Defense

April 22, 2013

E-6 Mercury fleet expands, upgrades bandwidth capabilities

The E-6B Mercury’s capability to support U.S. leaders continues to expand with the latest internet protocol expansion. The upgrades to the aircraft’s secure local area computer network now allow the onboard battle staff members to operate virtually.

An internet bandwidth upgrade being rolled out on the E-6B Mercury aircraft, the nationís airborne strategic command platform, is expanding the jetís capability to support the nationís leaders in a crisis.

The Internet Protocol Bandwidth Expansion upgrade was recently installed during a service life extension program overhaul on aircraft 410, which was delivered to the Navy on March 14.

Aircraft 410, part of Fleet Air Reconnaissance Squadron (VQ) 4 at Tinker Air Force Base, Okla., is the third fleet E-6B airborne command post aircraft to receive this upgrade.

The upgrade brings a more robust network capability while saving space and weight, said Curt Rosenbery, IPBE team lead for the E-6 Airborne Strategic Command, Control and Communications Program Office (PMA-271).

The IPBE upgrade is an expanded secure local area computer network for the aircraft currently consisting of two live feeds an ultra-high frequency line of sight digital data feed used while operating over the U.S. and a commercial Inmarsat satellite feed for use when operating outside the U.S., Rosenbery said.

To date, four aircraft have been outfitted with IPBE, one test aircraft located at Pax River and three fleet aircraft belonging to VQ-4. Twelve more E-6Bs are scheduled to get the IPBE upgrade with the last installation scheduled for completion in mid-fiscal 2019, Rosenbery added.

The biggest benefit IPBE brings to the fleet is providing faster, more reliable internet access to information, both classified and unclassified, to the battle staff onboard the aircraft,î said Capt. Dana Dewey, PMA-271ís program manager. Now, the general officers and the battle staff have almost the same level of operational capability as if they were working in their regular offices.

Another benefit of the upgrade was the removal of more than 5,000 pounds of backup equipment from the aircraft. ìWe replaced that equipment with multiple racks of the IPBE servers and routers like those that run military computer networks,î Dewey said.

A fully integrated system with no requirement for carry-on equipment is our ultimate goal for the operational crews, he said.

The E-6B is a dual-mission aircraft that provides survivable, reliable and endurable airborne command, control and communications between the National Command Authority and U.S. strategic and nonstrategic forces and airborne strategic command post mission. The aircraft is equipped with an airborne launch control system.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 30, 2014

News: Software to power F-35 running as much as 14 months late - Software needed to operate Lockheed Martin’s F-35 jet, the Pentagon’s costliest weapons system, may be as much as 14 months late for required flight testing, according to a Pentagon review.   Business: Lockheed will turn on JLTV production line In August; 6-D truck...
 
 

News Briefs July 30, 2014

U.S. military deaths in Afghanistan at 2,197 As of July 29, 2014, at least 2,197 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,819 military service members have died in Afghanistan as a result...
 
 
Lockheed Martin photograph by Tom Reynolds

F-35B successfully completes wet runway, crosswind testing

Lockheed Martin photograph by Tom Reynolds F-35B aircraft BF-4, piloted by Lockheed Martin Test Pilot Dan Levin, starts down the runway as part of wet runway and crosswind testing at Edwards AFB, Calif. In an important program ...
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 
NASA photograph by Carla Thomas

Katherine Lott awarded NASA Armstrong employee scholarship

NASA photograph by Carla Thomas Katherine Lott, the recipient of the 2014 NASA Armstrong Employee Exchange Council Joseph R. Vensel Memorial Scholarship, is congratulated by NASA Armstrong center director David McBride. Flankin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>