Business

April 10, 2013

Northrop Grumman G/ATOR radar system completes government testing at Wallops Island

The AN/TPS-80 Ground/Air Task Oriented Radar system completed two phases of government developmental testing at the Surface Combat Systems Center in Wallops Island, Va., and has moved into the latest phase of developmental testing in preparation for the future U.S. Marine Corps’ operational assessment.

G/ATOR is the first ground-based, multimission radar to be developed for the U.S. Department of Defense. Designed to detect and track a wide variety of threats, G/ATOR is built with an open, scalable architecture to enable digital interoperability and enables new capabilities to be added through software-only updates. During the recently completed testing, G/ATOR successfully detected and tracked a wide range of targets, including fixed-wing aircraft, helicopters and unmanned autonomous systems.

The testing involved multiple aircraft types with significantly varying sizes, speeds and flight profiles. The flight profiles included simultaneously crossing, converging and diverging flight paths at a wide range of target altitudes in a complex littoral clutter environment.

“The AN/TPS-80 G/ATOR system performed well under the most challenging conditions during these tests, validating the power and flexibility of its open systems architecture,” said Steve McCoy, vice president for tactical sensor solutions at Northrop Grumman. “We anticipate another strong performance as G/ATOR enters its next phase of government testing and moves toward operational service with the Marine Corps.”

 




All of this week's top headlines to your email every Friday.


 
 

 

Navy Awards General Dynamics contract for LCS planning yard services

The U.S. Navy awarded General Dynamics Bath Iron Works a $100 million contract to provide planning yard services for the Littoral Combat Ship program. General Dynamics Bath Iron Works is a business unit of General Dynamics. Bath Iron Works, as the LCS Planning Yard, will provide maintenance and modernization support for all Navy LCS 1...
 
 
boeing-boc

Boeing, BOC Aviation announce order for 82 airplanes

  Boeing announced Aug. 25 an order by BOC Aviation for 50 737 MAX 8s, 30 Next-Generation 737-800s and two 777-300ERs (Extended Range). The order, valued at $8.8 billion at list prices, is the largest in BOC Aviation’...
 
 

F-35 flight test program milestones maturing combat capabilities

The Lockheed Martin F-35 Joint Strike Fighter program continued a steady path of flight test milestones in August, including weapons separation, software compatibility and flight hours, all demonstrating program maturity. “The test milestones are a direct result of the detailed planning, coordination and execution between various government teams and the integrated test force,” said...
 

 
Boeing photograph

Boeing program completes critical design, safety reviews

Boeing photograph Boeing recently completed the Phase Two Spacecraft Safety Review of its Crew Space Transportation-100 spacecraft and the Critical Design Review of its integrated systems, meeting all of the companyís Commerci...
 
 
LM-C130

Keep on Rockin’: C-130J ferries to Little Rock AFB

  The 61st Airlift Squadron at Little Rock Air Force Base, Ark., received another Lockheed Martin C-130J Super Hercules airlifter Aug. 21.  Brig. Gen. Brian Robinson, vice commander, 618th Air and Space Operations Center ...
 
 

Air Force tests Raytheon’s upgraded High-Speed Anti-Radiation Missile

Raytheon Company and the U.S. Air Force successfully flight tested an upgraded High-Speed Anti-Radiation Missile. The HARM Control Section Modification is more precise and accurate, which reduces potential collateral damage. During this test mission, an F-16 aircraft fired an HCSM, AGM-88F, against an emitter located outside of a zone of exclusion, which contained a similar...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>