Space

February 1, 2013

NASA increases value of bioastronautics contract

NASA has increased the value of a contract with Wyle Integrated Science and Engineering Group of Houston to provide continuing support to the Human Health and Performance Directorate at NASA’s Johnson Space Center in Houston.

The modification increases the not-to-exceed indefinite-delivery, indefinite-quantity value of the contract by $49 million, from $914.5 million to $963.5 million. This value is just a portion of the contract. The overall value of the contract with this change is $1.2 billion. Wyle has held the cost-plus-award-fee contract since May 1, 2003. The contract ends April 30. A follow-on competition, known as the Health and Human Performance Contract, is under way.

Services provided under the current contract support the International Space Station and Orion programs. Work includes medical services, research, technology development, engineering, operations and flight hardware development to support the health, safety and productivity of crews living and working in space. Wyle maintains readiness of facilities and laboratories and provides services for program integration, habitability and environmental factors, human adaptation and countermeasures, space medicine, flight hardware development and human research.

Work under the contract is performed at Johnson and Ellington Field in Houston, as well as NASA’s White Sands Test Facility in Las Cruces, N.M.

Major subcontractors include Lockheed Martin Space Operations, Barrios Technology Inc., Enterprise Advisory Services Inc., Bastion Technologies and Muniz Engineering Inc., all in Houston, and Futron Corporation in Bethesda, Md.

 




All of this week's top headlines to your email every Friday.


 
 

 
ATK

ATK completes installation of world’s largest solid rocket motor for ground test

ATK The first qualification motor for NASA’s Space Launch Systems booster is installed in ATK’s test stand in Utah – ready for a March 11 static-fire test. NASA and ATK have completed installing the first Spac...
 
 
ULA photograph

Third Lockheed Martin-built MUOS satellite launched, responding to commands

ULA photograph The U.S. Air Force’s 45th Space Wing successfully launched the third Mobile User Objective System satellite, built by Lockheed Martin, for the U.S. Navy at 8:04 p.m. Jan. 20, 2015, from Launch Complex 41 at...
 
 
ULA photograph

ULA successfully launches Navy’s Mobile User Objective System-3

ULA photograph The U.S. Air Force’s 45th Space Wing successfully launched the third Mobile User Objective System (MUOS) satellite, built by Lockheed Martin, for the U.S. Navy at 8:04 p.m. Jan. 20, 2015, from Launch Comple...
 

 

Aerojet Rocketdyne Propulsion supports launch, flight of third MUOS satellite

Aerojet Rocketdyne played a critical role in successfully placing the third of five planned Mobile User Objective System (MUOS-3) satellites, designed and built by Lockheed Martin, into orbit for the U.S. Navy. The mission was launched from Cape Canaveral Air Force Station in Florida aboard a United Launch Alliance Atlas V rocket, with five Aerojet...
 
 
LM-MUOS-satellite

U.S. Navy poised to Launch Lockheed Martin-built MUOS-3 satellite

The U.S. Navy and Lockheed Martin are ready to launch the third Mobile User Objective System satellite, MUOS-3, from Cape Canaveral Air Force Station, Fla., Jan. 20 aboard a United Launch Alliance Atlas V rocket. The launch win...
 
 

NASA, NOAA find 2014 warmest year in modern record

https://www.youtube.com/embed/-ilg75uJZZU?enablejsapi=1&rel=0 The year 2014 ranks as Earth’s warmest since 1880, according to two separate analyses by NASA and National Oceanic and Atmospheric Administration scientists. The 10 warmest years in the instrumental record, with the exception of 1998, have now occurred since 2000. This trend continues a long-term warming of the planet, acc...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>