Business

January 30, 2013

Boeing 737 program starts building at higher production rate

boeing-737
Boeing photograph

Boeing Mechanics load initial parts of the spars for the first airplane at the new rate into a spar-assembly machine.

Boeing has begun assembly of the first Next-Generation 737 to be built at the rate of 38 airplanes per month. Over the past two years, production of the 737 has risen more than 20 percent, from 31.5 to 38 airplanes a month. In 2014, the rate will go up again to 42 airplanes a month.

Today mechanics completed loading initial parts of the spars – internal support structures in the wings ñ into an automated spar-assembly machine. The spar is the first step in building the wings and marks the start of major manufacturing for an airplane.

“The first spar load serves as the defining moment for our latest rate break, and the 737 team did it as planned, on schedule,” said Beverly Wyse, vice president and general manager of the 737 program. “We have more hard work ahead of us, but we are well on our way to another successful production rate increase.”

Employee teams have been instrumental in reducing 737 production flow by developing and implementing innovative efficiency improvements.

The first Next-Generation 737 built at the new rate is scheduled to be delivered in the second quarter of this year.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines May 29, 2015

News: U.S. Army chief opens door to embedding U.S. troops with Iraqi forces - After the fall of Ramadi, the Iraqi Security Forces need military and political leadership, Gen. Raymond Odierno says.   Business: No acquisition strategy yet for LCS frigates - Details of the new Littoral Combat Ship frigate program’s acquisition strategy are still being reviewed,...
 
 

News Briefs May 29, 2015

Finnish navy: Underwater intruder possible foreign submarine Finnish military officials say that an underwater object the navy chased last month in territorial waters and dropped several depth charges could have been a foreign submarine. A navy investigation released May 28 says that technical analysis did not provide sufficient proof of the presence of a submarine...
 
 
Lockheed Martin photograph by Chad Bellay

F-16 test pilots hit the ‘road’ to help train USAFE pilots

Air Force photograph by Airman 1st Class Kyla Gifford Three F-16s assigned to Spangdahlem Air Base, Germany, on a refueling mission last year. Two F-16 test pilots from the 416th Flight Test Squadron recently returned from a &#...
 

 
Navy photograph

Its reign in the fleet over, naval Sea King helicopter now rests at Pax Museum

Navy photograph At more than 54 feet in length with a 62-foot rotor diameter, the mighty SH-3A Sea King helicopter sits in its final spot at the Patuxent River Naval Air Museum. Designed as an anti-submarine warfare helicopter,...
 
 
boeing-korea

New Boeing Avionics Facility to enhance ROKAF readiness, affordability

Boeing formally opened a new avionics maintenance and repair center in the Yeongcheon Industry District of Daegu-Gyeongbuk Free Economic Zone May 28. The 10,000 square-foot facility will test and repair aircraft electrical syst...
 
 
Navy photograph by John F. Williams

ONR testing high-speed planing hulls

Navy photograph by John F. Williams A ship hull model attached to a high-speed sled moves through waves at the David Taylor Model Basin at Naval Surface Warfare Center, Carderock, during Office of Naval Research -sponsored rese...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>