Defense

March 20, 2013

Unmanned air system takes first flight at sea

Tags:
PO3 Sabrina Fine
USS Mesa Verde

Members of the RQ-21A Small Tactical Unmanned Air System (STUAS) test team transport the RQ-21A across the flight deck of the amphibious transport dock USS Mesa Verde (LPD 19) after its first flight at sea. Mesa Verde is underway conducting exercises

San Antonio-class amphibious transport dock USS Mesa Verde (LPD 19) launched a RQ-21A Small Tactical Unmanned Air System recently, for its first flight at sea.

The STUAS completed four fly-bys around the ship before recovering with the STUAS Recovery System, a cable apparatus the aircraft latches to for recovery.

The STUAS completed three months of land-based trial flights aboard Naval Air Warfare Center in China Lake, Calif., before launching from a San Antonio-class amphibious landing dock ship.

“This is a significant event because the program is getting ready to achieve a major acquisition milestone,” said Gregory Oliver, Naval Air Systems Command (NAVAIR) lead test engineer. “This testing we are doing supports the ability to continue on with the development phase before a production phase.”

The RQ-21A Small Tactical Unmanned Air System (STUAS) is recovered with the flight recovery apparatus cable aboard the San Antonio-class amphibious transport dock USS Mesa Verde (LPD 19) after its first flight at sea. Mesa Verde is underway conducting exercises.

The Mesa Verde hosted members of the STUAS team from the company, Insitu, that built the aircraft and from NAVAIR during the sea trials.

“They helped us out, we helped them out, and we made a great team,” said Aviation Boatswain’s Mate (Handling) 3rd Class (SW) Travis Starr.

The successful launch required the ship’s crew and the STUAS team to coordinate with each other for launch and recovery.

“Some challenges were getting the air space we needed and making sure we could get proper wind conditions for launch and recovery,” said Oliver.

Other circumstances needed to be considered while flying at sea as opposed to on land.

“We learned a lot about its handling qualities and how it flies around the ship,” said Oliver.

The initial installation took months to plan and install.

“There was a lot of preparing that had to be done for ship integration,” said Lt. Cmdr. Kyle Matthew, STUAS detachment officer in charge, project officer, and U.S. naval test pilot. “The biggest parts were to install and integrate the Ground Control Station into the ship infrastructure, which included installing various antennas onto the ship’s deck and masts.”

The MKIV launcher prepares to launch the RQ-21A Small Tactical Unmanned Air System from the flight deck of the San Antonio-class amphibious transport dock USS Mesa Verde (LPD 19) for its first flight at sea. Mesa Verde is underway conducting exercises.

Next, the team had to find a secure and safe place for the launch and recovery system as well as train the crew how to move and emplace it, said Matthew.

“The launch and recovery equipment were never on a ship before, so we didn’t know if they were going to be able to make the angles up, the ramps and the turns,” said Starr.

The flight was a success and a learning experience for both the ship’s crew and NAVAIR.

“We learned what the aircraft and its support equipment can and cannot do, flying qualities during launch and recovery, system performance while aloft and how better to work with the ships crew,” said Matthew.

NAVAIR has a goal for STUAS flight first from large LPD ships, and then possibly smaller ships in the fleet.

“I see STUAS being operated by the capable hands of U.S. Navy Sailors and Marines,” said Matthew. “This system, when ready, will be a tremendous asset to the fleet and myself, and my test team are proud to be a part of that,” said Matthew.

Mesa Verde reached a historic milestone for the future of unmanned aircraft launching from ships in the Navy.

“[We are] very pleased to be working with Mesa Verde and want to thank the captain and crew for supporting us while we are out here,” said Oliver.

Mesa Verde is underway conducting exercises at sea.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 18, 2014

News: U.S. mission in Iraq could expand, Pentagon official says - The mission for U.S. troops in Iraq to help Kurdish and Iraqi security forces in their fight against Islamic militants remains limited for now, but may expand after Iraqi leaders form a new government, a Pentagon spokesman said Aug. 19.   Business: Fuel deals top...
 
 

News Briefs August 20, 2014

Trials complete on fourth Coast Guard cutter Ingalls Shipbuilding in Pascagoula, Miss., has completed acceptance sea trials for the company’s fourth U.S. Coast Guard national security cutter, Hamilton. Jim French, Ingalls’ NSC program manager, tells The Mississippi Press) the Hamilton is scheduled to be delivered next month and commissioned on Dec. 6 in Charleston, South...
 
 
Army photograph by Sgt. Thomas Duval

Air Force, Army Aviation come together to complete vital mission in Egypt

Army photograph by Sgt. Thomas Duval Soldiers and airmen load a UH-60 Black Hawk into an Air Force C17 Globemaster III Aug. 19, 2104, at an old Israeli airstrip in the Sinai Peninsula of Egypt. The airstrip is now used by the M...
 

 
Air Force photograph by TSgt. Terri Praden

Joint effort validates ability to move Stryker vehicles via air

Air Force photograph by TSgt. Terri Praden An Army Stryker combat vehicle is guided into a C-17 Globemaster III during a 25th Infantry Division training exercise Aug. 13, 2014, at Joint Base Pearl Harbor-Hickam, Hawaii. The Str...
 
 
NASA image

Ozone-depleting compound persists, NASA research shows

NASA image Satellites observed the largest ozone hole over Antarctica in 2006. Purple and blue represent areas of low ozone concentrations in the atmosphere; yellow and red are areas of higher concentrations. NASA research show...
 
 

F-16V completes major capability milestone

The newest configuration of the F-16 Fighting Falcon, the F-16V, has reached a major capability milestone with the integration of a new Active Electronically Scanned Array radar. Completing this milestone on schedule demonstrates our ability to meet program commitments, said Roderick McLean, vice president and general manager of the F-16/F-22 Integrated Fighter Group at Lockheed...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>