Business

April 5, 2013

Boeing opens new Everett, Wash., delivery center

Boeing April 3 opened its new expanded Everett Delivery Center, a world-class facility which will be the home of deliveries for the 747-8, 767, 777 and 787. The 180,000 square foot facility triples the amount of office, conference and delivery operations space as the old EDC and is designed to increase operational efficiencies.

Boeing opened its new expanded Everett Delivery Center, a world-class facility which will be the home of deliveries for the 747-8, 767, 777 and 787 April 3.

The grand opening ceremony was attended by Boeing employees, customers and state dignitaries.

“Boeing is producing market-leading commercial airplanes at its highest rates ever,” said Pat Shanahan, senior vice president and general manager, Airplane Programs, Boeing Commercial Airplanes. “The new facility enables us to meet growing demands and continue doing what our team does best ñ exceed customer expectations.”

The 180,000 sq. ft. facility triples the amount of office, conference and delivery operations space as the old EDC and is designed to increase operational efficiencies.

Boeing April 3 opened its new expanded Everett Delivery Center, a world-class facility which will be the home of deliveries for the 747-8, 767, 777 and 787.

“I want to congratulate The Boeing Company and its hard-working employees on the new Everett Delivery Center. This facility shows the strength of the aerospace industry in Washington and is a sign that the state’s long history with the company will continue to grow,” said Governor Jay Inslee. “As production rates increase and the company looks to roll out new airplane derivatives in Washington, it is clear this facility is going to see a lot of use.”

The building features three floors dedicated to customers and the delivery experience. Amenities include a customer lounge, a Tully’s cafe, over 20 conference rooms, four contract signing rooms and 35 offices to support resident customers and on-site delivery teams. The building’s highlight, a customer event area, offers sweeping views the Olympic Mountains beyond the neighboring flightline and Paine Field.

“Last year we delivered a record 183 airplanes and this new facility will help us continue to increase deliveries,” said Tom Maxwell, Everett Delivery Center vice president. “The expanded space will also allow us to keep pace with customer demands.”

Seattle-based DLR Group created the “Embrace the Plane” design which features a unique, curved architecture. The design allows airplanes to pull up to the building and connect by custom boarding bridges, enhancing ease of customer travel. Construction led by Skanska began in March 2012.




All of this week's top headlines to your email every Friday.


 
 

 

Missile Defense Agency, Raytheon demonstrate SM-6’s new anti-ballistic missile defense capability

In a first-of-its-kind test, the U.S. Navy fired a Raytheon Standard Missile-6, intercepting and destroying a short-range ballistic missile target at sea. The successful U.S. Missile Defense Agency test proved a modified SM-6 can eliminate threat ballistic missiles in their final seconds of flight. “SM-6 is the only missile in the world that can do...
 
 

Northrop Grumman-developed stealthy data link validated as combat ready with U.S. Marine Corps

the U.S. Marine Corps achieving F-35B initial operating capability, the Multifunction Advanced Data Link waveform developed by Northrop Grumman has been proven a key combat-ready capability of the F-35 Lightning II program. MADL is a high-data-rate, directional communications link that allows fifth-generation aircraft to communicate and coordinate tactics covertly. During testing of the Lockhee...
 
 

Lockheed Martin technology helps pilots, UAS operators share data, stay safe

As Unmanned Aircraft Systems take to the skies, it is essential for safety that UAS operators and pilots are aware of each other. To help provide this shared situational awareness, Lockheed Martin has deployed the first components of a UAS traffic management system that is available to the UAS community now. Lockheed Martin’s online Flight...
 

 

Aegis goes four-for-four in weeklong missile test series

The Lockheed Martin, U.S. Navy and Missile Defense Agency’s Aegis Combat System took part in a successful four-event test of the combat systemís air warfare and ballistic missile defense capabilities. The Multi-mission Warfare tests, conducted aboard USS John Paul Jones (DDG 53), began July 28 and ended Aug. 1. The latest iteration of the Aegis...
 
 
Lockheed Martin photograph

Lockheed Martin successfully tests design changes for Orion

A protective panel for Orion’s service module is jettisoned during testing at Lockheed Martin’s Sunnyvale, California facility. This test series evaluated design changes to the spacecraft’s fairing separation system Lockh...
 
 

Australian company to provide parts for initial production of Triton UAS

Northrop Grumman has awarded the first Australian supplier contract for the U.S. Navy’s MQ-4C Triton unmanned aircraft system initial production lot to Ferra Engineering. Brisbane-based Ferra Engineering will manufacture mechanical sub-assemblies for the first four Triton air vehicles including structural components. “At Northrop Grumman it’s very important to not only develop...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>