Space

April 10, 2013

Boeing Phantom Phoenix small satellites reduce manufacturing, mission costs

Boeing is developing a family of small satellite prototypes, called Phantom Phoenix, that can quickly and affordably be manufactured and configured for specific missions.

Boeing is developing a family of small satellite prototypes, called Phantom Phoenix, that can quickly and affordably be manufactured and configured for specific missions.

Sharing a common architecture, flight software and simplified payload integration options, the satellites could perform missions ranging from intelligence, surveillance and reconnaissance to planetary science.

“Our customers need greater mission flexibility from smaller satellites that can be built more affordably, and delivered more quickly, without sacrificing quality,” said Boeing Phantom Works President Darryl Davis. “Building upon the success Boeing has had with expanding our 702 satellite family, we’ve rapidly developed a line of satellites to address the market between large geosynchronous spacecraft and nanosatellites.”

The Phantom Phoenix prototypes have three configurations:

  • Phantom Phoenix — 500 to 1,000 kg mid-class; designed for single and dual launch.
  • Phantom Phoenix ESPA — 180 kg ESPA-class; attaches to a common interstage adapter allowing for the launch of more than one satellite at a time. Up to six small satellites could be deployed during a single mission, reducing launch costs.
  • Phantom Phoenix Nano — 4 to 10 kg nanosatellite; offers affordable technology for science and weather missions.

Phantom Phoenix will be designed for all major launch vehicles.

“Boeing has been providing quality satellites to our global customers for over five decades,” said Bruce Chesley, director of Advanced Space & Intelligence Systems. “The Phantom Phoenix prototypes are designed to give our commercial and government customers affordable, agile solutions to address the ever-evolving market and mission requirements.”

Equipped with tailored avionics and selective redundancy options, the satellites meet mission requirements for reliability and service life at an affordable cost. The satellites also feature high autonomy, streamlined operations and low-risk integration. Boeing will conduct initial technology development in Huntington Beach, Calif.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 24, 2015

News: More than $1 billion in U.S. emergency reconstruction aid goes missing in Afghanistan - A total of $1.3 billion that the Pentagon shipped to its force commanders in Afghanistan between 2004 and 2014 for the most critical reconstruction projects can’t be accounted for by the Defense Department, 60 percent of all such spending under an...
 
 

News Briefs April 24, 2015

German defense minister: widely used rifle has no future A widely used assault rifle has “no future” with the German military in its current form, Germany’s defense minister said April 22, escalating a dispute over the weapon’s alleged shortcomings. Ursula von der Leyen said last month that a study showed the G36 rifle has a...
 
 
Army photograph

Composites key to tougher, lighter armaments

Army photograph XM-360 test firing at Aberdeen Proving Ground, Md., in 2007, is shown. The Army is on the cusp of revolutionizing materials that go into armament construction, making for stronger, lighter and more durable weapo...
 

 

Northrop Grumman signs long-term agreement with Raytheon

Northrop Grumman has entered a long-term agreement with Raytheon to supply its LN-200 Inertial Measurement Unit for Raytheon optical targeting systems. The long-term agreement with Raytheon’s Space and Airborne Systems business extends through 2018. The LN-200 provides camera stabilization on optical targeting systems that conduct long-range surveillance and target acquisition for various...
 
 

NTTR supports first F-35B integration into USMC’s weapons school exercise

The Nevada Test and Training Range was part of history April 21, when four U.S. Marine Corps-assigned F-35B Lightning IIs participated in its first Marine Corps’ Final Exercise of the Weapons and Tactics Instructor course on the NTTR’s ranges. The Final Exercise, or FINEX, is the capstone event to the U.S. Marine Corps Marine Aviation...
 
 
AAR-Textron

AAR awarded new contract from Bell Helicopter Textron to support T64 engines

AAR announced April 22 that Bell Helicopter Textron Inc. awarded its Defense Systems & Logistics business unit a contract providing warehouse and logistics services in support of upgrading T64 engines for the Bell V-280 Val...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>