Defense

March 20, 2013

Joint STARS paves the way with MIDS JTRS fielding

A contract worker installs equipment for the Multifunctional Distribution Systems Joint Tactical Radio System terminal on a Joint STARS aircraft earlier this year in Melbourne, Fla. Joint STARS recently became the first airborne system to fully integrate these new terminals.

Joint STARS recently became the first Air Force airborne system to fully retrofit new terminals that will improve war fighter communication.

The Joint STARS Communications and Network Upgrade program successfully installed, tested and fielded the first of its Multifunctional Information Distribution System Joint Tactical Radio System, or MIDS JTRS, terminals.

“This was a huge success for Joint STARS because it became the first Air Force platform to be fully integrated with MIDS JTRS,” said 2nd Lt. Samantha Sarkis, Joint STARS CNU program manager. “We want to ensure Joint STARS will remain a vital asset in this high-demand environment and this will help us achieve that goal.”

MIDS JTRS replaces the Joint Tactical Information Distribution System Class Two Terminals currently operating on the rest of the Joint STARS fleet and provides secure data and voice communications between airborne, ground and seaborne platforms, enhancing communication and battle management capabilities. It also is compatible with a Link 16 network, which is the primary Tactical Data Link exchange for air-to-air and air-to-ground communications.

Link 16 provides military units and platforms with a secure data network for the exchange of near-real time tactical data, including text messages, imagery and digital voice. MIDS JTRS not only offers the Link 16 compatibility, but does so in a form factor that is half the size, half the weight and uses half the power consumption of the current class two terminals.

“These reductions are important, especially aboard an aircraft,” said Sarkis. “MIDS JTRS is twice as reliable as the current JTIDS Class 2 terminal with shorter mean-time-to-repair and reduced life-cycle cost.”

The first MIDS JTRS-equipped Joint STARS aircraft was delivered to the 116th and 461st Air Control Wing at Robins AFB, Ga., Feb 20.

“Fielding the first fully integrated Joint STARS MIDS JTRS-equipped aircraft represents the culmination of a cooperative effort between three separate program offices – the Joint STARS developmental program office, the Airborne Networks program office, also located at Hanscom, and the Navy Multifunctional Information Distribution System program office in San Diego,” said Sarkis.

According to program officials, the MIDS JTRS installation took place simultaneously with two other retrofit efforts, a Joint STARS first. While Northrop Grumman Aerospace Systems, the Joint STARS prime contractor, was installing the CNU equipment, they also installed an upgrade to blue force tracking tools and an Enhanced Land Maritime Mode capability. The ELMM substantially improves Joint STARS ground moving target indication accuracy and maritime tracking capabilities. The Hanscom Joint STARS office developed the CNU and ELMM capabilities, but the blue force tracking improvements were managed by the Robins AFB Joint STARS sustainment program.

“This tri-retrofit was ground-breaking for Air Force airborne systems,” said Sarkis, “It represented a carefully coordinated effort and cut nearly ten days off of the total installation time as compared to the time required to install the three upgrades separately. The end result is the most capable aircraft in the Joint STARS fleet.”

Northrop Grumman and the Joint STARS program office plan to complete the remaining 15 installations by March 2015.

“Due to diminishing manufacturing sources, our concern for the U.S. Air Force is on-time sustainment that keeps the Joint STARS aircrew work stations aligned with the best of the best capabilities,” said Sarkis.

She also highlighted the balance between aircraft readiness and equipment improvements.

“We are constantly trying to improve the warfighter’s ability to battle-manage ISR operations seamlessly through enhanced command and control platforms,” said Sarkis. “When you have a high demand/low density asset, aircraft availability becomes a top priority in the current environment we are in and world-wide locations the wing supports today.”

Teamwork helped everything to progress as quickly as it did. In addition to the CNU program representatives, support was provided by the contractor, the wing, the MIDS JTRS program office and vendors, the C3I and Networks Division Air Force JTRS office, the Defense Contract Management Agency and the sustainment program office.

“I’m really proud and thankful for everyone’s support, flexibility and collaboration in accelerating the installation schedule so as to provide the warfighter with more aircraft availability,” said Sarkis.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines January 28, 2015

News: Panel will propose new military retirement system - The long-awaited report on military compensation set to drop Thursday will propose fundamental changes to military retirement and health care benefits, according to several people familiar with the report. Source: DOD to request $585 billion for fiscal 2016 - The Department of Defense is preparing to submit a...
 
 

News Briefs January 28, 2015

Defense contractor to pay $2 million to settle claims A Northern California defense contractor will pay the federal government $2 million to settle claims about its manufacturing of parts for remote-controlled aircraft. The U.S. Attorney’s Office in Sacramento says Sacramento-based Composite Engineering Inc. agreed to pay the money to end allegations that it artificially inflated...
 
 
Navy photograph

USS Roosevelt marks 200,000 trap

Navy photograph An F/A-18F Super Hornet flown by Capt. Daniel Grieco, commanding officer of the aircraft carrier USS Theodore Roosevelt (CVN 71), and Capt. Benjamin Hewlett, deputy commander of Carrier Air Wing (CVW) 1, complet...
 

 
Navy photograph by PO1 William Larned

USS California returns from maiden deployment

Navy photograph by PO1 William Larned The Virginia-class attack submarine USS California (SSN 781) returns from its maiden deployment to its homeport at Naval Submarine Base New London. Under the command of Cmdr. Shawn Huey, Ca...
 
 
Army photograph

Army proves new watercraft capabilities

Army photograph Marine Corps assets are loaded onto the USNS Sgt. Matej Kocak (T-AK 3005), from an U.S. Army Landing Craft Utility, or LCU, USAV Port Hudson during port operations, at White Beach Naval Base, Jan. 22, 2015. Sold...
 
 

Orbital stockholders approve merger with ATK’s aerospace, defense groups

Orbital Sciences Corporation announced Jan. 27 that at a special meeting, the company’s stockholders voted overwhelmingly to approve the proposed merger with the Aerospace and Defense Groups of Alliant Techsystems Inc., pursuant to the definitive transaction agreement dated April 28, 2014. Approximately 99 percent of the votes cast at the special meeting voted in favor...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>