Defense

January 30, 2013

Lockheed Martin receives $197 million U.S. Army contract for Guided MLRS rocket production

Lockheed Martin received a $197 million contract option from the U.S. Army for Guided Multiple Launch Rocket System (GMLRS) Unitary rocket production.

This contract option was attached to the GMLRS Production Lot 7 contract, which now has a total funded value of $550.8 million. The GMLRS Production Lot 7 contract was originally awarded to Lockheed Martin in July 2012. This move enables the service to pay less for each rocket than if a separate 2013 production contract were issued.

“Our top priority is to ensure that our war fighters are equipped with the most effective, affordable and dependable weapon system available, and we’re proud that GMLRS meets that standard,” said Scott Arnold, vice president of precision fires at Lockheed Martin Missiles and Fire Control.

The new allotment of rockets will be delivered to the U.S. Army and Marine Corps beginning in September 2014. Work will be performed at the Lockheed Martin facilities in Camden, Ark., and Dallas.

GMLRS is an all-weather, long-range rocket designed for fast deployment that delivers precision strike beyond the reach of most conventional weapons. GMLRS Unitary rockets greatly exceed the required combat reliability rate and have established a reputation for affordability.

Lockheed Martin has produced more than 20,000 GMLRS rockets. In combat operations, each rocket is packaged in an MLRS launch pod and is fired from the Lockheed Martin HIMARS or M270 family of launchers.

Lockheed Martin Missiles and Fire Control is a 2012 recipient of the U.S. Department of Commerce’s Malcolm Baldrige National Quality Award for performance excellence. The Malcolm Baldrige Award represents the highest honor that can be awarded to American companies for their achievements in leadership, strategic planning, customer relations, measurement, analysis, workforce excellence, operations and results.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 30, 2014

News: Software to power F-35 running as much as 14 months late - Software needed to operate Lockheed Martin’s F-35 jet, the Pentagon’s costliest weapons system, may be as much as 14 months late for required flight testing, according to a Pentagon review.   Business: Lockheed will turn on JLTV production line In August; 6-D truck...
 
 

News Briefs July 30, 2014

U.S. military deaths in Afghanistan at 2,197 As of July 29, 2014, at least 2,197 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,819 military service members have died in Afghanistan as a result...
 
 
Lockheed Martin photograph by Tom Reynolds

F-35B successfully completes wet runway, crosswind testing

Lockheed Martin photograph by Tom Reynolds F-35B aircraft BF-4, piloted by Lockheed Martin Test Pilot Dan Levin, starts down the runway as part of wet runway and crosswind testing at Edwards AFB, Calif. In an important program ...
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 
NASA photograph by Carla Thomas

Katherine Lott awarded NASA Armstrong employee scholarship

NASA photograph by Carla Thomas Katherine Lott, the recipient of the 2014 NASA Armstrong Employee Exchange Council Joseph R. Vensel Memorial Scholarship, is congratulated by NASA Armstrong center director David McBride. Flankin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>