Defense

February 6, 2013

Air Force increases projected KC-46 flying hours, crew ratio

The Air Force has increased planned life-cycle flying hours and aircrews assigned to the new KC-46A refueling tanker to make optimal use of the commercially-proven aircraft’s fuel efficiency, cargo and aeromedical evacuation capabilities.

Compared to the Eisenhower-era KC-135 Stratotanker, the KC-46 is projected to have improved fuel efficiency, a greater fuel capacity, and much more cargo, passenger and aero-medical capability, said Maj. Gen. John Thompson, the Tanker Program executive officer and KC-46 program director.

The new aircraft is a derivative of the Boeing 767 and commercial-derivatives are typically more dependable and less expensive to maintain than military-only aircraft.

Air Force leaders re-evaluated previous usage estimates, based on KC-135 averages, and decided these changes were appropriate to better utilize the full potential of the KC-46.

They decided an increase of 2.5 to 3.5 aircrews assigned per KC-46 was necessary to facilitate surge capabilities and to meet contingency operations requirements per the 2012 Defense Strategy. Overall, the increase will add approximately 60 total aircrews to the force and allow the Air Force to fly more missions using the KC-46.

Decisions also include the basing strategy of the KC-46 with an increased focus on “total force associations.” Basically, active-duty and reserve units will share aircraft allowing the KC-46 utilization rates to be much higher than current KC-135 rates.

Air Force leaders informed Congress of the increased flying hours due to the basing strategy and concept of operations changes along with the anticipated 11.2 percent future cost growth in the estimated operations and support costs due to increased usage.

The KC-46A is the service’s first step to replace its aging air refueling fleet. It will provide enhanced refueling capability and increased cargo and aero-medical evacuation capacity. The first 18 aircraft are slated to be delivered by August 2017.

The total operations and support costs are now predicted to be approximately $103 billion, but there is no increase in acquisition cost. Leaders stress the increase to operations and support is because this aircraft will be used more often and more effectively than current aircraft – not because it’s more expensive to operate.

“It’s completely a result of the basing and (concept of operations) changes and is in no way reflecting increased costs to operate the aircraft. We’re just flying it more,” Thompson said .

The Air Force is not planning to increase its budget, he said. “The increased KC-46 costs will be repurposed out of manpower and resources that were meant for the KC-135 (Stratotanker).”

 




All of this week's top headlines to your email every Friday.


 
 

 
Navy photograph

Triton UAS conducts first flight with search radar

Navy photograph The MQ-4C Triton unmanned aircraft takes off from Naval Air Station Patuxent River, Md., April 16, to conduct its first flight from the naval base. The aircraft began sensor testing on April 18 and flew with its...
 
 
Army photograph

Innovative technology destroys old munitions

Army photograph The Explosive Destruction System is a safe and effective means of destroying chemical munitions. The blast, vapor and fragments are all contained inside the stainless steel chamber. Army officials have brought a...
 
 

Navy names littoral combat ship

Secretary of the Navy Ray Mabus announced April 17 that the next Freedom-variant littoral combat ship (LCS) will be named USS St. Louis. The future USS St. Louis, designated LCS 19, will be the seventh ship to bear the name. The first St. Louis, a sloop of war, was launched in 1828. It spent the...
 

 
Luke Lightning strikes at Nellis

F-35 program on right track, director says

Luke Lightning strikes at Nellis Air Force photograph by Senior Airman Thomas Spangler An F-35A Lightning II assigned to the 61st Fighter Squadron, Luke Air Force Base, Ariz., taxis to the runway for a training exercise at Nell...
 
 
Army photograph

Army plans intelligence system to be lighter weight, easier to use

Army photograph During a media day, a soldier, with the Army’s intelligence community, demonstrates use of a portion of the Distributed Common Ground System – Army system on Fort Belvoir, Va., May 16, 2013. Future v...
 
 
Navy photograph

Closing the curtain on NAVAIR’s desert depot

An MV-22 gets ready for takeoff following repair at NAVAIR’s Forward Deployed Combat Repair facility in Afghanistan. The FDCR mission ended in June 2014, and was primarily led by NAVAIR reservists with artisans from Fleet...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>