Defense

March 15, 2013

JHSV 2 successfully completes builder’s trials

Joint High Speed Vessel (JHSV) 2, the future USNS Choctaw County, conducted builder’s sea trials March 7-8, in Mobile, Ala.

The ship, now under construction at Austal USA, is the second ship of the JHSV class.

Builder’s trials are a significant step in the construction and delivery of a ship to the fleet and are the first opportunity to operate the ship underway and test overall system performance prior to demonstration to the Navy’s Board of Inspection and Survey.

“JHSV 2 is the second ship in this class to go through rigorous builder’s trials testing,” said Strategic and Theater Sealift Program Manager Capt. Henry Stevens. “At this stage, JHSV 2 is more complete than the lead ship, and we are benefitting from JHSV 1′s lessons learned. This was the first step in preparing the ship for acceptance trials and delivery later this year.”

Trials included operating the ship’s propulsion plant for many hours at different power levels, up to full power; testing and calibration of communication and navigational systems; ride control systems testing; and pollution control systems tests. Maneuverability trials tested the ship’s four steerable water jets while a series of high-speed turns demonstrated the stability and agility of JHSV’s catamaran hull form. The ship reached speeds of more than 41 knots.

Next, Austal will complete any required corrective actions required in preparation for acceptance trials, planned in the coming weeks. Choctaw County is expected to deliver to the Navy this summer. JHSVs are versatile, non-combatant, transport ships used for fast intra-theater transportation of troops, military vehicles, and equipment.

JHSV is designed to commercial standards, with limited modifications for military use. The vessel is capable of transporting 600 short tons 1,200 nautical miles at an average speed of 35 knots and can operate in shallow-draft ports and waterways, interfacing with roll-on/roll-off discharge facilities, and on/off-loading a combat-loaded Abrams Main Battle Tank (M1A2).

Other joint requirements include an aviation flight deck to support day and night aircraft launch and recovery operations. JHSV 2 will have airline style seating for 312 embarked forces with fixed berthing for 104.

As one of the Defense Department’s largest acquisition organizations, PEO Ships is responsible for executing the development and procurement of all destroyers, amphibious ships, special mission and support ships, and special warfare craft. Delivering high-quality war fighting assets while balancing affordability and capability is key to supporting the Navy’s Maritime Strategy.

 




All of this week's top headlines to your email every Friday.


 
 

 

Dragon ‘fires up’ for flight

The Air Force and NATO are undergoing a cooperative development effort to upgrade the avionics and cockpit displays of AWACS aircraft belonging to the 552nd Air Control Wing at Tinker Air Force Base, Okla., and the NATO E-3 Sentrys from Geilenkirchen, Germany. The Diminishing Manufacturing Sources Replacement of Avionics for Global Operations and Navigation, otherwise...
 
 

AF to release small business research solicitations

The Air Force Small Business Innovation Research and Small Business Technology Transfer program office is set to release its fiscal year 2015 list of topics Oct. 22, on the SBIR/STTR website.  Small businesses and research institutions with expertise to address the topics’ technology challenges are encouraged to submit proposals. During 2014, the Defense Department SBIR...
 
 
Navy photograph by POC Sam Shavers

Navy christens, launches future USS Detroit

Navy photograph by POC Sam Shavers Ship’s sponsor Barbara Levin breaks a bottle of champagne across the bow during the christening ceremony for the littoral combat ship Pre-Commissioning Unit (PCU) Detroit (LCS 7) at Mari...
 

 
Army photograph by David Vergun

Shyu: Army modernization entering ‘death spiral’

Army photograph by David Vergun Heidi Shyu, assistant secretary of the Army for Acquisition, Logistics and Technology, visits industry reps at the annual meeting of the Association of the United States Army after speaking on a ...
 
 
Navy photograph

U.S. Navy’s E-2D Advanced Hawkeye aircraft achieves IO

Navy photograph The U.S. Navy announced that the E-2D Advanced Hawkeye achieved Initial Operational Capability Oct. 10. IOC signifies that the first operational squadron, Carrier Airborne Early Warning Squadron (VAW) 125, is ma...
 
 
Navy photograph by PO2 Tim D. Godbee

USS Coronado conducts dynamic interface testing with Fire Scout

Navy photograph by PO2 Tim D. Godbee An MQ-8B Fire Scout unmanned helicopter assigned to Helicopter Maritime Strike Squadron (HSM) 35 prepares to land on the littoral combat ship USS Freedom (LCS 1) during visit, board, search ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>