy’s MQ-4C Triton unmanned aircraft system initial production lot to Ferra Engineering. Brisbane-based Ferra Engineering will manufacture mechanical sub-assemblies for the first four Triton air vehicles including structural components. “At Northrop Grumman it’s very important to not only develop...
 
 
Boeing photograph

CH-46 ‘Phrog’ makes its last hop

Boeing photograph The CH-46 Sea Knight helicopter commonly known as the “Phrog,” is set to retire and to be flown one last time by Reserve Marine Medium Helicopter Squadron (HMM) 774 on Aug. 1. The CH-46 Sea Knight is a med...
 
 

Insitu awarded LRIP Lot IV RQ-21A Blackjack Systems contract

Under the terms of its latest contract, Insitu will build six RQ-21A Blackjack systems for the U.S. Navy and Marine Corps. The $78-million Small Tactical Unmanned Aircraft Systems Lot IV Low Rate Initial Production contract is the latest event in the program’s progression toward the Initial Operational Test and Evaluation phase.   “This award will...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>