Defense

March 15, 2013

Fly-By-Wire F-15SA makes first flight

An F-15SA makes its first flight over St. Louis on Feb. 20, 2013. The advanced fighter features a Fly-By-Wire flight control system and is being built by Boeing for the Royal Saudi Air Force. The Air Force Life Cycle Management Center at Wright-Patterson Air Force Base, Ohio, oversees program management for the foreign military sale, the largest in U.S. history.

The U.S. Air Force and its prime contractor Boeing have completed a successful first flight of the new F-15SA advanced fighter aircraft for the Royal Saudi Air Force.

The F-15SA’s maiden voyage took place on Feb. 20, 2013, at the Boeing facilities in St. Louis, Mo. The flight went as planned, meeting all test objectives to support the aircraft’s on-schedule development.

“The successful first flight of the F-15SA is a tremendous milestone for the program and a testament to the relationship between the USAF, Boeing, and our RSAF partners,” said Lt. Gen. C. D. Moore II, commander of the Air Force Life Cycle Management Center at Wright-Patterson Air Force Base. “The F-15SA will add critical capability to the RSAF and enhance the security of the Kingdom of Saudi Arabia.”

The new aircraft is the centerpiece of the Royal Saudi Air Force F-15 Fleet Modernization Program, a wide-ranging $29.4 billion effort that stands as the largest foreign military sale in U.S. history.

The F-15SA brings improved performance, enhanced situational awareness and increased survivability at a lower total life-cycle cost. Avionics advancements include a Digital Electronic Warfare Suite, Fly-By-Wire flight control system, an Infrared Search and Track system and Active Electronically Scanned Array radar. Forward and aft cockpits feature advanced displays and Joint Helmet Mounted Cueing Systems. Two additional weapon stations provide increased payload capacity.

Col. Robert Stambaugh, the USAF Security Assistance Program Manager for the F-15SA program at Robins AFB, Ga., highlighted the joint efforts of the USAF program office at Wright-Patterson AFB and the Boeing team.

“Col. Rob Strasser and his program team at Wright-Patt were instrumental in overcoming the hurdles encountered in the march to first flight. Completing this major milestone in less than one year after program implementation was truly remarkable.”

The F-15SA flight test program will include three instrumented F-15SAs operating from Boeing facilities at St. Louis and Palmdale, Calif. F-15SA new aircraft deliveries to the Kingdom of Saudi Arabia are scheduled to begin in 2015 and conclude by 2019.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 1, 2014

News: Military downsizing leaves U.S. too weak to counter global threats, panel finds - An independent panel appointed by the Pentagon and Congress said July 31 that President Obama’s strategy for sizing the armed services is too weak for today’s global threats. Defense industry funds flow to contenders for key House chairmanships - Four of the top...
 
 

News Briefs August 1, 2014

China allows foreign reporters at news conference Foreign reporters are being allowed to attend China’s Defense Ministry briefings for the first time, marking a small milestone in the increasingly confident Chinese military’s efforts to project a more transparent image. Restrictions still apply and there is no sign of an improvement in the generally paltry amount...
 
 
Army photograph by John Andrew Hamilton

Rapid Equipping Force, PEO Soldier test targeting device at White Sands Missile Range

Army photograph by John Andrew Hamilton SFC Justin Rotti, a combat developer from the Training and Doctrine Command Fire Cell, Fires Center of Excellence, uses a developmental hand held precision targeting device during a test ...
 

 

NASA awards modification for geophysics, geodynamics, space geodesy support contract

NASA has awarded a modification to Stinger Ghaffarian Technologies Inc. of Greenbelt, Md. to continuing working the the Geophysics, Geodynamics and Space Geodesy Support Services contract. The maximum ordering value of the GGSG contract will increase to $76.8 million. The previous amount was $49.5 million. The increase in the maximum ordering value of the contract...
 
 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>