Business

January 30, 2013

U.S. investigators ask Boeing for battery history

U.S. investigators said Jan. 30 they asked Boeing to provide a full operating history of lithium-ion batteries used in its grounded 787 Dreamliners after Japan’s All Nippon Airways revealed it had repeatedly replaced the batteries even before overheating problems surfaced.

National Transportation Safety Board spokesman Peter Knudson said the agency made the request after recently becoming aware of battery problems at ANA that occurred before two recent incidents involving the planes batteries. Boeing has already collected some of the information, he said.

All 50 of the Boeing 787s in use around the world remain grounded after an ANA flight on Jan. 16 made an emergency landing in Japan when its main battery overheated. About a week before that, a battery caught fire in a 787 parked at Boston’s Logan International Airport.

ANA said it had replaced batteries on its 787 aircraft some 10 times because they didn’t charge properly or connections with electrical systems failed, and informed Boeing about the swaps. Japan Airlines also said it had replaced 787 batteries. It described the number involved as a few but couldn’t immediately give further details.

The 787 is the first airliner to make wide use of lithium-ion batteries. They are prone to overheating and require additional safeguards to prevent fires. However, ANA spokeswoman Megumi Tezuka said the airline was not required to report the battery replacements to Japan’s Transport Ministry because they did not interfere with flights and did not raise safety concerns.

Boeing said Wednesday that replacing the batteries on a plane is not uncommon. The company said that it has not “seen 787 battery replacements occurring as a result of safety concerns.”

The ANA spokesman also said that replacing batteries on aircraft was not considered out of the ordinary.

Laura Brown, a spokeswoman for the U.S. Federal Aviation Administration, said in Washington that the agency was checking whether the previous battery incidents had been reported by Boeing.

GS Yuasa, the Kyoto, Japan-based manufacturer of the batteries, said it could not comment.

With 17 of the jets, ANA was Boeing’s launch customer for the technologically advanced airliner. The airline has had to cancel hundreds of flights, affecting tens of thousands of people, but has sought to minimize disruptions by switching to other aircraft as much as possible. ANA and Japan Airlines are among the biggest customers for the 787 and Japanese manufacturers make about 35 percent of the aircraft.

Boeing said batteries on the 787s were returned because of safety mechanisms that make sure the batteries can’t be used if they have been deeply-discharged or improperly disconnected.

Some batteries have also been returned because they exceeded their shelf life, the company said.

The battery problems experienced by ANA before the emergency landing were first reported by The New York Times.

Japanese and U.S. investigators looking into the Boeing 787′s battery problems shifted their attention this week from GS Yuasa to the manufacturer of a monitoring system. That company, Kanto Aircraft Instrument Co., makes a system that monitors voltage, charging and temperature of the lithium-ion batteries.

On Tuesday, the NTSB said it was conducting a chemical analysis of internal short circuiting and thermal damage of the battery that caught fire in Boston.

The probe is also analyzing data from flight data recorders on the aircraft, the NTSB said in a statement on its website.

LOT Polish Airlines and Ethiopian Airlines, two of the eight international carriers that fly the 787, said in separate statements Jan. 30 that they had not experienced any problems with the plane’s lithium ion batteries.

 




All of this week's top headlines to your email every Friday.


 
 

 
Northrop Grumman photograph by Alan Radecki

Second Northrop Grumman-built Triton UAS completes first flight

Northrop Grumman photograph by Alan Radecki The second MQ-4C Triton, built by Northrop Grumman for the U.S. Navy, successfully completed its first flight Oct. 15 PALMDALE, Calif. – The U.S. Navy’s second MQ-4C Triton un...
 
 
Raytheon photograph

Poland’s PIT-RADWAR signs letter of intent with Raytheon

Raytheon photograph Mike Shaughnessy, Vice President of Supply Chain, Raytheon Integrated Defense Systems and Jerzy Milosz, Member of Board and Director of R&D, PIT-RADWAR sign a letter of intent to explore further partners...
 
 

Raytheon to resume work on new electronic warfare planning management software program

The U.S. Army has directed Raytheon to resume work on an Electronic Warfare planning management software program that for the first time will give it automated tools to help plan and execute complex electronic warfare missions. The program restart follows a ruling by the U.S. Court of Federal Claims, which denied the protest filed by...
 

 

Northrop Grumman JCREW achieves milestone C; Program to enter production, deployment phase

Northrop Grumman has received Milestone C approval for its Joint Counter Radio-Controlled Improvised Explosive Device Electronic Warfare Increment 1 Build 1 (I1B1) system from the U.S. Naval Sea Systems Command. The JCREW I1B1 system is a jammer that defeats devices used to trigger improvised explosive devices (IEDs). Northrop Grumman developed mounted, dismounted and fixed-site variants...
 
 

Radar delivery boosts United States’ ballistic missile protection

The U.S. just gained another defensive system that will help protect the U.S. and its allies from ballistic missiles. Raytheon delivered its tenth AN/TPY-2 ballistic missile defense radar to the Missile Defense Agency six months ahead of schedule. AN/TPY-2 is an integral element of the Ballistic Missile Defense System.  It is a mobile X-band radar...
 
 

Lockheed Martin pursuing compact nuclear fusion reactor concept

PALMDALE, Calif. – The Lockheed Martin Skunk Works® team is working on a new compact fusion reactor that can be developed and deployed in as little as ten years. Currently, there are several patents pending that cover their approach. While fusion itself is not new, the Skunk Works has built on more than 60 years...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>