Space

April 8, 2013

NASA Commercial Crew partner Boeing completes launch vehicle adapter review

Boeing in Houston, a NASA Commercial Crew Program partner, has successfully completed a preliminary design review (PDR) of the component that would connect the company’s new crew capsule to its rocket.

The review is one of six performance milestones Boeing has completed for NASA’s Commercial Crew Integrated Capability (CCiCap) initiative, which is intended to make available commercial human spaceflight services for government and commercial customers. The company is on track to complete all 19 of its milestones during CCiCap.

Boeing is one of three U.S. companies NASA is working with during CCiCap to set the stage for a crewed orbital demonstration mission around the middle of the decade. Future development and certification initiatives eventually will lead to the availability of human spaceflight services for NASA to send its astronauts to the International Space Station.

The component that was reviewed is called the Launch Vehicle Adapter. The critical structure is being designed by United Launch Alliance to join Boeing’s Crew Space Transportation-100 (CST-100) spacecraft to ULA’s Atlas V rocket, just above the rocket’s second stage.

“Solid systems engineering integration is critical to the design of a safe system,” said Ed Mango, NASA’s CCP manager. “Boeing and all of NASA’s partner companies are working to build in proper systems integration into their designs. This review with Boeing and their partner ULA was a good review of the current state of these important design interfaces.”

In recent weeks, teams from NASA, Boeing and ULA met at ULA’s headquarters in Denver, Colo., to assess requirements and capabilities to safely launch people into low-Earth orbit from U.S. soil once again. The PDR was a culmination of early development and preliminary analysis to demonstrate the design is ready to proceed with detailed engineering.

“The PDR was an outstanding integrated effort by the Boeing, ULA and NASA teams,” said John Mulholland, vice president and program manager of Boeing Commercial Programs. “The ULA design leverages the heritage hardware of the Atlas V to integrate with the CST-100, setting the baseline for us to proceed to wind tunnel testing and the Launch Segment-level PDR in June.”

In addition to the Launch Vehicle Adapter PDR, Boeing recently completed two additional CCiCap milestones, including the Engineering Release (ER) 2.0 software release and the Landing and Recovery Ground Systems and Ground Communications design review.

The ER 2.0 software release was completed Jan. 25 in Boeing’s Avionics and Software Integration Facility Lab in Houston. This test laid the foundation for the software structure to control and fly the spacecraft, as well as communicate with pilots and ground systems.

The landing and recovery ground systems and ground communications design review Jan. 16 to 18 in Titusville, Fla., established the baseline plan for equipment and infrastructure needed for CST-100 spacecraft ground communications and landing and recovery operations.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 6, 2015

News Long wait to come to America for Iraqis, Afghans who served U.S. troops Long wait times and a shortage of available visas for a huge backlog of applications remain major issues for the U.S. government’s Special Immigrant Visa program intended to ease entry to the United States for Iraqis and Afghans who served as...
 
 

News Briefs July 6, 2015

Russian MiG fighter crashes in southern Russia, pilot lives The Russian Defense Ministry says a Russian air force fighter jet has crashed in the south but its pilot ejected safely. The MiG-29 fighter jet went down July 3 near the village of Kushchevskaya in the Krasnodar region, 620 miles south of Moscow. The ministry said...
 
 
Army photograph by Doug LaFon

Army researcher’s interest in robotics leads to innovative device

Army photograph by Doug LaFon Dan Baechle, left, from the U.S. Army Research Laboratory Multifunctional Materials research team, has created a laboratory prototype of a device he designed to sense and damp out arm tremors for A...
 

 
Air Force photograph by TSgt. Joseph Swafford

Pave Hawk maintainers keep rescue birds flying

Air Force photograph by TSgt. Joseph Swafford Airman Joshua Herron, a 41st Expeditionary Helicopter Maintenance Unit HH-60 Pave Hawk crew chief, completes a 50-hour inspection on a Pave Hawk at Bagram Airfield, Afghanistan, Jun...
 
 
Air Force photograph by SrA. Benjamin Raughton

B-52s demonstrate strategic reach

Air Force photograph by SrA. Benjamin Raughton A B-52H Stratofortress is marshalled to a stop at Barksdale Air Force Base, La., after a 44-hour sortie July 2, 2015. Aircrew members and two B-52s from Barksdale AFB’s 96th ...
 
 

Soldier missing from Korean War accounted for

The Department of Defense POW/MIA Accounting Agency announced July 1 that the remains of a serviceman, missing from the Korean War, have been identified and will be returned to his family for burial with full military honors. Army Sgt. Joseph M. Snock Jr. of Apollo, Pennsylvania, was buried July 6, in Arlington National Cemetery. In...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>