Business

February 15, 2013

Northrop Grumman to begin next phase of modernizing B-2 defensive systems

PALMDALE, Calif. – Northrop Grumman will help drive down costs and speed the availability of new hardware and software upgrades for the B-2 stealth bomber under a recently awarded contract from the U.S. Air Force.

The contract covers Technology Development Phase 2 of a multiyear effort by Northrop Grumman to modernize the B-2’s defensive management system. TD Phase 2 is expected to last approximately three years.

DMS is an electronic warfare system that includes various antennas and display processors. Northrop Grumman is the Air Force’s prime contractor for the B-2, the flagship of the nation’s long-range strike arsenal.

“TD Phase 2 is the cornerstone of a rapid acquisition initiative that Northrop Grumman and the government developed to reduce B-2 DMS modernization costs and accelerate the availability of the latest technologies for the aircraft,” said Lauren Stevens, director of the company’s B-2 DMS modernization integrated product team. “Instead of relying on new hardware and software development, our initiative takes advantage of mature, proven technologies. It minimizes nonrecurring costs, and reduces the time and technology risks associated with fielding new capabilities.”

DMS modernization includes a new avionics graphics processor being developed by Lockheed Martin Mission Systems and Training, Owego, N.Y.; and new antennas, which are being developed by L3 Randtron, Menlo, Park, Calif., and Ball Aerospace, Boulder, Colo.

Northrop Grumman serves as the B-2 system integrator and developer of the architecture that determines how the aircraft responds to threat environments. In this role, the company will integrate all new DMS hardware and requisite software onto the jet.

“The DMS upgrades demonstrate how Northrop Grumman is using innovation and thoughtful engineering to address and fulfill key affordability goals of the Department of Defense,” explained Ron Naylor, director of B-2 Modernization and Transformation for Northrop Grumman Aerospace Systems. “They also help ensure that the B-2 will remain the nation’s most survivable and most effective long-range strike system for dealing with sophisticated enemy threats.”

TD Phase 2 of the DMS modernization program will include continued development and testing of the hardware and software for the new systems; evaluation, down-select and awarding of the contract for the new DMS antennas; and preparation by Northrop Grumman and its suppliers for the next phase of DMS modernization, known as engineering, manufacturing and development (EMD).

As part of its plan to reduce costs and fielding schedules, Northrop Grumman accelerated forward into TD Phase 2 many significant engineering tasks normally conducted during EMD. EMD is expected to begin in late 2014.

The B-2 is the only long-range, large-payload U.S. aircraft that can penetrate deeply into access-denied airspace. In concert with the Air Force’s air superiority fleet, which provides airspace control, and the Air Force’s tanker fleet, which enables global mobility, the B-2 can help protect U.S. interests anywhere in the world. It can fly more than 6,000 nautical miles unrefueled and more than 10,000 nautical miles with just one aerial refueling, giving it the ability to reach any point on the globe within hours.

 




All of this week's top headlines to your email every Friday.


 
 

 
NG-growler2

Northrop Grumman delivers center/aft ‘shipset’ for first international EA-18G Growler

Northrop Grumman photograph Northrop Grumman mechanics perform final quality inspections on the center/aft fuselage shipset produced by the company for the first Australian EA-18G Growler. The subassembly will be delivered to B...
 
 

Boeing, ANA finalize order for three 787-10 Dreamliners

Boeing and All Nippon Airways (ANA) today finalized an order for three 787-10 Dreamliners, valued at approximately $900 million at list prices. With this order, originally announced as a commitment in January 2015, ANA becomes Boeing’s newest 787-10 customer and first airline in Asia to operate the entire family of 787 Dreamliners. “We truly appreciate...
 
 

Poland’s MESKO, Raytheon sign second letter of intent

In a move designed to collaborate and share advanced defense technologies, Raytheon’s Missile Systems business signed a Letter of Intent with MESKO, Poland’s leading missile and ammunition manufacturer. Areas of cooperation focus on Raytheon’s solutions for the KRAB howitzer precision fires and new Polish Attack Helicopter, including offset proposals and opportunities for MESK...
 

 

Airbus Group delivers first new UH-72A Lakota for Army initial-entry trainer mission

Airbus Group March 25 delivered to the U.S. Army the first UH-72A Lakota helicopter to come off the Airbus Helicopters Inc. production line configured for the Lakota’s latest mission, as the service’s initial-entry training helicopter. The aircraft will join seven Lakotas previously in the Army inventory that have already been modified to the training configuration...
 
 
Courtesy photograph

Lockheed Martin acquires high-speed wind tunnel, plans upgrades

Courtesy photograph A RATTLRS cruise-missile inlet undergoes testing at the High Speed Wind Tunnel at Lockheed Martin Missiles and Fire Control in Grand Prairie. Lockheed Martin recently purchased the facility and plans numerou...
 
 
Lockheed Martin photograph by Andrew McMurtrie

Off they go: Three more C-130Js delivered

Lockheed Martin photograph by Andrew McMurtrie March 19, a U.S. Air Force crew took delivery of and ferried an MC-130J Commando II Special Operations tanker aircraft that is assigned to Air Force Special Operations Command’s ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>