Space

March 18, 2013

Aerojet announces successful requalification of Its Delta II AJ10-118K second stage engine

Aerojet’s Delta II second stage engine, the AJ10-118K, successfully passed a requalification test of its ablative chamber at Aerojet’s J4 altitude simulation test facility in Sacramento.

Aerojet is a GenCorp company.

The intent of the requalification program was to replace the asbestos insulator material with a readily-available and environmentally-friendly alternative. The three-burn hot fire test simulated a “test-like-you-fly” duty cycle configuration, qualifying the new engine configuration for flight. The altitude test was preceded by a successful sea-level test in November 2012.

“The Delta II is one of the most robust and reliable rocket engines ever flown,” said Aerojet Vice President of Space and Launch Systems Julie Van Kleeck. “This test represents another successful milestone in a program with a rich history of successful milestones and 100 percent mission success.
Additionally, it verifies that the past design rigor put into this heritage technology meets and exceeds the scrutiny of modern day expectations for flight.”

Under contract to United Launch Alliance, Aerojet’s AJ10 has provided second-stage propulsion on 151 Delta II flights to date with a 100 percent success rate. The engine has helped deliver payloads for NASA’s space exploration efforts such as the Phoenix Mars Lander, Mars Polar Lander, Deep Impact, Kepler, NEAR Shoemaker and the Mars Exploration Rovers, Spirit and Opportunity, as well as the U.S. Air Force Global Positioning System Block IIR fleet.

The AJ10 second stage engine produces approximately 10,000 pounds of thrust for orbital insertion. There are currently four flights in the near-term manifest for Delta II, two in 2014 and two in 2016.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 1, 2014

News: Military downsizing leaves U.S. too weak to counter global threats, panel finds - An independent panel appointed by the Pentagon and Congress said July 31 that President Obama’s strategy for sizing the armed services is too weak for today’s global threats. Defense industry funds flow to contenders for key House chairmanships - Four of the top...
 
 

News Briefs August 1, 2014

China allows foreign reporters at news conference Foreign reporters are being allowed to attend China’s Defense Ministry briefings for the first time, marking a small milestone in the increasingly confident Chinese military’s efforts to project a more transparent image. Restrictions still apply and there is no sign of an improvement in the generally paltry amount...
 
 
Army photograph by John Andrew Hamilton

Rapid Equipping Force, PEO Soldier test targeting device at White Sands Missile Range

Army photograph by John Andrew Hamilton SFC Justin Rotti, a combat developer from the Training and Doctrine Command Fire Cell, Fires Center of Excellence, uses a developmental hand held precision targeting device during a test ...
 

 

NASA awards modification for geophysics, geodynamics, space geodesy support contract

NASA has awarded a modification to Stinger Ghaffarian Technologies Inc. of Greenbelt, Md. to continuing working the the Geophysics, Geodynamics and Space Geodesy Support Services contract. The maximum ordering value of the GGSG contract will increase to $76.8 million. The previous amount was $49.5 million. The increase in the maximum ordering value of the contract...
 
 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>