Business

February 11, 2013

Lockheed Martin completes assembly, begins environmental testing of NASA’s MAVEN spacecraft

NASA’s MAVEN spacecraft recently completed assembly and has started environmental testing. In the Multipurpose Test Facility clean room at Lockheed Martin, technicians installed the orbiter’s two solar arrays prior to a modal test.

Lockheed Martin has completed the assembly of NASA’s Mars Atmosphere and Volatile Evolution spacecraft.

The orbiter is now undergoing environmental testing at the company’s Space Systems facilities, near Denver, Colo. MAVEN is the next mission to Mars and will be the first mission devoted to understanding the Martian upper atmosphere.

During the environmental testing phase, the orbiter will undergo a variety of rigorous tests that simulate the extreme temperatures, vacuum and vibration the spacecraft will experience during the course of its mission. Currently, the spacecraft is in the company’s Reverberant Acoustic Laboratory being prepared to undergo acoustics testing that simulates the maximum sound and vibration levels the spacecraft will experience during launch.

Following the acoustics test, MAVEN will be subjected to a barrage of additional tests, including: separation/deployment shock, sine vibration, electromagnetic interference/electromagnetic compatibility (EMI/EMC), and magnetics testing. The phase concludes with a thermal vacuum test where the spacecraft and its instruments are exposed to the vacuum and extreme hot and cold temperatures it will face in space.

“The assembly and integration of MAVEN has gone very smoothly and we’re excited to test our work over the next six months,” said Guy Beutelschies, MAVEN program manager at Lockheed Martin Space Systems Company. “Environmental testing is a crucial set of activities designed to ensure the spacecraft can operate in the extreme conditions of space.”

“I’m very pleased with how our team has designed and built the spacecraft and science instruments that will make our measurements,” said Bruce Jakosky, MAVEN principal investigator from the University of Colorado at Boulder’s Laboratory for Atmospheric and Space Physics. “We’ve got an exciting science mission planned, and the environmental testing now is what will ensure that we are ready for launch and for the mission.”

MAVEN is scheduled to ship from Lockheed Martin’s facility to NASA’s Kennedy Space Center in early August where it will undergo final preparations for launch.

Scheduled to launch in November 2013, MAVEN is a robotic exploration mission to understand the role that loss of atmospheric gas to space played in changing the Martian climate through time. It will investigate how much of the Martian atmosphere has been lost over time by measuring the current rate of escape to space and gathering enough information about the relevant processes to allow extrapolate backward in time.

“This phase of the program is particularly important in that it will provide us with a good assessment of the MAVEN system’s capabilities under the simulated extremes of the space environment,” said David Mitchell, MAVEN project manager at NASA’s Goddard Space Flight Center in Greenbelt, Md. “Of significance, the spacecraft is entering system level test right on schedule, while maintaining robust cost and schedule reserves to deal with the technical or programmatic surprises that could occur during test or in the run to launch. Tracking on plan is critically important to being ready for launch later this year and the science that MAVEN will deliver one year later.”

MAVEN’s principal investigator is based at the University of Colorado at Boulder’s Laboratory for Atmospheric and Space Physics. The university will provide science operations, science instruments and lead Education/Public Outreach. NASA’s Goddard Space Flight Center manages the project and provides two of the science instruments for the mission. Lockheed Martin of Littleton, Colo., built the spacecraft and is responsible for mission operations. The University of California at Berkeley Space Sciences Laboratory provides science instruments for the mission. NASA’s Jet Propulsion Laboratory, Pasadena, Calif., provides navigation support, the Deep Space Network and the Electra telecommunications relay hardware and operations.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines January 23, 2015

News: Two Marines identified in deadly California helo crash - Two Marine Corps officers killed when their helicopter crashed during a training exercise in the Southern California desert were remembered Jan. 25 as talented pilots. Greek F-16 crashes in Spain during NATO exercise - Ten people died Jan. 26 after a Greek air force F-16 jet crashed...
 
 

News Briefs January 26, 2015

Navy wants to increase use of sonar-emitting buoys The U.S. Navy is seeking permits to expand sonar and other training exercises off the Pacific Coast, a proposal raising concerns from animal advocates who say that more sonar-emitting buoys would harm whales. The Navy now wants to deploy up to 720 sonobuoys about 12 miles off...
 
 
Air National Guard photograph by SSgt. Annie Edwards

ANG conducts air refueling training with NATO allies in Germany

Air National Guard photograph by SSgt. Annie Edwards A NATO E-3A AWACS aircraft approaches a Utah Air National Guard KC-135R Stratotanker for air refueling during a training flight over Germany on Jan. 13, 2015. Nearly 30 airme...
 

 
Air Force photograph by SrA. Armando A. Schwier-Morales

Ramstein Airmen train with French air force

Air Force photograph by SrA. Armando A. Schwier-Morales Two U.S. Air Force pilots and a French air force navigator discuss the route to the drop zone during a simulated low-level drop Jan. 21, 2015, at Orleans – Bricy Air...
 
 

Marines receive first F-35C Lightning II carrier variant

The first F-35C Lightning II, carrier variant, for the U.S. Marine Corps touched-down on the flight line at Eglin Air Force Base, Fla., Jan. 13, from the Lockheed Martin plant in Fort Worth, Texas, to begin training in support of carrier-based operations. U.S. Marine Lt. Col. J.T. Ryan, Marine Fighter Attack Squadron 501 detachment commander...
 
 

VA announces single regional framework under MyVA initiative

The Department of Veterans Affairs announced Jan. 26 that it is taking the first steps under the MyVA initiative to realign its many organizational maps into one map with five regions to better serve Veterans. The new regions under the MyVA alignment will allow VA to begin the process of integrating disparate organizational boundaries into...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>