Defense

March 15, 2013

JHSV 2 successfully completes builder’s trials

Joint High Speed Vessel (JHSV) 2, the future USNS Choctaw County, conducted builder’s sea trials March 7-8, in Mobile, Ala.

The ship, now under construction at Austal USA, is the second ship of the JHSV class.

Builder’s trials are a significant step in the construction and delivery of a ship to the fleet and are the first opportunity to operate the ship underway and test overall system performance prior to demonstration to the Navy’s Board of Inspection and Survey.

“JHSV 2 is the second ship in this class to go through rigorous builder’s trials testing,” said Strategic and Theater Sealift Program Manager Capt. Henry Stevens. “At this stage, JHSV 2 is more complete than the lead ship, and we are benefitting from JHSV 1′s lessons learned. This was the first step in preparing the ship for acceptance trials and delivery later this year.”

Trials included operating the ship’s propulsion plant for many hours at different power levels, up to full power; testing and calibration of communication and navigational systems; ride control systems testing; and pollution control systems tests. Maneuverability trials tested the ship’s four steerable water jets while a series of high-speed turns demonstrated the stability and agility of JHSV’s catamaran hull form. The ship reached speeds of more than 41 knots.

Next, Austal will complete any required corrective actions required in preparation for acceptance trials, planned in the coming weeks. Choctaw County is expected to deliver to the Navy this summer. JHSVs are versatile, non-combatant, transport ships used for fast intra-theater transportation of troops, military vehicles, and equipment.

JHSV is designed to commercial standards, with limited modifications for military use. The vessel is capable of transporting 600 short tons 1,200 nautical miles at an average speed of 35 knots and can operate in shallow-draft ports and waterways, interfacing with roll-on/roll-off discharge facilities, and on/off-loading a combat-loaded Abrams Main Battle Tank (M1A2).

Other joint requirements include an aviation flight deck to support day and night aircraft launch and recovery operations. JHSV 2 will have airline style seating for 312 embarked forces with fixed berthing for 104.

As one of the Defense Department’s largest acquisition organizations, PEO Ships is responsible for executing the development and procurement of all destroyers, amphibious ships, special mission and support ships, and special warfare craft. Delivering high-quality war fighting assets while balancing affordability and capability is key to supporting the Navy’s Maritime Strategy.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 23, 2014

News: Israel’s Iron Dome defense in line for tripled U.S. spending - Israel’s iron Dome missile defense system may end up getting triple the U.S. funding that the Defense Department sought for it in March. Ukraine asked U.S. for systems to counter Russian missiles - A month before the United States says a Russian missile likely brought...
 
 

News Briefs July 23, 2014

U.S. military deaths in Afghanistan at 2,194 As of July 22, 2014, at least 2,194 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. The AP count is three less than the Defense Department’s tally. At least...
 
 
Raytheon photograph

Raytheon completes key Air, Missile Defense Radar reviews

Raytheon photograph Partially-populated, full-sized Air and Missile Defense Radar array. Raytheon has completed two critical program reviews for the new Air and Missile Defense Radar, the U.S. Navy’s next generation integ...
 

 
Insitu photograph

Insitu demonstrates long endurance capabilities of Integrator unmanned aircraft

Insitu photograph Insitu’s Integrator unmanned aircraft recovers via SkyHook; the aircraft recently completed a 24-hour endurance flight. Insitu announced July 22 the successful 24-hour flight of its Integrator unmanned a...
 
 

NASA partners punctuate summer with spacecraft development advances

Spacecraft and rocket development is on pace this summer for NASA’s aerospace industry partners for the agency’s Commercial Crew Program as they progress through systems testing, review boards and quarterly sessions under their† Space Act Agreements with the agency. NASA engineers and specialists continue their review of the progress as the agency and partners move...
 
 

U.S. Navy selects Northrop Grumman for ship self-defense system

The U.S. Navy has awarded Northrop Grumman a $12 million task order for a full range of engineering services to continue modernizing the Ship Self-Defense System Mark 2. The contract has a potential value of $61 million over five years, if all options are exercised. SSDS MK2 is a combat system designed for anti-air defense...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>