Business

April 8, 2013

United Launch Alliance honors three California-based suppliers with Small Business Excellence Award

United Launch Alliance recently honored three California-based suppliers with a 2012 Small Business Excellence award for their support of the Atlas V and Delta IV launch vehicles.

ULA’s Atlas and Delta vehicles support a wide range of missions including the Department of Defense Evolved Expendable Launch Vehicle Program and NASA science missions, and are poised to launch the next generation of astronauts to the International Space Station.

Hurlen Corporation of Santa Fe Springs, Calif., was recognized for its outstanding support of providing raw materials for both the Atlas V and Delta IV launch vehicles.

Innovative Engineering Solutions Inc. of Murrieta, Calif., demonstrated excellent support to ULA and the U.S. Government programs by providing essential hardware delivery and critical testing services which proved development hardware, and then followed with qualification testing and production support.

Space Vector Corporation of Chatsworth, Calif., supported ULA in the successful design, development, qualification and production of components for the new Global Positioning System metric tracking system, which has flown successfully on three certification missions.

“ULA places a strong emphasis on the value and contribution of small business,” said Mike Jensen, ULA’s vice president of Subcontract Management and Procurement. “Just last year in 2012, we awarded more than $170 million to small businesses throughout the country. Small businesses are the engine of our nation’s economy and ULA is proud to recognize these suppliers who have demonstrated outstanding effort in 2012.”
In the state of California, ULA has 401 suppliers, more than 6,500 ULA and supplier support jobs, and contributes nearly $600 million to the state’s economy.

The EELV program was established by the United States Air Force to provide assured access to space for Department of Defense and other government payloads. The commercially developed EELV Program supports the full range of government mission requirements, while delivering on schedule and providing significant cost savings over the heritage launch systems.

ULA program management, engineering, test, and mission support functions are headquartered in Denver, Colo. Manufacturing, assembly and integration operations are located at Decatur, Ala., and Harlingen, Texas. Launch operations are located at Cape Canaveral AFS, Fla., and Vandenberg AFB, Calif.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 1, 2014

News: Military downsizing leaves U.S. too weak to counter global threats, panel finds - An independent panel appointed by the Pentagon and Congress said July 31 that President Obama’s strategy for sizing the armed services is too weak for today’s global threats. Defense industry funds flow to contenders for key House chairmanships - Four of the top...
 
 

News Briefs August 1, 2014

China allows foreign reporters at news conference Foreign reporters are being allowed to attend China’s Defense Ministry briefings for the first time, marking a small milestone in the increasingly confident Chinese military’s efforts to project a more transparent image. Restrictions still apply and there is no sign of an improvement in the generally paltry amount...
 
 
Army photograph by John Andrew Hamilton

Rapid Equipping Force, PEO Soldier test targeting device at White Sands Missile Range

Army photograph by John Andrew Hamilton SFC Justin Rotti, a combat developer from the Training and Doctrine Command Fire Cell, Fires Center of Excellence, uses a developmental hand held precision targeting device during a test ...
 

 

NASA awards modification for geophysics, geodynamics, space geodesy support contract

NASA has awarded a modification to Stinger Ghaffarian Technologies Inc. of Greenbelt, Md. to continuing working the the Geophysics, Geodynamics and Space Geodesy Support Services contract. The maximum ordering value of the GGSG contract will increase to $76.8 million. The previous amount was $49.5 million. The increase in the maximum ordering value of the contract...
 
 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>