Space

February 1, 2013

NASA, ATK complete second in series of key avionics, controls testing for NASA’s SLS booster

NASA and ATK completed the second in a series of development tests for NASA’s Space Launch System booster program Jan. 30 at ATK’s Promontory, Utah, test facility.

This key avionics and controls test was designated Flight Control Test 2 (FCT-2) and included a “hot fire” of the fully integrated heritage thrust vector control, the new SLS booster avionics subsystem and new electronic support equipment.

FCT-2 focused on replacement of heritage test equipment with new ESE. Much of the equipment replaced was designed and built during the mid- to late-1970s and was successfully used on all Space Shuttle Reusable Solid Rocket Motor and five segment RSRM static motor firings.

“The FCT-2 test marked a definite milestone for ATK and NASA’s SLS program,” said Fred Brasfield, ATK’s vice president, Next-Generation Booster. “Working with Marshall, we have designed and developed a modern system and common interface that allows for multiple uses of the same equipment at all necessary locations for both qualification and operational phases of the program, greatly reducing complexity and costs.”

As with the avionics subsystem, affordability was designed in from the onset of developing new ESE. The same ESE design utilized to support static tests will also be used to support certification testing of the avionics subsystem in Utah and at NASA’s Marshall Space Flight Center, and ultimately for acceptance check-out of flight hardware at Kennedy Space Center.

ATK developed the avionics subsystem at facilities in Clearfield and Magna, Utah, with support from NASA Marshall Space Flight Center in Alabama. Key partners supporting ATK throughout this test series include L-3 Cincinnati Electronics in Mason, Ohio, and Southern California Braiding, an IEC Electronics Company in Bell Gardens, California. Cincinnati Electronics provides the avionics boxes, and Southern California Braiding is responsible for the cable harnesses. Both Cincinnati Electronics and Southern California Braiding have been integral to ATK throughout the development lifecycle of the SLS booster.

“Our suppliers have been vital to the success of this program,” said Brasfield. “They will remain key contributors through the SLS flight test program.”

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 18, 2014

Business: Lockheed to Lose 17 F-35s Under Automatic Pentagon Cuts - Pentagon will cut 17 of the 343 F-35 fighters it planned to buy from Lockheed Martin in fiscal 2016 through 2019 unless Congress repeals automatic budget cuts, according to a new Defense Department report. DOD looking for ways not to break MH-60R helo deal - The...
 
 

News Briefs April 18, 2013

U.S. military deaths in Afghanistan at 2,177 As of April 15, 2014, at least 2,177 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,802 military service members have died in Afghanistan as a result...
 
 
LM-F35-hours

F-35 fleet surpasses 15,000 flying hours

The Lockheed Martin F-35 Lightning II fleet recently surpassed 15,000 flight hours, marking a major milestone for the program.  “Flying 15,000 hours itself demonstrates that the program is maturing, but what I think is e...
 

 
nasa-cassini

NASA Cassini images may reveal birth of new Saturn moon

NASA’s Cassini spacecraft has documented the formation of a small icy object within the rings of Saturn that may be a new moon, and may also provide clues to the formation of the planet’s known moons. Images taken w...
 
 

NASA completes LADEE mission with planned impact on Moon’s surface

Ground controllers at NASA’s Ames Research Center in Moffett Field, Calif., have confirmed that NASA’s Lunar Atmosphere and Dust Environment Explorer spacecraft impacted the surface of the moon, as planned, between 9:30 and 10:22 p.m., PDT, April 17. LADEE lacked fuel to maintain a long-term lunar orbit or continue science operations and was intentionally sent...
 
 
Photograph courtesy of NASA Ames/SETI Institute/JPL-Caltech

NASA’s Kepler telescope discovers first Earth-size planet in ‘habitable zone’

Photograph courtesy of NASA Ames/SETI Institute/JPL-Caltech Kepler-186f resides in the Kepler-186 system about 500 light-years from Earth in the constellation Cygnus. The system is also home to four inner planets, seen lined up...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>