Space

April 8, 2013

NASA Commercial Crew partner Boeing completes launch vehicle adapter review

Boeing in Houston, a NASA Commercial Crew Program partner, has successfully completed a preliminary design review (PDR) of the component that would connect the company’s new crew capsule to its rocket.

The review is one of six performance milestones Boeing has completed for NASA’s Commercial Crew Integrated Capability (CCiCap) initiative, which is intended to make available commercial human spaceflight services for government and commercial customers. The company is on track to complete all 19 of its milestones during CCiCap.

Boeing is one of three U.S. companies NASA is working with during CCiCap to set the stage for a crewed orbital demonstration mission around the middle of the decade. Future development and certification initiatives eventually will lead to the availability of human spaceflight services for NASA to send its astronauts to the International Space Station.

The component that was reviewed is called the Launch Vehicle Adapter. The critical structure is being designed by United Launch Alliance to join Boeing’s Crew Space Transportation-100 (CST-100) spacecraft to ULA’s Atlas V rocket, just above the rocket’s second stage.

“Solid systems engineering integration is critical to the design of a safe system,” said Ed Mango, NASA’s CCP manager. “Boeing and all of NASA’s partner companies are working to build in proper systems integration into their designs. This review with Boeing and their partner ULA was a good review of the current state of these important design interfaces.”

In recent weeks, teams from NASA, Boeing and ULA met at ULA’s headquarters in Denver, Colo., to assess requirements and capabilities to safely launch people into low-Earth orbit from U.S. soil once again. The PDR was a culmination of early development and preliminary analysis to demonstrate the design is ready to proceed with detailed engineering.

“The PDR was an outstanding integrated effort by the Boeing, ULA and NASA teams,” said John Mulholland, vice president and program manager of Boeing Commercial Programs. “The ULA design leverages the heritage hardware of the Atlas V to integrate with the CST-100, setting the baseline for us to proceed to wind tunnel testing and the Launch Segment-level PDR in June.”

In addition to the Launch Vehicle Adapter PDR, Boeing recently completed two additional CCiCap milestones, including the Engineering Release (ER) 2.0 software release and the Landing and Recovery Ground Systems and Ground Communications design review.

The ER 2.0 software release was completed Jan. 25 in Boeing’s Avionics and Software Integration Facility Lab in Houston. This test laid the foundation for the software structure to control and fly the spacecraft, as well as communicate with pilots and ground systems.

The landing and recovery ground systems and ground communications design review Jan. 16 to 18 in Titusville, Fla., established the baseline plan for equipment and infrastructure needed for CST-100 spacecraft ground communications and landing and recovery operations.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 18, 2014

Business: Lockheed to Lose 17 F-35s Under Automatic Pentagon Cuts - Pentagon will cut 17 of the 343 F-35 fighters it planned to buy from Lockheed Martin in fiscal 2016 through 2019 unless Congress repeals automatic budget cuts, according to a new Defense Department report. DOD looking for ways not to break MH-60R helo deal - The...
 
 

News Briefs April 18, 2013

U.S. military deaths in Afghanistan at 2,177 As of April 15, 2014, at least 2,177 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,802 military service members have died in Afghanistan as a result...
 
 
LM-F35-hours

F-35 fleet surpasses 15,000 flying hours

The Lockheed Martin F-35 Lightning II fleet recently surpassed 15,000 flight hours, marking a major milestone for the program.  “Flying 15,000 hours itself demonstrates that the program is maturing, but what I think is e...
 

 
nasa-cassini

NASA Cassini images may reveal birth of new Saturn moon

NASA’s Cassini spacecraft has documented the formation of a small icy object within the rings of Saturn that may be a new moon, and may also provide clues to the formation of the planet’s known moons. Images taken w...
 
 

NASA completes LADEE mission with planned impact on Moon’s surface

Ground controllers at NASA’s Ames Research Center in Moffett Field, Calif., have confirmed that NASA’s Lunar Atmosphere and Dust Environment Explorer spacecraft impacted the surface of the moon, as planned, between 9:30 and 10:22 p.m., PDT, April 17. LADEE lacked fuel to maintain a long-term lunar orbit or continue science operations and was intentionally sent...
 
 
Photograph courtesy of NASA Ames/SETI Institute/JPL-Caltech

NASA’s Kepler telescope discovers first Earth-size planet in ‘habitable zone’

Photograph courtesy of NASA Ames/SETI Institute/JPL-Caltech Kepler-186f resides in the Kepler-186 system about 500 light-years from Earth in the constellation Cygnus. The system is also home to four inner planets, seen lined up...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>