Defense

March 15, 2013

Navy completes EMALS shared generator testing

The Electromagnetic Aircraft Launch System (EMALS) motor generator stores energy in the inertia of its rotor and releases that energy upon initiation of the aircraft launch onboard carriers. EMALS completed shared generator testing at Joint Base McGuire-Dix-Lakehurst, N.J., March 14. EMALS is replacing the current steam catapult system on aircraft carriers, beginning with the Gerald R. Ford (CVN 78).

The Navy’s future carrier aircraft launch system concluded a unique test event March 14, earlier than planned.

The Aircraft Launch and Recovery Equipment Program Office (PMA-251)ís Electromagnetic Aircraft Launch System, completed shared generator testing at Joint Base McGuire-Dix-Lakehurst, N.J.

EMALS is replacing the current steam catapult system on aircraft carriers, beginning with the Gerald R. Ford (CVN 78).

It is important that we ensure proper sharing and operation of the generators at the land-based facility prior to testing the full four-catapult system onboard CVN 78, reducing risk to the ship,î said George Sulich, EMALS integrated team lead.

With EMALS, the aircraft is attached to a shuttle that is propelled down the length of the catapult track by an electromagnetic field produced by the linear motors. The motor generator stores the systemís energy in the inertia of its rotor and releases that energy upon initiation of the aircraft launch.

EMALS consists of six subsystems working together and sharing components to power the four catapults on the ship. The test site only has one catapult so, up to now; the system has only had to control one launcher.

After completing the system functional demonstration phase in November 2012, the EMALS team readied the site to replicate a four-catapult ship environment. The testing simulated generator-sharing for multiple catapults by launching dead-loads, or weighted sleds.

ìAs EMALS successfully completes another test phase, I am confident we are providing the fleet with a reliable and efficient system that will revolutionize the way we launch aircraft from the Navyís newest class of carriers,î said Capt. Jim Donnelly, PMA-251 program manager.

Sulich attributed the teamís ability to team start and finish formal shared testing earlier than planned, to good preparation and coordination.

One such preparation, he said, was using a ship representative controls lab, located at prime industry partner General Atomicsí facility in Rancho Bernardo, Calif., to conduct extensive modeling and simulation of the four-catapult system, ensuring the launch controls were set up correctly.

Instead of using the full-scale system at Lakehurst to test the full EMALS software suite, we used the ship-representative controls lab, Sulich said. ìBy using the lab before we started formal testing, we were able to groom the software so that during commissioning testing we werenít really discovering anything new.

EMALS is designed to expand the operational capability of the Navyís future carriers to include all current and future carrier air wing platforms lightweight unmanned to heavy strike fighters.

It delivers necessary higher launch energy capacity; substantial improvements in system maintenance; increased reliability and efficiency; and more accurate end-speed control. The systemís technologies allow for a smooth acceleration at both high and low speeds, increasing the carrierís ability to launch aircraft with less stress on the ship and its systems.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 24, 2015

News: More than $1 billion in U.S. emergency reconstruction aid goes missing in Afghanistan - A total of $1.3 billion that the Pentagon shipped to its force commanders in Afghanistan between 2004 and 2014 for the most critical reconstruction projects can’t be accounted for by the Defense Department, 60 percent of all such spending under an...
 
 

News Briefs April 24, 2015

German defense minister: widely used rifle has no future A widely used assault rifle has “no future” with the German military in its current form, Germany’s defense minister said April 22, escalating a dispute over the weapon’s alleged shortcomings. Ursula von der Leyen said last month that a study showed the G36 rifle has a...
 
 
Army photograph

Composites key to tougher, lighter armaments

Army photograph XM-360 test firing at Aberdeen Proving Ground, Md., in 2007, is shown. The Army is on the cusp of revolutionizing materials that go into armament construction, making for stronger, lighter and more durable weapo...
 

 

Northrop Grumman signs long-term agreement with Raytheon

Northrop Grumman has entered a long-term agreement with Raytheon to supply its LN-200 Inertial Measurement Unit for Raytheon optical targeting systems. The long-term agreement with Raytheon’s Space and Airborne Systems business extends through 2018. The LN-200 provides camera stabilization on optical targeting systems that conduct long-range surveillance and target acquisition for various...
 
 

NTTR supports first F-35B integration into USMC’s weapons school exercise

The Nevada Test and Training Range was part of history April 21, when four U.S. Marine Corps-assigned F-35B Lightning IIs participated in its first Marine Corps’ Final Exercise of the Weapons and Tactics Instructor course on the NTTR’s ranges. The Final Exercise, or FINEX, is the capstone event to the U.S. Marine Corps Marine Aviation...
 
 
AAR-Textron

AAR awarded new contract from Bell Helicopter Textron to support T64 engines

AAR announced April 22 that Bell Helicopter Textron Inc. awarded its Defense Systems & Logistics business unit a contract providing warehouse and logistics services in support of upgrading T64 engines for the Bell V-280 Val...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>